| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-Finance | ₹1.6 Cr | L1 | Accepted-Finance Low Rate |
| 2 | L2₹1.8 CrRejected-Finance H NO 53 A VIVEKA PUBMIC SCHOOL PASUPATI NAGAR KIDWAI NAGAR KANPUR NAGAR UP KANPUR NAGAR UTTAR PRADESH 208011 | KANPUR NAGAR | UTTAR PRADESH | 208011 | ₹1.8 Cr | L2 | Rejected-Finance High Rate |
| 3 | L3₹1.8 CrRejected-Finance | ₹1.8 Cr | L3 | Rejected-Finance High Rate |
Tender Value
₹1.8 Cr
EMD Value
₹10.9 L
Closing Date
19 Mar 2026, 12:00 pmClosed
SE Kanpur Circle PWD Kanpur
SE Kanpur Circle PWD Kanpur
New Construction of Barra Khanpur to Lucknow Agra Express Way Baranda Rajkumari Shitalay road. (By HMP) (Including 05 Years maintenance cost)
2026_CEKNP_1123737_10
1229C/131C-KV/2025-26 Dt. 27.02.2026
Open Tender
Civil Works - Roads
365 days
Kanpur Nagar
Please refer tender documents
2 documents required · 2 mandatory
₹4,740
₹10.9 L
Yes
SE Kanpur Circle PWD Kanpur
2 Jun 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
13 Mar 2026
Construction of embankment with approved material obtained from borrow pits with all lifts upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1 and 300.2 with lead up to 1000m as per technical specification clause 301.5
Providing, laying and spreading material on a prepared subgrade, adding cement @ 2% by weight to the spread material manually, mixing in place with Rotavator and compacting with the Road Roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base.
Providing, laying and spreading material on a prepared base, cement @ 4% by weight to the spread material manually, mix in place with Rotavator and compacting with the Road Roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base.
Tack Coat (i) Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 to 0.45 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.Clause 503. MORD. Including Bitumen VG-10.
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. Case - II By Mechanical Means(HMP 30/40) (I) Bitumen VG-10
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Case - III : Type C By Mechanical Means(HMP 30/40) (I) Bitumen VG-10
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1..
Providing and Laying Reinforced Cement Concrete Pipe NP-3(350 mm Dia Hume Pipe Gule)
Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 II. Brick masonry in 1:4 cement mortar
Supply and laying & fixing of NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. complete. 750 mm Dia
Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause MORD 613.3
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete.
Providing and laying plain cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 (M-20)
Drainage spouts complete as per drawing and technical specification clause 1209 (150 mm dia PVC pipe Only)
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202.
Filling brickbats as filler material between roadcrust and abutment .
Providing and laying Road furniture,Km stone,Hm. stone etc.
Maintenance of bituminious surface road including including filling pot holes and patch repair etc, restoration of rain cuts and dressing of side slopes / shoulders, drains, culverts, guard rail and parapets, road signs, speed brakers, standing tree adjacent to road wherever required, kilimeter stone and hectometer stone, cutting of branches of trees, shrubs and trimming of grass and weeds etc, white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) (I) Maintainance of First Year (@0% of Total Work Amount of 1 to 23)
Maintenance of bituminious surface road including including filling pot holes and patch repair etc, restoration of rain cuts and dressing of side slopes / shoulders, drains, culverts, guard rail and parapets, road signs, speed brakers, standing tree adjacent to road wherever required, kilimeter stone and hectometer stone, cutting of branches of trees, shrubs and trimming of grass and weeds etc, white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) Maintenance cost for 2nd year @ 0.75% cost of work of Total work of amount 1 to 23
Maintenance of bituminious surface road including including filling pot holes and patch repair etc, restoration of rain cuts and dressing of side slopes / shoulders, drains, culverts, guard rail and parapets, road signs, speed brakers, standing tree adjacent to road wherever required, kilimeter stone and hectometer stone, cutting of branches of trees, shrubs and trimming of grass and weeds etc, white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) Maintenance cost for 3rd year @ 1.50% cost of work of Total work of amount 1 to 23
Maintenance of bituminious surface road including including filling pot holes and patch repair etc, restoration of rain cuts and dressing of side slopes / shoulders, drains, culverts, guard rail and parapets, road signs, speed brakers, standing tree adjacent to road wherever required, kilimeter stone and hectometer stone, cutting of branches of trees, shrubs and trimming of grass and weeds etc, white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) Maintenance cost for 4th year @ 2.25% cost of work of Total work of amount 1 to 23.
Maintenance of bituminious surface road including including filling pot holes and patch repair etc, restoration of rain cuts and dressing of side slopes / shoulders, drains, culverts, guard rail and parapets, road signs, speed brakers, standing tree adjacent to road wherever required, kilimeter stone and hectometer stone, cutting of branches of trees, shrubs and trimming of grass and weeds etc, white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Anexure-2) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated16.01.2024 & Enc lettere no. 3689/C-OPRMC/MUL-2023-24 dated 17.02.2024) Maintenance cost for 5th year @ 3.00% cost of work of Total work of amount 1 to 23.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
Tendernotice_2.pdf
PDF • 2.43 MB
BOQ_2093871.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid