| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.0 LAccepted-AOC B 101 SURAJ TOWER MIRA BHAYANDER ROAD OPP SAI PETROL PUMP MIRA ROAD EAST THANE 401107 | MIRA ROAD EAST | THANE | MAHARASHTRA | 401107 | L1 | Accepted-AOC L1 | |
| 2 | L2₹31.3 L+₹37,385 (1.21%)Rejected-Finance 1 2 GR FLOOR VITHALKUNJ NO 3 V P ROAD ANDHERI WEST MUMBAI 400 058 | MUMBAI SUBURBAN | MAHARASHTRA | 400058 | L2 | Rejected-Finance Not Reasonable | |
| 3 | L3₹33.6 L+₹2.6 L (8.52%)Rejected-Finance | L3 | Rejected-Finance Not Reasonable | |
| 4 | L4₹33.6 L+₹2.6 L (8.54%)Rejected-Finance 1202 SAI PROVISO DHNISHT PLOT NO 72 73 SECTOR 20 KOPARKHAIRANE NAVI MUMBAI | THANE | MAHARASHTRA | 400601 | L4 | Rejected-Finance Not Reasonable | |
| 5 | L5₹37.7 L+₹6.8 L (21.8%)Rejected-Finance | L5 | Rejected-Finance Not Reasonable |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
3 Jan 2023, 6:00 pmClosed
Saurabh Gupta, EE
GE (W) Colaba, Mumbai
REPAIR AND REPLACEMENT OF FIRE ALRAM SYSTEM, FIRE HOSE REEL, DRUM, HYDRANTS AND CONNECTED ITEMS AND PERIODICAL TESTING OF FIRE FIGHTING SYSTEM AT COLABA MIL STN UNDER GE WEST COLABA
2022_MES_567673_1
8690/E8
Open Tender
Civil Works
Item Rate
234 days
GE (W) Colaba
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (W) Colaba, Mumbai
₹90,000
Yes
16 Jan 2023
6 Dec 2022
5 Jan 2023
6 Dec 2022
3 Jan 2023
20 Dec 2022
Amount
Part-I (Comprehensive Maintenance) Routine maintenance of fire fighting system, fire alarm system by attending fault testing of system, monthly checking of system, etc. including replacement of unserviceable components/parts other than those mentioned in schedule “A” Part-II for fire fighting system, fire alarm system installed at TILOTAMA Building (G+12) comprising following:- (a) Main fire alarm control panel with each zone battery charger and 230 V power units. (b) Ionization type smoke detector, head detector, response indicator, manual call point and hooters etc. (c) All wiring & cable connections (d) Lead acid battery 12V/9AH capacity. (e) 100HP main fire hydrant pump servicing & testing (01 No) (f) Testing of electrical control panel of fire fighting system water pumps. (g) Testing of pressure switch & pressure guage. (h) Testing of all sluice valve, NRV & Air Release valve P.M.
Routine maintenance of fire fighting system, fire alarm system by attending fault testing of system, monthly checking of system etc. including replacement of unserviceable components/parts other than those mentioned in schedule “A” Part-II for fire fighting system, fire alarm system installed at MENKA building (G+13) comprising of the following:- (a) Main fire alarm control panel with each zone battery charger and 230 V power units. (b) Ionization type smoke detector, head detector, response indicator, manual call point and hooters etc. (c) All wiring & cable connections. (d) Lead acid battery 12V/9AH capacity. (e) 100HP main fire hydrant pump servicing & testing (01 Nos.). (f) 5 HP priming pump servicing & testing (01 No.). (g) Testing of electrical control panel of fire fighting system water pumps. (h) Testing of pressure switch & pressure guage. (i) Testing of all sluice valve, NRV & Air release valve.
Routine maintenance of fire fighting system, fire alarm system by attending fault testing of system, monthly checking of system etc. including replacement of unserviceable components/parts other than those mentioned in schedule “A” Part-II for fire fighting system, fire alarm system installed at CHITRALEKHA Building (G+13) comprising of the following:- (a) Main fire alarm control panel with each zone battery charger and 230 V power units. (b) Ionization type smoke detector, head detector, response indicator, manual call point and hooters etc. (c) All wiring & cable connections. (d) Lead acid battery 12V/9AH capacity. (e) Testing of electrical control panel of fire fighting system water pumps. (f) Testing of pressure switch & pressure guage. (g) Testing of all sluice valve, NRV & Air release valve.
Routine maintenance of fire fighting system, fire alarm system by attending fault testing of system, monthly checking of system etc. including replacement of unserviceable components/parts other than those mentioned in schedule “A” Part-II for fire fighting system, fire alarm system installed at S&T COMPLEX Building (G+8) both 02 wings comprising following:- (a) Main fire alarm control panel with each zone battery charger and 230 V power units. (b) Ionization type smoke detector, head detector, response indicator, manual call point and hooters etc. (c) All wiring & cable connections. (d) Lead acid battery 12V/9AH capacity. (e) 60HP main fire hydrant pump servicing & testing (01 Nos.). (f) Testing of electrical control panel of fire fighting system water pumps. (h) Testing of pressure switch & pressure guage. (i) Testing of all sluice valve, NRV & Air release valve.
Routine maintenance of fire fighting system, fire alarm system by attending fault testing of system, monthly checking of system etc. including replacement of unserviceable components/parts other than those mentioned in schedule “A” Part-II for fire fighting system, fire alarm system installed at Agastya building (G+12) comprising following:- (a) Main fire alarm control panel with each zone battery charger and 230 V power units. (b) Ionization type smoke detector, head detector, response indicator, manual call point and hooters etc. (c) All wiring & cable connections. (d) Lead acid battery 12V/9AH capacity. (e) 100 HP main fire hydrant pump servicing & testing (01 Nos.). (f) 15HP Jockey pump servicing & testing (01 No.). (g) Testing of electrical control panel of fire fighting system water pumps. (h) Testing of pressure switch & pressure guage. (i) Testing of all sluice salve, NRV & Air release Valve.
Routine maintenance of fire fighting system, fire alarm system by attending fault testing of system, monthly checking of system etc. including replacement of unserviceable components/parts other than those mentioned in schedule “A” Part-II for fire fighting system, fire alarm system installed at suvarna building (G+6) comprising of the following:- (a) Main fire alarm control panel with each zone battery charger and 230 V power units. (b) Ionization type smoke detector, head detector, response indicator, manual call point and hooters etc. (c) All wiring & cable connections. (d) Lead acid battery 12V/9AH capacity. (e) Testing of electrical control panel of fire fighting system water pumps. (f) Testing of pressure switch & pressure guage. (g) Testing of all sluice valve, NRV & Air release valve.
Routine maintenance of fire fighting system, fire alarm system by attending fault testing of system, monthly checking of system etc. including replacement of unserviceable components/parts other than those mentioned in schedule “A” Part-II for fire fighting system, fire alarm system installed at Brahmaputra building (G+14) comprising of the following:- (a) Main fire alarm control panel with each zone battery charger and 230 V power units. (b) Ionization type smoke detector, head detector, response indicator, manual call point and hooters etc. (c) All wiring & cable connections. (d) Lead acid battery 12V/9AH capacity. (e) 100 HP main fire hydrant pump servicing & testing (03 Nos.). (f) 15 HP Jockey pump servicing & testing (03 Nos.). (g) Testing of electrical control panel of fire fighting system water pumps. (h) Testing of pressure switch & pressure guage. (i) Testing of all sluice valve, NRV & Air release valve.
Routine maintenance of fire fighting system, fire alarm system by attending fault testing of system, monthly checking of system etc. including replacement of unserviceable components/parts other than those mentioned in schedule “A” Part-II for fire fighting system, fire alarm system installed at P-106 Building (G+12) comprising of the following:- (a) Main fire alarm control panel with each zone battery charger and 230 V power units. (b) Ionization type smoke detector, head detector, response indicator, manual call point and hooters, etc. (c) All wiring & cable connections. (d) Lead acid battery 12V/9AH capacity. (e) 60 HP main fire hydrant pump servicing & testing (01 Nos.). (f) 40HP fire pump servicing & testing (01 No.). (g) Testing of electrical control panel of fire fighting system water pumps. (h) Testing of pressure switch & pressure guage. (i) Testing of all sluice valve, NRV & Air release valve.
Routine maintenance of fire fighting system, fire alarm system by attending fault testing of system, monthly checking of system etc. including replacement of unserviceable components/parts other than those mentioned in schedule “A” Part-II for fire fighting system, fire alarm aystem installed at P-120 Building (G+14) comprising of the following:- (a) Main fire alarm control panel with each zone battery charger and 230 V power units. (b) Ionization type smoke detector, head detector, response indicator, manual call point and hooters etc. (c) All wiring & cable connections. (d) Lead acid battery 12V/9AH capacity. (e) Testing of pressure switch & pressure guage. (f) Testing of all sluice valve, NRV & Air release valve.
Routine maintenance of fire fighting system, fire alarm system by attending fault testing of system, monthly checking of system etc. including replacement of unserviceable components/parts other than those mentioned in schedule “A” Part-II for fire fighting system, fire alarm system installed at P-121 Building (G+12) comprising of the following:- (a) Main fire alarm control panel with each zone battery charger and 230 V power units. (b) Ionization type smoke detector, head detector, response indicator, manual call point and hooters etc. (c) All wiring & cable connections. (d) Lead acid battery 12V/9AH capacity. (e) Testing of pressure switch & pressure guage. (f) Testing of all sluice valve, NRV & Air release valve.
Routine maintenance of fire fighting system, fire alarm system by attending fault testing of system, monthly checking of system etc. including replacement of unserviceable components/parts other than those mentioned in schedule “A” Part-II for fire fighting system, fire alarm system installed at P-112 Building (G+12) comprising of the following:- (a) Main fire alarm control panel with each zone battery charger and 230 V power units. (b) Ionization type smoke detector, head detector, response indicator, manual call point and hooters etc. (c) All wiring & cable connections. (d) Lead acid battery 12V/9AH capacity. (e) Testing of pressure switch & pressure guage. (f) Testing of all sluice valve, NRV & Air release valve.
Routine maintenance of fire fighting system, fire alarm system by attending fault testing of system, monthly checking of system etc. including replacement of unserviceable components/parts other than those mentioned in schedule “A” Part-II for fire fighting system, fire alarm system installed at P-107 Building (G+14) comprising of the following:- (a) Main fire alarm control panel with each zone battery charger and 230 V power units. (b) Ionization type smoke detector, head detector, response indicator, manual call point and hooters etc. (c) All wiring & cable connections. (d) Lead acid battery 12V/9AH capacity. (e) Testing of pressure switch & pressure guage. (f) Testing of all sluice valve, NRV & Air release valve.
Routine maintenance of fire fighting system, fire alarm system by attending fault testing of system, monthly checking of system etc. including replacement of unserviceable components/parts other than those mentioned in schedule “A” Part-II for fire fighting system, fire alarm system installed at P-105 building (G+12) comprising of the following:- (a) Main fire alarm control panel with each zone battery charger and 230 V power units. (b) Ionization type smoke detector, head detector, response indicator, manual call point and hooters etc. (c) All wiring & cable connections. (d) Lead acid battery 12V/9AH capacity. (e) Testing of pressure switch & pressure guage. (f) Testing of all sluice valve, NRV & Air release valve.
Part-II (Material) Supply and fixing in repair transformer AC/DC for fire alarm system panel of electronic type all as specified and directed.
Supply and fixing in repair battery duly charged 12 V, 7.2 AH all as specified and directed. Make: EXIDE/Amron/Panasonic
Supply and fixing in repair Zone cards all as specified and directed. Make : Ravel/Honeywell/Appolo/Morley
Supply and fixing in repair power cards all as specified and directed. Make : Ravel/Honeywell/Appolo/Morley
Replacement of manual call point suitable for addressable system duly painted in red colour paint with front glass (to be broken in case of fire ) complete with test key to check the response without breaking the glass and die cast aluminum housing with IFD indicator all as specified and directed. Make : Ravel/Honeywell/Appolo/Morley
Supply, commissioning and testing of addressable type manual call points & electronic dual tone hooter operating with PA system of every floor all as specified and directed. Make : Ravel/Honeywell/Appolo/Morley
Supply and fixing in repairs detectors complying with and type certified to EN - 45 addressable type multisensor detector with heat and smoke combination photoelectric/optical with base with self built intelligence as per IS: 11360. Make : Ravel/Honeywell/Appolo/Morley
Supply and fixing in repair hydrant valve wheel all as specified and directed.
Supply and fixing in repair hydrant SS female coupling 63 mm dia all as specified and directed.
Supply and fixing in repair rubber hose drum adopter connection (shank reducer) all as specified and directed.
Supply and fixing in repair brass lock pin (lugs) for 63 mm dia all as specified and directed.
Supply and fixing in repair brass hydrant valve spindle all as specified and directed.
Supply and fixing in repair rubber hose pipe 20mm dia, plain 2 ply rayon braided high pressure. Make : DEEP JYOTI / DUNLOP
Supply and fixing in repair SS nozzle suitable for 20 mm dia rubber hose pipe all as specified and directed.
Supply and fixing in repair 100 mm sluice valve wheel all as specified and directed.
Supply and fixing in repair brass hydrant valve nut as per existing size all as specified and directed.
Supply and fixing blank flange of size 100mm made out of MS 12 mm thick including flange joint all as specified and directed.
Supply and fixing PVC blank cap of hydrants with GI chain all as specified and directed.
S&F factory fabricated MS fire cabinet box as per give design made out flat CRCA of appropriate size and thickness all as directed including two coat of powder coated approved colour synthetic enamel paint over a coat of red oxide primer & fixed on wall with necessary nuts/bolts or welding to existing MS pipe by supporting angle all as specified & directed.
S&F MS plate in short pieces of appropriate size & thickness required as per site requirement to existing fire cabinet box by means of welding including two coats of synthetic enamel paint (approved colour) over a coat or red oxide primer all as specified & directed.
S&F in repairs canvas fire hose 63mm dia bore 15 metre long confirming to IS having male/female SS coupling both end all as specified and directed.
S&F in repair SS Nozzle 25 mm bore suitable for 63mm dia canvas pipe all as specified and directed.
Excavation in trenches n.ex.c 1.5 meter wide and n.exc 1.5 meter in depth for laying of pipe/cable etc and getting out in soft / loose soil all as specified and directed.
Removing excavated materials to a distance not exceeding 50m and depositing where directed at a level n.exc 1.5m above the starting point all as specified and directed.
Returning, filling in including spreading, leveling, watering and well ramming in layers n.exc. 25cms in soil all as specified and directed.
Cutting out concrete blocks, slabs, brickwork or stone masonry (in alternate course) forming toothings for and bonding new work in mortar into old work, including new materials entering old wall all as specified and directed.
S&F fire brigade inlet connection (suction collecting head) made out of 150 mm MS pipe, consisting of four nos 63mm dia brass instantaneous type male coupling with built in check valves complete with all accessories all as specified and directed.
S&F fire hydrant stand post including single outlet fire hydrant of 63 mm dia all as specified and directed.
Taking down existing single acting valve of size 100 x 65mm for servicing including replacement of unserviceable spares i.e. gland, nut, bolt, lock pin, CI hand wheel with chain, etc. and re-fixing in position in high rise bldg not exceeding 15 stories.
S&F automatic air release valve 100 mm dia suitable for domestic water including all connecting materials all as specified and directed
S&F 20 mm dia gun metal globe valve crutch or butterfly handle screwed both ends all as specified and directed.
Supply, Installation, testing & commissioning of double door hose box with painting with necessary fittings as per specification. Details: Fire Hose Cabinets shall be fabricated from 18 gauge MS sheet with locking arrangement of size of hose cabinet shall be 800 X 600 X 250mm, with 4mm thick glass door, the painting of the hose cabinet shall be as described earlier. Each hose cabinet shall accommodete hydrant valve. Two nos of 15 metre long hose pipes & one no. of branch pipe with nozzle. The fire hose cabinet will have the legend "FIRE HOSE" painted prominently in the graphic style including taking down existing box all as specified and directed . Make- EXFLAME/CEASE FIRE/VIJAY ENGG/WINCO
Taking down existing double acting valve of size 100 x 65mm for servicing including replacement of unserviceable spares ie gland, nut, bolt, lock pin, CI hand wheel with chain, etc. and re-fixing in position in high rise bldg not exceeding 15 stories all as specified and directed.
S&F SS double acting fire hydrant valve of size 100 x 65mm conforming to IS – 5290/71 with all fitments such as cap cover instantaneous coupler for making flanged joint 100mm dia bore all as specified and directed.
Repairing to MS front door of size not exceeding 1.5 m x1.5m including welding, locking arrangement including providing pad lock 50mm all as specified and directed. Make : GODREJ/NAVTAL
Preparing old painted surface of CI/MS pipe 100mm dia and applying two coats of synthetic enamel paint (red colour) including a coat or red oxide primer all as specified and directed.
Servicing of hose reel drums by applying greasing, oiling etc and making free rotation to hose drum all as specified and directed.
Removing old paint by paint removers and cleaning with scrappers, any number of coats, steel surfaces of any description over 10cm width or girth and applying two coats of synthetic enameled paint over a coat of red oxide primer on fire fighting cubical box fitted inside bldg on each floor all as specified and directed.
Supply, replacement, installation, testing & commissioning of Micro processor based 2 wire fault tolerant loop, required loop networkable type 5 Loop (each loop accessing maximum 99 detectors and 99 modules) fire alarm/detection control panel. The panel shall be able to give location of all fire/fault conditions of addressable units via the address codes. Further, the panel must be able to automatically switch ON/OFF respective control module whenever any alarm is triggered. The panel shall have rectifier, Loop cards, 80 character L C D unit to indicate fire/fault signal with address and analog output. The panel shall support 24 zones addressable 2 way talk back fire fighter communication, in case of emergency. The panel shall have ability to get integrated with PA system for zone wise annoucements. The panel shall support both loop powered & conventional Notification devices for emergency responses. The panel shall support Auto learn feature. The panel should support networking upto 99 panels with maximum distance of 12 Kilometres between first & last & 1.5 KM between adjacent panels on RS 485. The panel shall support IP connectivity if requred to connect on LAN or WAN network. The panel shall support BMS connectivity through Bacnet/Modbus moduels. The panel Shall be heet Steel Painted, selaed to IP30. The panel shall have 24 Zones with Individual LED indicators, expandable to 80 LED Indicators. The panel shall have 3 Serial ports. The panel shall have a built in power supply and battery charger along with maintenance free 24 AH, 2x12 volt SMF Lead acid batteries capable of running for a minimum of 48 hours with battery charger as required and as per specifications, conforming to BS5839 Standards and duly approved by EN54/ LPCB/ VDS/ UL/BSA all as specified and directed by Engineer-in-Charge, Voice Alarm controller with USB, MP3, AM/FM player ) with 1000 watts power Amplifier. Make :- Ravel/Honeywell/Appolo/Morley
S&F in repairs MS pipes 100mm dia conforming to IS 1239 (Part-I) medium grade with both ends flanged and drilled with standard MS fittings including preparing surfaces and applying two coats of synthetic enamel paint over one coat of red oxide primer in any length and fixed on walls in high rise buildings all as specified and directed Note : MS flanges including welding to MS pipes and all flanged joints shall be measured and paid separately under respective items of this Schedule.
S&F in repairs MS pipes 150mm dia conforming to IS 1239 (Part-I) medium grade with both ends flanged and drilled with standard MS fittings and applying two coats of synthetic enamel paint over one coat of red oxide primer in any length and fixed on walls in high rise buildings all as specified and directed. Note : MS flanges including welding to MS pipes and all flanged joints shall be measured and paid separately under respective item of Sch ‘A’
M&L MS flanges duly drilled including welding to MS pipes, nuts, bolts & washer all as specified and directed.
S&F in repairs SS fire hydrant single acting of size 80x63mm for stand post all as specified and directed.
S&F in repairs sluice valve, 100mm size, both ends flanged with high tensile brass spindle, cast iron body, as per IS-14826 & ISI marked, PN-1.6 pressure rating including all joints with rubber or fibre board, nuts, bolts, washers all as specified and directed.
S&F in repairs sluice valve, 150mm size, both ends flanged with high tensile brass spindle, cast iron body, as per IS-14826 & ISI Marked, PN-1.6 pressure rating including all joints with rubber or fibre board, nuts, bolts, washers all as specified and directed.
S&F in repairs mild steel, conforming to Fe-410-0 or Fe-310-0, as in framed brackets of angles, cut to shape, drilled and counter sunk for screw including bending and welding as necessary guest plate, riveting all as specified and directed.
S&F Non return valve, ball type, conforming to IS, Model B-05, of size 100mm all as specified and directed.
S&F in repairs FOOT valve, 150 mm size PN-1.6 pressure rating including all joints with rubber or fibre board, bolts, nuts washers all as specified and directed.
S&F testing of 1.5 Sqmm x 6 core copper armored cable duly shaddled in walls, cable glands all as specified and directed.
Darpan Construction
Hardik Engineers
ASHOK ENTERPRISES
Shetty Construction Co
GANGAJAL
Bidder Name
Shetty Construction Co
ASHOK ENTERPRISES
Hardik Engineers
Saviour Security Systems
Darpan Construction
GANGAJAL
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .