| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.0 LAccepted-AOC SAYED MUSTAFA ALI ROAD HAKIMPARA P O SILIGURI 734001 DISTT DARJEELING W B INDEX NO E 139 BENG 2010 | DARJEELING | WEST BENGAL | 734001 | L1 | Accepted-AOC BEING LOWEST BIDDER | |
| 2 | L2₹32.4 L+₹1.7 L (5.69%)Rejected-Finance | L2 | Rejected-Finance BEING OTHER
THAN LOWEST BIDDER | |
| 3 | L3₹34.1 L+₹3.4 L (11.0%)Rejected-Finance ROOM NO 13 HIMALAYA SHOPPING COMPLEX NELI SENGUPTA SARANI BABU PARA DARJEELING WEST BENGAL 734004 | DARJEELING | WEST BENGAL | 734004 | L3 | Rejected-Finance BEING OTHER
THAN LOWEST BIDDER | |
| 4 | L4₹34.1 L+₹3.4 L (11.2%)Rejected-Finance SREE COLONY BAGDOGRA PO BAGDOGRA DIST DARJEELING WB | L4 | Rejected-Finance BEING OTHER
THAN LOWEST BIDDER | |
| 5 | L5₹34.8 L+₹4.1 L (13.3%)Rejected-Finance SIMULBARI T E PO VILL SIMULBARI PS KURSEONG DIST DARJEELING PIN 734009 WEST BENGAL | SIMULBARI | DARJEELING | WEST BENGAL | 734009 | L5 | Rejected-Finance BEING OTHER
THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | Engineers India L2 | Barua Trading Co. L1 | MS ORIENT ENGINEERING WORKS L6 | M/S S.B. CONSTRUCTION L4 | KARMIBRINDA L8 | Janata Enterprises L7 | R N SAH N CO L5 | Manish Ray and Co. L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for dehydration of transformer oil through on load mobile stream line transformer oil filtration plant at site with all accessories connected to transformer and carrying out filtration of oil for desired dielectric strength i.e. not less than 55 KV at 2.5 mm gap
Note:- Oil to be tested before and after filtration and test report to be submitted by the contractor, complete all as specified and as directed by Engineer- in- charge. | 2,000 | LTR | 11 ₹22,000 | 7 ₹14,000 Lowest | 10 ₹20,000 | 9.75 ₹19,500 | 10 ₹20,000 | 50 ₹1,00,000 | 10 ₹20,000 | 10 ₹20,000 |
| 2.00 | Labour only for shifting of transformers from one location to another by disconnecting both HT and LT connection from cable end box and taking down existing transformers from any location (Upto 45KM) by using cranes or suitable arrangement and refixing at a location and making HT/LT connection at a location , complete all as specified and as directed by Engineer- in- charge.
Note: 1. The quoted rates shall be inclusive of cost for hiring cranes,Labours,Tools and transportation cost involved. | 2 | EACH JOB | 4,000 ₹8,000 | 3,800 ₹7,600 Lowest | 4,560 ₹9,120 | 4,275 ₹8,550 | 4,900 ₹9,800 | 4,700 ₹9,400 | 4,180 ₹8,360 | 4,200 ₹8,400 |
| 3.00 | Disconnection of both HT and LT connection from cable end box, taking down the disconnected transformer(Outdoor/indoor type) from platform, and transportation of unserviceable transformer complete unit to contractor workshop including loading/unloading of capacity 63KVA to 150KVA, 11/0.433 KV complete all as specified and as directed by Engineer- in- charge.
(a) Disconnecting and taking down faulty / defective copper wound transformer , opening the top cover, draining out unserviceable insulation oil, and carrying out the following work.
(b) Complete Rewinding of HT / LT leg coil complete using copper wire of appropriate gauge, size and turn as existing with double paper coated insulation including all requisite insulating materials like packing sleeves, separator, tapes etc. as specified and existing, heating, varnishing the core and winding assembly after framing up top and bottom steel structure of transformer all as specified and directed. (HT / LT Leg coils copper wound shall be measured and paid separately under relevant item of Sch ‘A’ here-in-after).
(c) Replacement of all insulating materials other than incorporated for rewinding of LT/HT coils as existing.
(d) Fixing of HT porcelain bushing with studs, nuts, washers 3 Nos and LT porcelain bushing with studs, nuts and washers 4 Nos and connection with primary and secondary winding main terminals all as directed and specified. (HT/LT bush with stud, nuts, washers shall be measured and paid separately under relevant item of this Schedule ) | 2 | EACH JOB | 11,700 ₹23,400 | 11,000 ₹22,000 Lowest | 14,500 ₹29,000 | 11,975 ₹23,950 | 14,300 ₹28,600 | 13,800 ₹27,600 | 12,100 ₹24,200 | 12,290 ₹24,580 |
| 3.01contd/-- item no 3.00 (e) Fixing only existing serviceable accessories as obtained from Ser No (a) after proper cleaning, minor repair etc all as required and directed (f) Replacement of all gasket materials in top cover, HT, LT bushing using rubberized gasket sheet 4.0/6.0 mm thick duly pasted with gasket cement. (g) Replacement of unserviceable bolts, fixing of existing serviceable bolts, nuts, washers of different size and tightening properly. (h) Repositioning of core and winding assembly inside the tank, assembling the complete unit and filling of transformer oil and subsequent testing complete all as directed. (i) Type Tests as per clause 16.1.1 and routine test as per clause 16.1.2 of IS-2026 (Part I)-1977. are to be carried out at manufacturer work shop all as directed.(j) Shifting the transformer from its original side to manufacturer work shop and Redenbach after repair including reconnection of HT/LT cables and including subsequent testing complete all as directed.(k) Rewind works to be carried out in any reputed transformer manufacturer work shop and routine test are to be done at said work shop complete all as specified and as directed by Engr-in-charge and as per IS provisions stated above. Note: Distance from site to contractor transformer workshop is deemed to be included in quoted rates. | |||||||||||
| 4.00 | All as per serial item No. 03 as above but of capacity 200 KVA to 315KVA, 11/0.433 KV but Using copper winding wire/strips of Appropriate gauge/size for rewinding, complete all as specified and as directed by Engineer- in- charge.
(HT / LT Leg coils shall be measured and paid separately under relevant item of this schedule), complete all as specified and as directed by Engineer- in- charge. | 1 | EACH JOB | 10,700 ₹10,700 | 10,000 ₹10,000 Lowest | 12,500 ₹12,500 | 11,150 ₹11,150 | 13,000 ₹13,000 | 12,600 ₹12,600 | 11,100 ₹11,100 | 11,240 ₹11,240 |
| 5.00 | All as per serial item No. 03 as above but of capacity 400 KVA to 750KVA, 11/0.433 KV but Using copper winding wire/strips of Appropriate gauge/size for rewinding, complete all as specified and as directed by Engineer- in- charge.
(HT / LT Leg coils shall be measured and paid separately under relevant item of this schedule), complete all as specified and as directed by Engineer- in- charge. | 1 | EACH JOB | 11,700 ₹11,700 | 11,000 ₹11,000 Lowest | 13,200 ₹13,200 | 11,975 ₹11,975 | 14,300 ₹14,300 | 13,800 ₹13,800 | 12,210 ₹12,210 | 12,290 ₹12,290 |
| 6.00 | Supply only pure Nomax paper class 'F' for transformer coil insulation for insulation for HT & LT coil in any type of transformers of specified rating, complete all as specified and as directed by Engineer- in- charge. | 4 | PER KG | 8,500 ₹34,000 | 8,000 ₹32,000 Lowest | 9,600 ₹38,400 | 8,925 ₹35,700 | 10,400 ₹41,600 | 10,000 ₹40,000 | 8,820 ₹35,280 | 8,930 ₹35,720 |
| 7.00 | Supply only LT leg coil of copper conductor/ strips for transformer of capacity up to 1000 KVA complete with insulation, varnishing by vacuum impregnation and baking of coil assembly, etc, complete all as specified and as directed by Engineer- in- charge. | 100 | PER KG | 1,300 ₹1,30,000 | 1,250 ₹1,25,000 Lowest | 1,600 ₹1,60,000 | 1,426 ₹1,42,600 | 1,625 ₹1,62,500 | 1,575 ₹1,57,500 | 1,390 ₹1,39,000 | 1,370 ₹1,37,000 |
| 8.00 | Supply only HT leg coil of copper conductor for transformer of capacity up to 1000 KVA complete with insulation, varnishing by vacuum impregnation and baking of coil assembly, etc, complete all as specified and as directed by Engineer- in- charge. | 150 | PER KG | 1,300 ₹1,95,000 | 1,250 ₹1,87,500 Lowest | 1,650 ₹2,47,500 | 1,426 ₹2,13,900 | 1,625 ₹2,43,750 | 1,575 ₹2,36,250 | 1,390 ₹2,08,500 | 1,370 ₹2,05,500 |
| 9.00 | Disconnecting the transformer (plinth/ pole mounted/ outdoor/ indoor 11 KV/ 433 volts) from HT/ LT system and opening carefully by draining out the transformer oil for stopping the leakages by replacing the following unserviceable spare parts of capacity 63 KVA to 750 KVA including refilling the transformer oil and reassembling after repairs and ensuring no leakages, loose connections on HT/ LT side & charging the system complete all as specified and as directed in (Spare parts will be measured and paid separately under relevant supply only items), complete all as specified and as directed by Engineer- in- charge. | 7 | EACH JOB | 2,600 ₹18,200 | 2,500 ₹17,500 Lowest | 3,000 ₹21,000 | 2,725 ₹19,075 | 3,250 ₹22,750 | 3,150 ₹22,050 | 2,800 ₹19,600 | 2,730 ₹19,110 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
17 Feb 2026, 6:00 pmClosed
CWE BINNAGURI
HQ CWE BINNAGURI, BINNAGURI CANTT, JALPAIGURI, WEST BENGAL, PIN-735232
REPAIR/ MAINT TO HT LINE AND UG CABLE INCLUDING VCBS, HT PANELS FOR 11/33 KV SUB STATION AT BAGRAKOTE MILITARY STATION UNDER GE SEVOKE ROAD
2026_MES_749127_2
8319/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
SEVOKE ROAD MIL STN
AS PER NIT
8 documents required · 8 mandatory
₹500
GE SEVOKE ROAD
₹60,000
Yes
24 Mar 2026
3 Feb 2026
18 Feb 2026
3 Feb 2026
17 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for dehydration of transformer oil through on load mobile stream line transformer oil filtration plant at site with all accessories connected to transformer and carrying out filtration of oil for desired dielectric strength i.e. not less than 55 KV at 2.5 mm gap
Note:- Oil to be tested before and after filtration and test report to be submitted by the contractor, complete all as specified and as directed by Engineer- in- charge. | 2,000 | LTR | 1 | ₹2,000 |
| 2 | Labour only for shifting of transformers from one location to another by disconnecting both HT and LT connection from cable end box and taking down existing transformers from any location (Upto 45KM) by using cranes or suitable arrangement and refixing at a location and making HT/LT connection at a location , complete all as specified and as directed by Engineer- in- charge.
Note: 1. The quoted rates shall be inclusive of cost for hiring cranes,Labours,Tools and transportation cost involved. | 2 | EACH JOB | 1 | ₹2 |
| 3 | Disconnection of both HT and LT connection from cable end box, taking down the disconnected transformer(Outdoor/indoor type) from platform, and transportation of unserviceable transformer complete unit to contractor workshop including loading/unloading of capacity 63KVA to 150KVA, 11/0.433 KV complete all as specified and as directed by Engineer- in- charge.
(a) Disconnecting and taking down faulty / defective copper wound transformer , opening the top cover, draining out unserviceable insulation oil, and carrying out the following work.
(b) Complete Rewinding of HT / LT leg coil complete using copper wire of appropriate gauge, size and turn as existing with double paper coated insulation including all requisite insulating materials like packing sleeves, separator, tapes etc. as specified and existing, heating, varnishing the core and winding assembly after framing up top and bottom steel structure of transformer all as specified and directed. (HT / LT Leg coils copper wound shall be measured and paid separately under relevant item of Sch ‘A’ here-in-after).
(c) Replacement of all insulating materials other than incorporated for rewinding of LT/HT coils as existing.
(d) Fixing of HT porcelain bushing with studs, nuts, washers 3 Nos and LT porcelain bushing with studs, nuts and washers 4 Nos and connection with primary and secondary winding main terminals all as directed and specified. (HT/LT bush with stud, nuts, washers shall be measured and paid separately under relevant item of this Schedule ) | 2 | EACH JOB | 1 | ₹2 |
| 3.01 | contd/-- item no 3.00
(e) Fixing only existing serviceable accessories as obtained from Ser No (a) after proper cleaning, minor repair etc all as required and directed
(f) Replacement of all gasket materials in top cover, HT, LT bushing using rubberized gasket sheet 4.0/6.0 mm thick duly pasted with gasket cement.
(g) Replacement of unserviceable bolts, fixing of existing serviceable bolts, nuts, washers of different size and tightening properly.
(h) Repositioning of core and winding assembly inside the tank, assembling the complete unit and filling of transformer oil and subsequent testing complete all as directed.
(i) Type Tests as per clause 16.1.1 and routine test as per clause 16.1.2 of IS-2026 (Part I)-1977. are to be carried out at manufacturer work shop all as directed.(j) Shifting the transformer from its original side to manufacturer work shop and Redenbach after repair including reconnection of HT/LT cables and including subsequent testing complete all as directed.(k) Rewind works to be carried out in any reputed transformer manufacturer work shop and routine test are to be done at said work shop complete all as specified and as directed by Engr-in-charge and as per IS provisions stated above.
Note: Distance from site to contractor transformer workshop is deemed to be included in quoted rates. | - | - | - | - |
| 4 | All as per serial item No. 03 as above but of capacity 200 KVA to 315KVA, 11/0.433 KV but Using copper winding wire/strips of Appropriate gauge/size for rewinding, complete all as specified and as directed by Engineer- in- charge.
(HT / LT Leg coils shall be measured and paid separately under relevant item of this schedule), complete all as specified and as directed by Engineer- in- charge. | 1 | EACH JOB | 1 | ₹1 |
| 5 | All as per serial item No. 03 as above but of capacity 400 KVA to 750KVA, 11/0.433 KV but Using copper winding wire/strips of Appropriate gauge/size for rewinding, complete all as specified and as directed by Engineer- in- charge.
(HT / LT Leg coils shall be measured and paid separately under relevant item of this schedule), complete all as specified and as directed by Engineer- in- charge. | 1 | EACH JOB | 1 | ₹1 |
| 6 | Supply only pure Nomax paper class 'F' for transformer coil insulation for insulation for HT & LT coil in any type of transformers of specified rating, complete all as specified and as directed by Engineer- in- charge. | 4 | PER KG | 1 | ₹4 |
| 7 | Supply only LT leg coil of copper conductor/ strips for transformer of capacity up to 1000 KVA complete with insulation, varnishing by vacuum impregnation and baking of coil assembly, etc, complete all as specified and as directed by Engineer- in- charge. | 100 | PER KG | 1 | ₹100 |
| 8 | Supply only HT leg coil of copper conductor for transformer of capacity up to 1000 KVA complete with insulation, varnishing by vacuum impregnation and baking of coil assembly, etc, complete all as specified and as directed by Engineer- in- charge. | 150 | PER KG | 1 | ₹150 |
| 9 | Disconnecting the transformer (plinth/ pole mounted/ outdoor/ indoor 11 KV/ 433 volts) from HT/ LT system and opening carefully by draining out the transformer oil for stopping the leakages by replacing the following unserviceable spare parts of capacity 63 KVA to 750 KVA including refilling the transformer oil and reassembling after repairs and ensuring no leakages, loose connections on HT/ LT side & charging the system complete all as specified and as directed in (Spare parts will be measured and paid separately under relevant supply only items), complete all as specified and as directed by Engineer- in- charge. | 7 | EACH JOB | 1 | ₹7 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
8319Tenderdocumenns.pdf
Tender Documents • 0.98 MB
BOQ_841284.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .