| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.7 CrAccepted-AOC CTS NO 495 A 45 PLOT NO 46 SHIVSAMPADA MUTHA COLONY SADAR BAZAR SATARA | SATARA | SATARA | MAHARASHTRA | 415001 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹65.6 Cr+₹7.9 Cr (13.7%)Rejected-Finance B 1 VASANTVIHAR BIBWEWADI KONDHAWA RD MARKETYARD PUNE 411 037 | PUNE | PUNE | MAHARASHTRA | 411037 | L2 | Rejected-Finance Not Qualfied | |
| 3 | Rejected-Technical SHANTI JEEVAN P W D 23 10 PIMPRI PUNE 411017 | PUNE | MAHARASHTRA | 411017 | - | Rejected-Technical As per tender condition no.4.4 (5) and (6) machinery documents not uploaded/submitted hence, disqualified. | |
| 4 | Rejected-Technical G 8 PANDURANG BHAVAN BORADE PETROL PUMP CHOWK MALKAPUR KARAD SATARA DISTRICT | PUNE | MAHARASHTRA | 412206 | - | Rejected-Technical As per tender condition no.4.4 (5) and (6) the contractor informed that the letter dt-25/03/2023 he is not ready to move the machinery to the work site hence, disqualified. | |
| 5 | Rejected-Technical 193 4 B APPA APARTMENT OLD PETH TALEGAON DABHADE TAL MAVAL DIST PUNE | PUNE | MAHARASHTRA | 412106 | - | Rejected-Technical As per tender condition no.4.4 (5) and (6) the contractor informed that the letter dt-25/03/2023 he is not ready to move the machinery to the work site hence, disqualified. |
| Sl No | Description | Qty | Unit | T AND T INFRA LIMITED L2 | A S DESAI INFRASTRUCTURE PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. By Mechanical Means. | 32,746.85 | One Cubic Metre | 151.55 ₹49,62,785.12 | 133.25 ₹43,63,517.76 Lowest |
| 2.00 | Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 21,831.23 | One Cubic Metre | 177.05 ₹38,65,219.27 | 155.65 ₹33,98,030.95 Lowest |
| 3.00 | Excavation for roadway in soft rock, including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading or stacking as directed. | 21,831.23 | One Cubic Metre | 225.45 ₹49,21,850.8 | 198.25 ₹43,28,041.35 Lowest |
| 4.00 | Excavation for roadway in hard rock by controlled blasting including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 5,457.81 | One Cubic Metre | 318.45 ₹17,38,039.59 | 280 ₹15,28,186.8 Lowest |
| 5.00 | Excavation for roadway in hard rock by wedging and chiselling or line drilling including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 27,289.04 | One Cubic Metre | 1,807.35 ₹4,93,20,846.44 | 1,589.2 ₹4,33,67,742.37 Lowest |
| 6.00 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing off unsuitable or excess stuff as directed all sorts of soils. | 5,100 | One Cubic Metre | 151.55 ₹7,72,905 | 133.25 ₹6,79,575 Lowest |
| 7.00 | Excavation for catch / side water gutter in hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 3,400 | One Cubic Metre | 177.05 ₹6,01,970 | 155.65 ₹5,29,210 Lowest |
| 8.00 | Excavation for catch / side water gutter in soft rock strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 3,400 | One Cubic Metre | 264.95 ₹9,00,830 | 233 ₹7,92,200 Lowest |
| 9.00 | Excavation for catch / side water gutter in hard rock strata to the specified section including stacking the excavated stuff in a regular bund by chieselling and wedging and disposing off unsuitable or excess stuff as directed. | 6,531.97 | One Cubic Metre | 1,807.35 ₹1,18,05,555.98 | 1,589.2 ₹1,03,80,606.72 Lowest |
| 10.00 | Watering and compacting of embankment formed of materials obtained from the road cutting, within a lead of 50 metre to not less than 97 percent of Standard Proctor density after laying them in layers of 20 centimetre to 30 centimetre. With power roller | 11,864.06 | One Cubic Metre | 100.65 ₹11,94,117.64 | 88.5 ₹10,49,969.31 Lowest |
Tender Value
₹57.2 Cr
EMD Value
₹28.6 L
Closing Date
28 Feb 2023, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, P.W. (West) Division,Satara.
Executive Engineer, P.W. (West) Division,Satara, Bandhkam Bhavan, Sadar Bazar, Satara, 415001
Widening and Improvement To Satara Kas Bamnoli Tapola Mahabaleshwar Road MDR-26 Km.69/000 To 94/000 (Part-Vengale To Chikhali Fata) Tal.Mahabaleshwar.Dist.Satara.
2023_PWDRP_868568_1
SHORT PERIOD E-TENDER NOTICE NO.129 /2022-23 (B-2)
Open Tender
Civil Works - Roads
Item Rate
365 days
Tal.Mahabaleshwar.Dist.Satara.
As Per B-2 STANDARD BIDDING DOCUMENT Tender Form
5 documents required · 5 mandatory
₹3,540
₹28.6 L
office of the Chief Engineer, P.W.Region, Pune
21 Aug 2023
1 Feb 2023
3 Mar 2023
1 Feb 2023
28 Feb 2023
1 Feb 2023
7 Feb 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. By Mechanical Means. | 32,746.85 | One Cubic Metre | - | - |
| 2 | Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 21,831.23 | One Cubic Metre | - | - |
| 3 | Excavation for roadway in soft rock, including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading or stacking as directed. | 21,831.23 | One Cubic Metre | - | - |
| 4 | Excavation for roadway in hard rock by controlled blasting including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 5,457.81 | One Cubic Metre | - | - |
| 5 | Excavation for roadway in hard rock by wedging and chiselling or line drilling including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. | 27,289.04 | One Cubic Metre | - | - |
| 6 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing off unsuitable or excess stuff as directed all sorts of soils. | 5,100 | One Cubic Metre | - | - |
| 7 | Excavation for catch / side water gutter in hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 3,400 | One Cubic Metre | - | - |
| 8 | Excavation for catch / side water gutter in soft rock strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 3,400 | One Cubic Metre | - | - |
| 9 | Excavation for catch / side water gutter in hard rock strata to the specified section including stacking the excavated stuff in a regular bund by chieselling and wedging and disposing off unsuitable or excess stuff as directed. | 6,531.97 | One Cubic Metre | - | - |
| 10 | Watering and compacting of embankment formed of materials obtained from the road cutting, within a lead of 50 metre to not less than 97 percent of Standard Proctor density after laying them in layers of 20 centimetre to 30 centimetre. With power roller | 11,864.06 | One Cubic Metre | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_1512603.xls
BOQ Document • 0.35 MB
113806417.pdf
Tender Document • 0.13 MB
129_1_B_2_Vengale_to_Chikhali_Phata_Mwar_01_02_23.pdf
Tender Document • 4.95 MB
113806419.html
Tender Document • 0.03 MB
114806969.pdf
Tender Document • 0.30 MB
114806970.html
Tender Document • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .