| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC SHOP NO 6 BENGALI CLUB MIDDLE POINT SRI VIJAYA PURAM 744101 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | ₹1.2 Cr | L1 | Accepted-AOC Acceot |
| 2 | L2₹1.3 Cr+₹7.7 L (6.54%)Rejected-Finance 5037 5038 URBAN ESTATE PH 1 PATIALA 147002 PUNJAB | PATIALA | PATIALA | PUNJAB | 147002 | ₹1.3 Cr+₹7.7 L (6.54%) | L2 | Rejected-Finance Not Being L1 |
| 3 | L3₹1.5 Cr+₹35.8 L (30.4%)Rejected-Finance | ₹1.5 Cr+₹35.8 L (30.4%) | L3 | Rejected-Finance Not Being L1 |
| 4 | L4₹1.7 Cr+₹49.2 L (41.7%)Rejected-Finance 1ST 2ND FLOOR PLOT NO 13 C 13 3 RAMA ROAD SIDE INDUSTRIAL AREA NAJAFGARH ROAD DELHI 110015 INDIA | WEST | DELHI | 110015 | ₹1.7 Cr+₹49.2 L (41.7%) | L4 | Rejected-Finance Not Being L1 |
| Sl No | Description | Qty | Unit | Sant Construction Co. L2 | Vardhman Airport Solutions Private Limited L4 | Bharat Udyog L1 | M/S ISLAND REALCON INDIA PVT. LTD L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supply, install, test and commissioning of 750 KVA/600 KW DG set diesel engine driven Generating set with alternator out put Voltage 415 Volts +/- 1% at set value of 415 V at a frequency 50HZ +/- 0.5%, prime/ continuous duty for unlimited hours of operation with STD control panel indoor type IP-43 consisting of AMF feature to be errected inside sub stn, (NTP for suitable for installing at Minniebay Port Blair, all mounted in acoustic enclosure and Control panel as per manufacturers design and specification confirming to latest norms of CPCB (CPCB-IV+ compliant) and as per E-in-C's Branch policy issued vide letter No A/37696/Gen/Pol/E2W (PPC) dated 29 June 2022 (copy enclosed) complete with the following including dismantling DG set and connected accessories depositing to MES storeyard.
i) DG Fuel tank of minimum capacity 3000 Ltrs with fuel gauge etc complete fixed with suitable foundation frame, grouted on floor with connecting fuel pipelines from main fuel tank to DG fuel tank all as per OEM recommendations ,ii)Battery & Leads iii)Silencer-Hospital grade / heat exchanger type with pipe line & coil cooler / radiator as per OEM design & recommendations complete as per latest CPCB norms iv)AVM Pads as per OEM design v)First Fill of Lube vii)Acoustic Enclosure viii)Standard Control Panel( AMF) indoor type with connected switchgear/relays/meters complete IP-43 to be errected inside sub-stn.
(ix) Suitable size cement concrete foundation platform of canopy base with height as required at site to mount the generator as per manufacturer's instructions/ recommendations. The cost of foundation bed incl earth work and dismantling existing CC and foundation etc is deemed to be included in the quoted rate.
(x) Connecting cables, from existing panels and connecting cables , cables glands, cable lugs to new panel complete with all necessary accessories.
(xi) Install on the foundation, provn & install connecting fuel pipe lines, cables etc.
(xii) Test and commissioning complete including POL and resistive load bank required for testing. | 1 | Each Job | 1,08,00,000 ₹1,08,00,000 | 1,10,00,000 ₹1,10,00,000 | 1,03,42,128 ₹1,03,42,128 Lowest | 1,15,00,000 ₹1,15,00,000 |
| 1.01(xiii) The cost of control cables from engine Control panel to AMF panel, transportation, installation, testing & commissioning etc shall be deemed to be included in the cost quoted.The rate quoted deemed to be inclusive of dismantling DG set & connected accessories and depositing to MES storeyard. (xiv) The details specifications appended below :- (I) ENGINE (a) General: Suitable four stroke compressed ignition, radiator water cooled,Turbocharged aspiration, continuous duty with 10% overload capacity for 1 hour in 12 hours continuous running, with 50°C intake air temperature, latest CPCB Euro emission engine ,turbocharged four stroke engine developing minimum 888 BHP @ 1500 RPM under NTP conditions, coupled to alternator mounted on Channel Iron base frame with external floor mounted fuel tank of minimum 3000 Ltrs capacity with fuel gauge and connected fuel pipeline from main fuel tank to DG fuel tank complete .The prime mover provided should be as per IS specifications. (b) Air intake system : Should comprise of dry type intake air filter mounted on engine, one in number vacuum indicator mounted on intake piping.. (c ) Exhaust System: Should comprise of one exhaust manifold, dry type, mounted on engine, one exhaust hospital type silencer which should be positioned in such a way that the exhaust gas is not sucked by the fan on the radiator/heat exchanger, thereby affecting the cooling system. The silencer should cater to the noise level tolerance prescribed in the relevant IS/BS. The silencer should be provided with flaps with a provision so that it will open only when the generator is running. The complete exhaust system shall be properly supported so that entire lot of the exhaust system shall not fall on the DG Set. | |||||||
| 1.02(d) Fuel System: Should comprise of disposal type element fuel filter, pressure type fuel pump mounted on engine, non return check valve in fuel supply and drain lines, wire braided hose between filter and pump, fuel system with suitable capacity electronic governor and engine mounted actuator. The fuel tank must have proper locking arrangement with level indicator and to be fixed seperately / externally. (e) Cooling System: Should comprise of heat exchanger type with coil cooler and connected pipeline complete, hospital type silencer and tested for 50°C ambient temperature with 7 PSI pressure cap mounted on base rail. The thermostat installed in the engine coolant outlet, fresh water pump mounted on engine, fan and fan hub mounted on engine. A reservoir of 50% of radiator capacity to replenish coolant by gravity (as and when required) is also to be provided.(f) Lubricating System: Should comprise of lubricating oil sump mounted on engine, gear driven lub oil pump mounted on engine, lubricating oil cooler-fresh water cooled integral with engine cool out circuit mounted on engine, oil filter lubricating with cap and lubricating oil dip stick for oil level check mounted on engine. The system should be capable of feeding lube oil to the main end & large end bearings, cam shaft, valve rocker gear and all moving parts. (g) Starting System: Should comprise of suitable voltage DC electrical starter mounted on engine, with suitable maintenance free Lead Acid battery of capacity 12 V DC - 02 Nos with suitable AH to be mounted in trays (having rubber insulation) on the main frame. It should have the provision to charge the battery from external sources during static condition and while running of the generator. (h) AC Generator : The generator shall be horizontal and foot mounted,750 KVA, 415 Volts, 3 phase, 4 wire, 0.8 PF, 50 HZ, self excited, self regulated, brushless AC generator, suitable for voltage regulation + 1% , an ambient temperature of 50° C with IP-23 enclosure class H insulation and temperature rise limited to class H as per following technical details:- (i) Type, Brush less AC Generators with PMG and space heater as per OEM design (ii) Output rating 750 KVA (iii) Output Voltage: 415 ± 1% under all loading conditions and with maximum voltage Dip at full load 0.8 PF shall be < 19% as per OEM design. | |||||||
| 1.03(iv) Output frequency 50Hz ±0.5% up to 0.8 lagging. (v) No of Phases: 3 phase with 01 Neutral (4 wire) (vi) Mounting : Horizontal foot mounted. (vii) Enclosure : Minimum IP-23 / Drip proof and screen protected. (viii) Electronic Automatic voltage regulator with response time < 75 m sec and + range of voltage adjustment. (ix) Class of insulation-'H' (x) Short circuit withstand 3 times rated current for 3 secs and overload withstand capacity for continuous duty with 10% overload capacity for 1 hour in 12 hours continuous running, & 150% overload for 30 sec running (xi) Overspeed capacity 1800 RPM for 2 min. (xii) The maximum unbalanced load across phases shall be less than or equal to 25%. NOTE : Following shall be deemed to be included in cost quoted :-(i) Standard Control panel with AMF feature indoor type with IP-43 for 750 KVA DG set as per OEM design to be errected inside sub-station. (ii) Suitable size cement concrete foundation platform of canopy base with height as required at site to mount the generator as per manufacturer's instructions/ recommendations. The cost of foundation bed incl earth work and dismantling existing CC and foundation etc is deemed to be included in the quoted rate. (iii) Connecting cables, from existing panels and connecting cables , cables glands, cable lugs to new panel complete with all necessary accessories. (iv) Install on the foundation, connecting fuel lines, cable etc. (v) Test and commissioning complete. (vi) The cost of control cables from engine Control panel to AMF panel, transportation, installation, testing & commissioning etc shall be deemed to be included in the cost quoted. | |||||||
| 1.04(j) BASE FRAME: Shall be stand by and fabricated with material as per OEM recommendation which shall be suitable to mount the engine, alternator and other connected accessories, channel width of base frame shall be adequate to accommodate anti-vibration pads.(k) ENGINE CONTROL PANEL: Control panel shall be powder coated , weather proof type with PCC3.3 controller or suitable equivalent controller as per OEM design, mounted inside the acoustic,consist of the following. 1.suitable rated switchgear as per OEM design 2. Engine control unit (ECU),3. Current Trasformer set, 4. Indicating Lamps, 5. Set running & load on set Shall be indoor type manufactured with 14/16 guage CRCA sheet and is powder coated for weather-proff and long lasting finish consisting of alarm,indication and safety ( Over speed,High coolant temperature,low oil pressure,water in fuel,engine common fault low fuel level,low coolant level,emergency stop on enclosure, under frequency,over frequency,under voltage over voltage,over current,over load kw, battery under voltage), microprocessor power command controller, Aluminium busbars with suitable capacity with incoming/outgoing terminals, indicating lamps for 'Load ON' and 'Set Running', instrument fuses duly wired and ferruled , Volt meter, ammeter with selector switches, Frequency meter, energy meter, CTs and 3 Phase indicating lamps, timers etc all as per latest engineering practices.etc. complete all as specified and directed. (l) Standard Control panel with AMF feature indoor type with IP-43 for 750 KVA DG set as per OEM design to be errected inside sub-station, Standard Control panel with auto mains failure (AMF) feature complete , floor mounted type, vertical, factory made indoor type fabricated out of 2.0mm thick CRCA sheet with angle iron base frame made of 50 x 50 x 6mm base of Panel board floor mounted, dust and vermine proof, suitable for voltage 415 V Three Phase 4 wire, 50 HZ AC supply, weather proof, with IP-43 protection, with separate hinge door for each compartment & locking arrangement, with back door openable (Screwed), legs grouted in PCC complete including painting with two coats of epoxy powder paint over a coat of primer after under going a rigorous metal treatment process involving alkaline degreasing, descaling in dilute sulphuric acid or any other acid and phosphate and with aluminium busbar (TPN) of suitable rating, suitable double compression copper cable glands and including provn of the following :- | |||||||
| 1.05(i) Protection relays as per OEM design/approved make. (ii) Minimum 1250 A , 3P 50 KA EDO type ACBs of qty/capacity as per OEM design. (iii) Suitable rated 3 Pole Power Contactor of minimum 225 Amp rated for 750 KVA DG neutral. (iv) Suitable rated resin cast CTs. (v) Suitable rated inbuilt AVR. (vi) SMPS based automatic battery charger, 24V, 20A with DCV, DCA -02 Nos. (vii) Digital Multifunction meters suitable for RS 485 communication with LAN port hub. Make: Schneider/L&T/ABB/Legrand. (xi) Suitable capacity copper control cables, necessary indications, hooters, auxilliary contactors, TNC & LVM interlocking etc. (viii) Provn of scope for future expansion for additioning of 1 No DG set from side end extension. (b) BACK-UP PROTECTION :- HRC Fuse for short circuit protection. (c) MICRO PROCESSOR BASED AMF MODULE :- (i) Functions:- (aa) Supply failure timer (ab) Restoration timer (ac) 3 in pulse automatic engine start/stop logic & engine fails to start lockout (ad) Generator voltage ,current & frequency monitoring (ae) Battery Voltage sensing & monitoring (ii) Selector switches & Push buttons (aa) Manual/auto/test selector switch (ab) Engine START/STOP (iii) Metering : Remote monitoring system with GPRS/GSM modem with SIM card and 2 year data charges complete for monitoring all DG set parameters such as Hrs run, fuel level, Engine oil pressure, temperature, speed, Voltage/current/KW, battery monitoring , PF, frequency etc complete as per OEM design. (iv) Annuciation (LED Type): (Faults) (aa) Engine fails to start (ab) Low lub oil pressure (ac) High water temperature (ad) Generator over load (ae) Battery Voltage (af) Low fuel level (v) Additional features:- (aa) Continuous reading digital voltmer/Ammeter/freqauency meter (ab) Multifunction meters (ac) Electronic (with counter display)KWH Meter. | |||||||
| 1.06(vi) Relay consisting of following features. (aa) 3 Phase mains supply voltage sensing (ab) Earth fault (ac) Earth leakage (ad) LED Indications (ae) Engine ON, Load on DG (af) Mains On, Load on Mains (ag) overload (vii) Push buttons (AMF Module by pass mode):- (aa) Engine START/STOP (ab) Geneator contactor CLOSE/TRIP (ac)Mains contractor CLOSE/TRIP (ad) Fault ACCEPT/RESET (viii) Engine Meters:- (aa) Lub oil pressure (ab) Water Temparature (ix) Battery Charger:- SMPS Based automatic float cum boost battery charger with following :- (aa) DC Voltmeter & Ammeter (ab) Selector switch for auto/manual & float/Boost. (x) Bypass switch of suitable rating (m) Accessories :- (i) 01 No standard mechanical and electrical tool box. (ii) Internal covered tube lights. (n) Acoustic Enclosure :- Specially designed to meet CPCB norms 75dBA @ 1 mtr at 75% load under free field conditions. The Acoustic enclosure is made of CRCA sheets and a structural/sheet metal base with high quality noise absorbent, 11 tank pretreatment process and UV resistant powder coating of all parts to withstand extreme environment and fire-retardant grade acoustic insulation material (P.U.Foam) complying to IS 8183 with two point lifting handles. (a) Internal Lighting: Tube lights with protective mesh around it to be fitted inside the container for proper illumination (b) Doors : The enclosure will be provided with suitable doors on the side and rear to enter the enclosure during operation and maintenance. All doors will be provided with lock and handles for opening/ closing the doors, retainers for holding the panel door. (p) Painting Scheme ISS shade 220 olive green 1994 or all as per manufacturers specifications. (q) Lifting/ Transportation arrangements :- Container with suitable corners will be provided to lift the DG set along with container. This is suitable for road/ rail/ sea transportation. | |||||||
| 1.07(r) Trials:-Trials on site should be given as per load tests prescribed and all functional trials should be shown. Note : (i) The Engine, alternator, Control Panel, Acoustic enclosure shall be integrated unit sourced and AMF panel,to be installed inside sub-stn shall be from OEM only as per Make given in Sch 'A' (ii) Testing of DG set shall carried by representative nominated by HQ CE (A&N) Zone through Accepting Officer. The cost of POL & resistive load bank required for testing the DG Set is deemed to be included in quoted rates. The DG Set shall run for a period of 12 Hours continuosly out of which 15 minutes on No Load , 2 Hrs 15 minutes of 25% rated load, 2 hrs on 50% rated load , 2 Hrs 30 minutes on 75 % rated load, 4 Hrs on rated full load, 1 Hrs on 110% rated full load.(iii) First filling of coolant, Engine Oil, lubricants and fuel etc should be arranged by contractor for complete testing and quoted rate deemed to be inclusive for the same.(iv) The Contractor shall submit technical specifications and General Arrangement drawings of OEM for approval before placing order. (v)The Contractor shall make all necessary arrangements for pre-despatch inspection at manufacturer site or digital e-testing as directed by Accepting Officer to be arranged and for pre-commissioning test by rep nominated by HQ CE (A&N) Zone after installation of DG set & Panel. The cost for the same is deemed to be included in quoted rate. (vi) The quoted rate inclusive earth work for foundation, Cement concrete foundation as per OEM design, necessary T&P for transportation and installation complete.(vii) The quoted rate inclusive of supply of next nearest higher capacity as per OEM design without any extra cost.(viii) The quoted rate inclusive of earth work for foundation, Cement concrete foundation as per OEM design, dismanlting of brickwall/pcc/tiles and making good the disturbed surfaces including repairs/replacement brickwall/tiles/pcc & provision of steel wire mesh/GI duct for providing proper exhaust/breathing system to DG set, necessary T&P for transportation and installation complete.Any damages to fuel line system including diversion of fuel line system from Main fuel tank/fuel pumping system to all existing and proposed DG fuel tanks as required at site shall be deemed to included in quoted rate.The contractor shall visit site before quoting the tender for ascertaining the complete work required. Any excess earth strip from earth test point to DG set shall be provided at no extra cost and quoted rate deemed to be inclusive for the same. | |||||||
| 2.00 | Taking down old unserviceable LT XLPE/PVC insulated 3.5/4 core cable of size 300 to 500 Sqmm including DWC pipe/ cable cover complete all as specified and directed by Engineer-in-Charge. | 100 | Rm | 100 ₹10,000 | 100 ₹10,000 | 193 ₹19,300 | 85 ₹8,500 Lowest |
| 3.00 | Supply , lay, connect, test and commission cable LT 1100 volts heavy duty XLPE insulated armoured aluminium conductors, in trenches/ducts on angle iron supports including glanding, crimping and connecting up of size 3.5 Core x 400 sqmmcomplete all as specified and directed by Engineer-in-Charge.
Note: Cable to be laid in existing cable ducts with proper angle iron supports/clamps wherever required with LT end kit heat shrinkable joints complete. | 50 | Rm | 2,300 ₹1,15,000 | 5,000 ₹2,50,000 | 1,950 ₹97,500 Lowest | 2,127 ₹1,06,350 |
Tender Value
₹1.2 Cr
EMD Value
₹2.0 L
Closing Date
2 Jul 2024, 6:00 pmClosed
GE Minniebay Port Blair
GE Minniebay Port Blair, PO, Junglighat PIN-744103
SPL REPAIRSREPLACEMENT OF DG SET NO I OF CAPACITY 750KVA AND CONNECTED WORKS AGAINST BER AT MAIN POWER HOUSE UNDER AGE EM I AT GE MINNIE BAY PORT BLAIR
2024_MES_656167_1
8410/E8
Open Tender
Civil Works
Item Rate
180 days
GE Minniebay Port Blair
As per tender Documents
11 documents required · 11 mandatory
₹1,000
Yes
GE Minniebay
₹2.0 L
Yes
27 Aug 2025
27 May 2024
5 Jul 2024
28 May 2024
2 Jul 2024
18 Jun 2024
Amount
Supply, install, test and commissioning of 750 KVA/600 KW DG set diesel engine driven Generating set with alternator out put Voltage 415 Volts +/- 1% at set value of 415 V at a frequency 50HZ +/- 0.5%, prime/ continuous duty for unlimited hours of operation with STD control panel indoor type IP-43 consisting of AMF feature to be errected inside sub stn, (NTP for suitable for installing at Minniebay Port Blair, all mounted in acoustic enclosure and Control panel as per manufacturers design and specification confirming to latest norms of CPCB (CPCB-IV+ compliant) and as per E-in-C's Branch policy issued vide letter No A/37696/Gen/Pol/E2W (PPC) dated 29 June 2022 (copy enclosed) complete with the following including dismantling DG set and connected accessories depositing to MES storeyard. i) DG Fuel tank of minimum capacity 3000 Ltrs with fuel gauge etc complete fixed with suitable foundation frame, grouted on floor with connecting fuel pipelines from main fuel tank to DG fuel tank all as per OEM recommendations ,ii)Battery & Leads iii)Silencer-Hospital grade / heat exchanger type with pipe line & coil cooler / radiator as per OEM design & recommendations complete as per latest CPCB norms iv)AVM Pads as per OEM design v)First Fill of Lube vii)Acoustic Enclosure viii)Standard Control Panel( AMF) indoor type with connected switchgear/relays/meters complete IP-43 to be errected inside sub-stn. (ix) Suitable size cement concrete foundation platform of canopy base with height as required at site to mount the generator as per manufacturer's instructions/ recommendations. The cost of foundation bed incl earth work and dismantling existing CC and foundation etc is deemed to be included in the quoted rate. (x) Connecting cables, from existing panels and connecting cables , cables glands, cable lugs to new panel complete with all necessary accessories. (xi) Install on the foundation, provn & install connecting fuel pipe lines, cables etc. (xii) Test and commissioning complete including POL and resistive load bank required for testing.
(xiii) The cost of control cables from engine Control panel to AMF panel, transportation, installation, testing & commissioning etc shall be deemed to be included in the cost quoted.The rate quoted deemed to be inclusive of dismantling DG set & connected accessories and depositing to MES storeyard. (xiv) The details specifications appended below :- (I) ENGINE (a) General: Suitable four stroke compressed ignition, radiator water cooled,Turbocharged aspiration, continuous duty with 10% overload capacity for 1 hour in 12 hours continuous running, with 50°C intake air temperature, latest CPCB Euro emission engine ,turbocharged four stroke engine developing minimum 888 BHP @ 1500 RPM under NTP conditions, coupled to alternator mounted on Channel Iron base frame with external floor mounted fuel tank of minimum 3000 Ltrs capacity with fuel gauge and connected fuel pipeline from main fuel tank to DG fuel tank complete .The prime mover provided should be as per IS specifications. (b) Air intake system : Should comprise of dry type intake air filter mounted on engine, one in number vacuum indicator mounted on intake piping.. (c ) Exhaust System: Should comprise of one exhaust manifold, dry type, mounted on engine, one exhaust hospital type silencer which should be positioned in such a way that the exhaust gas is not sucked by the fan on the radiator/heat exchanger, thereby affecting the cooling system. The silencer should cater to the noise level tolerance prescribed in the relevant IS/BS. The silencer should be provided with flaps with a provision so that it will open only when the generator is running. The complete exhaust system shall be properly supported so that entire lot of the exhaust system shall not fall on the DG Set.
(d) Fuel System: Should comprise of disposal type element fuel filter, pressure type fuel pump mounted on engine, non return check valve in fuel supply and drain lines, wire braided hose between filter and pump, fuel system with suitable capacity electronic governor and engine mounted actuator. The fuel tank must have proper locking arrangement with level indicator and to be fixed seperately / externally. (e) Cooling System: Should comprise of heat exchanger type with coil cooler and connected pipeline complete, hospital type silencer and tested for 50°C ambient temperature with 7 PSI pressure cap mounted on base rail. The thermostat installed in the engine coolant outlet, fresh water pump mounted on engine, fan and fan hub mounted on engine. A reservoir of 50% of radiator capacity to replenish coolant by gravity (as and when required) is also to be provided.(f) Lubricating System: Should comprise of lubricating oil sump mounted on engine, gear driven lub oil pump mounted on engine, lubricating oil cooler-fresh water cooled integral with engine cool out circuit mounted on engine, oil filter lubricating with cap and lubricating oil dip stick for oil level check mounted on engine. The system should be capable of feeding lube oil to the main end & large end bearings, cam shaft, valve rocker gear and all moving parts. (g) Starting System: Should comprise of suitable voltage DC electrical starter mounted on engine, with suitable maintenance free Lead Acid battery of capacity 12 V DC - 02 Nos with suitable AH to be mounted in trays (having rubber insulation) on the main frame. It should have the provision to charge the battery from external sources during static condition and while running of the generator. (h) AC Generator : The generator shall be horizontal and foot mounted,750 KVA, 415 Volts, 3 phase, 4 wire, 0.8 PF, 50 HZ, self excited, self regulated, brushless AC generator, suitable for voltage regulation + 1% , an ambient temperature of 50° C with IP-23 enclosure class H insulation and temperature rise limited to class H as per following technical details:- (i) Type, Brush less AC Generators with PMG and space heater as per OEM design (ii) Output rating 750 KVA (iii) Output Voltage: 415 ± 1% under all loading conditions and with maximum voltage Dip at full load 0.8 PF shall be < 19% as per OEM design.
(iv) Output frequency 50Hz ±0.5% up to 0.8 lagging. (v) No of Phases: 3 phase with 01 Neutral (4 wire) (vi) Mounting : Horizontal foot mounted. (vii) Enclosure : Minimum IP-23 / Drip proof and screen protected. (viii) Electronic Automatic voltage regulator with response time < 75 m sec and + range of voltage adjustment. (ix) Class of insulation-'H' (x) Short circuit withstand 3 times rated current for 3 secs and overload withstand capacity for continuous duty with 10% overload capacity for 1 hour in 12 hours continuous running, & 150% overload for 30 sec running (xi) Overspeed capacity 1800 RPM for 2 min. (xii) The maximum unbalanced load across phases shall be less than or equal to 25%. NOTE : Following shall be deemed to be included in cost quoted :-(i) Standard Control panel with AMF feature indoor type with IP-43 for 750 KVA DG set as per OEM design to be errected inside sub-station. (ii) Suitable size cement concrete foundation platform of canopy base with height as required at site to mount the generator as per manufacturer's instructions/ recommendations. The cost of foundation bed incl earth work and dismantling existing CC and foundation etc is deemed to be included in the quoted rate. (iii) Connecting cables, from existing panels and connecting cables , cables glands, cable lugs to new panel complete with all necessary accessories. (iv) Install on the foundation, connecting fuel lines, cable etc. (v) Test and commissioning complete. (vi) The cost of control cables from engine Control panel to AMF panel, transportation, installation, testing & commissioning etc shall be deemed to be included in the cost quoted.
(r) Trials:-Trials on site should be given as per load tests prescribed and all functional trials should be shown. Note : (i) The Engine, alternator, Control Panel, Acoustic enclosure shall be integrated unit sourced and AMF panel,to be installed inside sub-stn shall be from OEM only as per Make given in Sch 'A' (ii) Testing of DG set shall carried by representative nominated by HQ CE (A&N) Zone through Accepting Officer. The cost of POL & resistive load bank required for testing the DG Set is deemed to be included in quoted rates. The DG Set shall run for a period of 12 Hours continuosly out of which 15 minutes on No Load , 2 Hrs 15 minutes of 25% rated load, 2 hrs on 50% rated load , 2 Hrs 30 minutes on 75 % rated load, 4 Hrs on rated full load, 1 Hrs on 110% rated full load.(iii) First filling of coolant, Engine Oil, lubricants and fuel etc should be arranged by contractor for complete testing and quoted rate deemed to be inclusive for the same.(iv) The Contractor shall submit technical specifications and General Arrangement drawings of OEM for approval before placing order. (v)The Contractor shall make all necessary arrangements for pre-despatch inspection at manufacturer site or digital e-testing as directed by Accepting Officer to be arranged and for pre-commissioning test by rep nominated by HQ CE (A&N) Zone after installation of DG set & Panel. The cost for the same is deemed to be included in quoted rate. (vi) The quoted rate inclusive earth work for foundation, Cement concrete foundation as per OEM design, necessary T&P for transportation and installation complete.(vii) The quoted rate inclusive of supply of next nearest higher capacity as per OEM design without any extra cost.(viii) The quoted rate inclusive of earth work for foundation, Cement concrete foundation as per OEM design, dismanlting of brickwall/pcc/tiles and making good the disturbed surfaces including repairs/replacement brickwall/tiles/pcc & provision of steel wire mesh/GI duct for providing proper exhaust/breathing system to DG set, necessary T&P for transportation and installation complete.Any damages to fuel line system including diversion of fuel line system from Main fuel tank/fuel pumping system to all existing and proposed DG fuel tanks as required at site shall be deemed to included in quoted rate.The contractor shall visit site before quoting the tender for ascertaining the complete work required. Any excess earth strip from earth test point to DG set shall be provided at no extra cost and quoted rate deemed to be inclusive for the same.
Taking down old unserviceable LT XLPE/PVC insulated 3.5/4 core cable of size 300 to 500 Sqmm including DWC pipe/ cable cover complete all as specified and directed by Engineer-in-Charge.
Supply , lay, connect, test and commission cable LT 1100 volts heavy duty XLPE insulated armoured aluminium conductors, in trenches/ducts on angle iron supports including glanding, crimping and connecting up of size 3.5 Core x 400 sqmmcomplete all as specified and directed by Engineer-in-Charge. Note: Cable to be laid in existing cable ducts with proper angle iron supports/clamps wherever required with LT end kit heat shrinkable joints complete.
Material and labour earthing with steel earth plate electrode of size 600x600x6mm thick buried directly in ground to a depth not less than 2.25 mtr deep below normal ground level with top edge of the earth plate not less than 1.5 mtr deep below normal ground level connected to galvanized iron strip of size 32x6mm as earthing lead by means of nuts, bolts and washers of steel after welding of GI strip to earth electrode to the full length of earth plate, GI medium grade pipe 20 mm bore protection pipe upto test point, 40mm dia GI light grade watering pipe with funnel and wire mesh, RCC pit cover of size 300x300x40mm reinforced with XPM having weight not less than 4Kg/sqmm including 6mm thick MS bar handle made to shape, PCC pit with 1:3:6 type C1 with angle iron frame made of angle iron of size 40x40x4mm, adequate qty of charcoal dust and salt layers all around the earth plate, excavation , earth work in any type of soil, removal of excavated soil and returning filling in all as required at site complete all as specified in electrical plate No 3 of SSR Part-I and all as specified or indicated including testing on completion. NOTE :-Rates inclusive of necessary excavation in any type of soil, earth work, PCC pit, RCC cover, funnel with watering pipe, GI earth strip upto 7.5 m long for connecting to test point etc. all as required at site for complete earthing and dismantling old defective earthpit.
Material and labour earthing with copper plate 60×60cm ×3.15mm thick electrode and 20×3mm copper strip as earthing lead, buried directly in ground to a depth not less than 2.25m deep below normal ground level with top edge of the earth plate not less than 1.5m deep below normal ground level connected to20×3mm copper strip as earthing lead by means of nuts, bolts and washers of steel after welding of GI strip to earth electrode to the full length of earth plate, GI medium grade pipe 40 mm bore protection pipe upto test point, 20mm dia GI light grade watering pipe with funnel and wire mesh, RCC pit cover of size 300x300x40mm reinforced with XPM having weight not less than 4Kg/sqmm including 6mm thick MS bar handle made to shape, PCC pit with 1:3:6 type C1 with angle iron frame made of angle iron of size 40x40x4mm, adequate qty of charcoal dust and salt layers all around the earth plate, excavation , earth work in any type of soil, removal of excavated soil and returning filling in all as required at site complete all as specified in plate No 3 of SSR Part-I and all as specified or indicated including testing on completion. Note :-Rates inclusive of necessary excavation in any type of soil, earth work, PCC pit, RCC cover, funnel with watering pipe,Copper earth strip upto 7.5 m long for connecting to test point etc. all as required at site for complete earthing and dismantling old defective earthpit.(for DG neutral)
Supply, install, testing and commissioning of Sandwich type (Copper + tin plated throughout length), aluminium busway (3L+N+PE), with multi layer polyester film class-F insulation, 100% N, minimum 80kA for 1 sec and 12KV impulse withstand, enclosure as Integral Earth in GI, with IP-55, bus duct shall be made out of min 1.5 mm thick galvanised sheet steel enclosure (C-Ribbed housing in min 1.5 mm thick) with IP-55 and powder coated painted with RAL 7035 or as per OEM design , minimum Temp rise: 55 deg. over ambient of 40 deg, rated insulation & operating voltage1000V of minimum rating 1600 Amps with IP 55 protection straight run with or without outlets complete all as specified and directed by Engineer-in-Charge. Note : The rate inclusive of Edgewise Hanger (suspension brackets) and angle iron supports wherever required as per OEM design for supporting busduct. Contractor shall submit GA drawing/specification for approval of GE before placing order.
Supply only the 90 Degree ( Elbow) special for Srl item no 5 here-in-before complete all as specified and directed by Engineer-in-Charge.
Supply only the Flange End special for Srl item no 5 here-in-before complete all as specified and directed by Engineer-in-Charge.
Supply only the Copper flexible (Braided) special for Srl item no 5 here-in-before complete all as specified and directed by Engineer-in-Charge.
Supply only the Adapter Boxes/Bellows for DG/transformer/LT panel for Srl item no 5 here-in-before complete all as specified and directed by Engineer-in-Charge.
Supply & fix copper strip 20mm x 3 mm buried in ground / fixed inside duct including dismantling unserviceable strip complete all as specified and directed by Engineer-in-Charge.
M&L as in repair for rolled mild steel work as in bands, straps, supports or stays including bolts, if required, hooks (stay) complete of grade FE-290, E-165 complete all as specified and directed by Engineer-in-Charge.
Supply , assembly and erection of GI sheet with TDF flange rectangular/square duct made out of 'L' shaped hollow profile, duly factory boxed, incl all accessories such as Corner, Cleat, Carriage bolt, Gasket and appropriate sealant on longitudinal joints etc complete of size 24 Gauge of any heights including cutting & opening of brick wall and making good the distrubed surfaces including dismantling of old unserviceable GI sheet complete all as specified and directed by Engineer-in-Charge. Note : The Specials and angle iron supports required will be measured and paid separately under relevant Sch items
Sant Construction Co. (BID ID -3039844)
M/S ISLAND REALCON INDIA PVT. LTD (BID ID -3039415)
Vardhman Airport Solutions Private Limited (BID ID -3039337)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .