Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹41.5 L+₹92,808.80 (2.29%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹43.3 L+₹2.7 L (6.73%)Admitted-Finance NO 1 120 FIRST STREET SANIPOONDI VILLAGE TIRUVANNAMALAI TALUK DISTRICT TAMIL NADU 606 755 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606755 | L3 | Admitted-Finance | |
| 4 | L4₹75.7 L+₹35.1 L (86.4%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Rejected-Technical | - | Rejected-Technical Technically Rejected |
| Sl No | Description | Qty | Unit | THENAPPAN T L4 | M/s MSK Construction L3 | SRI RAGHAVENDRA CONSTRUCTION L2 | KM INFRA L1 |
|---|---|---|---|---|---|---|---|
| 1.01 | Painting two coats to the old MS grill fencing provided around the Fort protected area with superior quality of enamel paint after thoroughly scrapping the old surface etc. complete. | 1,756 | 1SQM | 250 ₹4,39,000 | 120 ₹2,10,720 Lowest | 850 ₹14,92,600 | 380 ₹6,67,280 |
| 1.02 | Earth work excavation in hard soil collecting, conveying the earth away from the Fort by lorry including loading and unloading charges for all around the upper rampart edge without disturbing the base stones etc. (1600x0.23x0.45=165.60m3) | 165.6 | 1CUM | 1,500 ₹2,48,400 | 590 ₹97,704 Lowest | 2,885 ₹4,77,756 | 2,900 ₹4,80,240 |
| 1.03 | Laying plain cement concrete 1:3:6 including consolidating, curing, etc. by using 40mm jelly after cleaning of upper rampart outer edge inside the fort including cost and conveyance of all materials and labour charges etc. (1600x0.23x0.10=36.80m3) | 36.8 | 1CUM | 4,000 ₹1,47,200 Lowest | 5,198.61 ₹1,91,308.85 | 6,950 ₹2,55,760 | 4,579 ₹1,68,507.2 |
| 1.04 | Construction of cut stone masonry for fixing of kerb stone of size 0.45 x 0.23 x0.90 long including chisel fine dressing of four sides at upper rampart outer edge matching to fortification wall with break joints all around inside the fort by laying lime surkhi mortar 1:1:1 with necessary pointing including cost and conveyance of all materials and labour charges etc. complete 1600 Rmt. | 1,600 | 1RMT | 3,200 ₹51,20,000 | 1,500 ₹24,00,000 | 521 ₹8,33,600 Lowest | 539 ₹8,62,400 |
| 1.05 | Spreading of gravel of 0.08m thick upper rampart path way area for easy walk to the visitors / tourists including consolidating watering hand roller rolling etc. complete. (1600x7.00x0.08=896m3) | 896 | 1CUM | 1,800 ₹16,12,800 | 1,600 ₹14,33,600 | 1,220 ₹10,93,120 Lowest | 2,100 ₹18,81,600 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
10 Feb 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Archaeologist
O/o The Superintending Archaeologist, Chennai Circle Fort St George, Chennai-600 009
MW(CONS) TO FORT UPPER RAMPART AND ADJOINING STRUCTURES AT FORT, VELLORE-2018-19
2021_ASI_611328_1
3/5/MW/VEL/2018-19/5670201
Open Tender
Civil Works - Buildings
Works
120 days
Office of the Superintending Archaeologist
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.2 L
Yes
12 Feb 2021
21 Jan 2021
11 Feb 2021
21 Jan 2021
10 Feb 2021
21 Jan 2021
120 days
Amount
Painting two coats to the old MS grill fencing provided around the Fort protected area with superior quality of enamel paint after thoroughly scrapping the old surface etc. complete.
Earth work excavation in hard soil collecting, conveying the earth away from the Fort by lorry including loading and unloading charges for all around the upper rampart edge without disturbing the base stones etc. (1600x0.23x0.45=165.60m3)
Laying plain cement concrete 1:3:6 including consolidating, curing, etc. by using 40mm jelly after cleaning of upper rampart outer edge inside the fort including cost and conveyance of all materials and labour charges etc. (1600x0.23x0.10=36.80m3)
Construction of cut stone masonry for fixing of kerb stone of size 0.45 x 0.23 x0.90 long including chisel fine dressing of four sides at upper rampart outer edge matching to fortification wall with break joints all around inside the fort by laying lime surkhi mortar 1:1:1 with necessary pointing including cost and conveyance of all materials and labour charges etc. complete 1600 Rmt.
Spreading of gravel of 0.08m thick upper rampart path way area for easy walk to the visitors / tourists including consolidating watering hand roller rolling etc. complete. (1600x7.00x0.08=896m3)
SRI RAGHAVENDRA CONSTRUCTION
M/s MSK Construction
THENAPPAN T
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .