Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
2 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
TENDER SEC
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
(a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work costing not less than the amount equal to 60% of advertised value of the tender
Defination of Similar Work :- For the purpose of this work, Single Similar work shall be taken as "Any signal interlocking works involving EI or RRI or PI or IBS or IBH or LC gate or yard modification or UFSBI or Track circuit (AFTC or DC TC) or Axle Counter (SSDAC or MSDAC or HA-SSDAC) or Automatic signalling."
16 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Refer Tender conditions in the uploaded tender document. In case of any discrepancies GCC April 2022 & correction slips upto date will prevail.
Provision of power supply redundancy and 70 block sections HASSDAC RDSO TAN Compliance [SSE/S/TEN, SSE/S/TSI & SSE/S/VPT - 26 sections]
U-SG-8-2026-27-2~SR
U-SG-8-2026-27-2
Open
Works - General
6 Months
Madurai, Tamil Nadu
₹0
₹2.2 L
10 Oct 2026
10 Oct 2026
19 Oct 2026
34 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 94,49,656.29 | ||
| — | 39328.00 | — | — | ||
| Excavation of cable trench in all kinds of soil except hard rocky areas including clearing of roots of trees, rocks, bushes etc. to a depth of 1.0 Mtrs and to a width of 0.3 Mtrs. Laying of cables is not included in this schedule. | — | — | — | 19,07,801.28 | |
| — | 119.00 | — | — | ||
| Removing/breaking of existing RCC slabs on the Passenger Platform, trenching to a depth of 0.6m to accommodate the additional cables, replacing the slabs removed after the cables are laid and replastering with cement mortar, refilling the trench by ramming and consolidating it as per the instructions of Railway Representatives at site. Laying of cables is not included in this schedule. [Cement, river sand and all other miscellaneous materials required for the work shall be supplied by the Contractor]. | — | — | — | 28,313.67 | |
| — | 264.00 | — | — | ||
| Excavation of trench along route of existing cable duct, opening the slabs to accommodate additional cable laying, REPOSITIONING the slabs removed after the cables are laid and PLASTERING with cement mortar, and refilling the trench by ramming and consolidating it as per the instructions of Railway Representatives at site. (Laying of cables is not included in this schedule.)[Cement, river sand and all other miscellaneous materials required for the work shall be supplied by the Contractor]. | — | — | — | 43,132.32 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tele_Cir_9-2023.pdf
ATTACHMENT
Tele_Cir_12-2023.pdf
ATTACHMENT
Make in India policy
ATTACHMENT
Critical item list
ATTACHMENT
AdvanceCorrectionSlipNo_7ACS-7.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_8ACS-8.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_9ACS-9.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_10ACS-10.pdf Correction slips to GCC
ATTACHMENT
AdvancecorrectionslipGCCACSno.11.pdf Correction slips to GCC
ATTACHMENT
MakeinIndiaPolicy-Listoftelecomproducts.pdf
ATTACHMENT
InspectionofSafety-CriticalSignallingItemsbyRDSO.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_10ACS-10.pdf
ATTACHMENT
AdvancecorrectionslipGCCACSno.11.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .