Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹13.5 L+₹73,224.62 (5.73%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | G SIVAKUMAR L2 | RANJITHA L1 |
|---|---|---|---|---|---|
| 1.00Construction of Anganwadi Building (PUF Roof Panel) at Ramnagar village in Pattanamkathan Panchayat | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 39.61 | Cum | 240 ₹9,506.4 Lowest | 240 ₹9,506.4 Lowest |
| 3.00 | Sand filling with M.Sand inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., | 7.56 | Cum | 2,000 ₹15,120 Lowest | 2,100 ₹15,876 |
| 4.00 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., | 5.45 | cum | 6,000 ₹32,700 | 5,530 ₹30,138.5 Lowest |
| 5.00 | Collection and supply of Conveyed earth from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 19.79 | cum | 100 ₹1,979 Lowest | 103 ₹2,038.37 |
| 6.00 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. | 31.43 | cum | 6,200 ₹1,94,866 | 5,376 ₹1,68,967.68 Lowest |
| 7.00 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 15.38 | cum | 9,700 ₹1,49,186 | 8,738.95 ₹1,34,405.05 Lowest |
| 8.00 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 1,285 | kg | 81 ₹1,04,085 | 77.8 ₹99,973 Lowest |
| 9.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,(Below Basement) | 82.66 | sqm | 500 ₹41,330 | 467 ₹38,602.22 Lowest |
| 10.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., (Above Basement) | 34.43 | sq.m | 950 ₹32,708.5 Lowest | 950 ₹32,708.5 Lowest |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
12 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer,Mandapam Union
Block Development Officer,Mandapam Union
Construction of Anganwadi Building at Ramnagar Village in Pattanamkathan Panchayat.
2026_RDTN_723810_1
A2/1605/2025-MDM-CSR-2026-2027
Open Tender
Civil Works
Item Rate
Mandapam Panchayat Union
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,000
Yes
17 Nov 2026
6 Nov 2026
12 Nov 2026
6 Nov 2026
12 Nov 2026
6 Nov 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Anganwadi Building (PUF Roof Panel) at Ramnagar village in Pattanamkathan Panchayat | - | - | - | - |
| 2 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 39.61 | Cum | - | - |
| 3 | Sand filling with M.Sand inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., | 7.56 | Cum | - | - |
| 4 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., | 5.45 | cum | - | - |
| 5 | Collection and supply of Conveyed earth from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 19.79 | cum | - | - |
| 6 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. | 31.43 | cum | - | - |
| 7 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 15.38 | cum | - | - |
| 8 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 1,285 | kg | - | - |
| 9 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,(Below Basement) | 82.66 | sqm | - | - |
| 10 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., (Above Basement) | 34.43 | sq.m | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.24 MB
CSR01.pdf
Tender Documents • 0.38 MB
BOQ_868949.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .