EXECUTIVE ENGINEER
Executive Engineer Construction Division PWD B and R Rupnagar
Construction of Residential Hostel Male Capacity 50 New Hostel and Furnishing in DIET Building at Ropar Civil work Electrical Work Public Health Work
2026_CEPW_177381_1
Tender Notice No. 19 Dated 12.10.2026
Open Tender
Civil Works - Buildings
Percentage
180 days
Rupnagar
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
₹2.5 L
Yes
13 Oct 2026
13 Oct 2026
27 Oct 2026
13 Oct 2026
27 Oct 2026
13 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS
Clearing grass and removal of rubbish up to a distance of 50 meters outside the periphery of the area as per technical clause 201 of MORT&H specifications | 0.06 | Per Hec | 25,922.42 | ₹1,555.35 |
| 2 | Excavation in soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40%^ excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 meters. | 449.93 | Per Cum | 102.19 | ₹45,978.35 |
| 3 | Cement concrete 1:4:8 with stone ballast 20mm gauge with stone ballast 20mm gauge | 58.45 | Per Cum | 4,185.41 | ₹2,44,637.21 |
| 4 | Damp proof course 4cm thick of cement concrete 1:2:4 with 2 coats of bitumen 20/30 penetration at 1.65 Kg per sqm laid hot and sanded | 31.01 | Per Sqm | 360.42 | ₹11,176.62 |
| 5 | First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | 47.26 | Per Cum | 7,080.41 | ₹3,34,620.18 |
| 6 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 80.89 | Per Cum | 5,974.35 | ₹4,83,265.17 |
| 7 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 121.34 | Per Sqm | 221.24 | ₹26,845.26 |
| 8 | Providing and laying in super structure for first storey factory made with vibro-hydraulic compaction machine precast Hollow block of cement concrete setting in position with cement mortar 1:3 (1 cement:3 course sand ) including cost of hosting, centering and shuttering complete as per IS:2185 (Part-1): 2005. | 69.38 | Per Cum | 7,884.39 | ₹5,47,018.98 |
| 9 | 115 mm thick brick wall with every fourthcourse reinforced with hoop iron laid in 1:4 cement mortar in superstructure | 58.52 | Per Sqm | 947.88 | ₹55,469.94 |
| 10 | Base course of floor consisting of 100mm thick cement concrete 1:8:16 with stone aggregate 40 mm gauge and 100mm sand filling using mechanical mixer for mixing of material | 448.85 | Per Sqm | 463.39 | ₹2,07,992.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
DNITofDietBoysHostel.pdf
Tender Documents • 7.80 MB
BOQ_361752.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .