Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 CrAccepted-AOC | ₹5.6 Cr Quoted ₹4.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.0 Cr+₹22.7 L (4.79%)Rejected-Finance R O DALIPORA PULWAMA | PULWAMA | JAMMU AND KASHMIR | 191102 | ₹5.0 Cr+₹22.7 L (4.79%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.2 Cr+₹47.0 L (9.93%)Rejected-Finance | ₹5.2 Cr+₹47.0 L (9.93%) | L3 | Rejected-Finance L3 |
| 4 | L4₹5.4 Cr+₹64.8 L (13.7%)Rejected-Finance | ₹5.4 Cr+₹64.8 L (13.7%) | L4 | Rejected-Finance L4 |
| 5 | L5₹5.4 Cr+₹70.6 L (14.9%)Rejected-Finance NOWBUGH CHADOORA | JAMMU | JAMMU AND KASHMIR | 180001 | ₹5.4 Cr+₹70.6 L (14.9%) | L5 | Rejected-Finance L5 |
Tender Value
₹8.3 Cr
EMD Value
₹16.5 L
Closing Date
15 Sept 2025, 4:30 pmClosed
Chief Engineer PMGSY Kashmir
Engineering Complex Bund Road near Govt. Silk factory Showroom Rajbagh Srinagar-190008
Construction and maintenance of road from L023 Link from Bathnoor Karmulla road end point To Bugmud, (Waste Plastic Technology), JK10-4013, Length 4.00 KM, stage Complete, PMGSY-IV (Batch-I, 2025-26), PMGSY Division Pulwama.
2025_KSRRD_144193_1
JK104013
Open Tender
CIVIL
Percentage
548 days
Pulwama
Please refer Tender documents.
20 documents required · 20 mandatory
₹10,000
₹16.5 L
Office of Chief Engineer PMGSY Kashmir
19 Nov 2025
23 Aug 2025
16 Sept 2025
26 Aug 2025
15 Sept 2025
31 Aug 2025
30 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 7.83 MB
SBD-JK10-4013.pdf
Tender Documents • 0.68 MB
BOQ_223523.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .