| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.0 L+₹11,230.99 (5.85%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.1 L+₹17,700.04 (9.22%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.5 L+₹53,639.20 (27.9%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.0 L
EMD Value
₹30,000
Closing Date
15 May 2026, 3:00 pmClosed
Nagar Ayukta Nagar Nigam Jhnasi
Nagar Nigam Jhansi
TENDER NO.(26) WARD NO.11 KE ANTARGAT MARKA MASZID KE SAMANE MOHIT AGRAWAL KE MAKAN SE TAHIR CHACCA KE MAKAN TAK NALI PULIA AWAM APEX SADAK NIRAMAN KA KARYA.
2026_DOLBU_1141266_26
166/JANKARYA VI./N.NI./2026-27 DATED-18/04/2026
Open Tender
Civil Works
Percentage
30 days
Jhansi
Please refer Tender documents.
1 document required · 1 mandatory
₹354
Nagar Ayukta Nagar Nigam Jhansi
₹30,000
20 May 2026
25 Apr 2026
15 May 2026
25 Apr 2026
15 May 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of foundation in ordinary soil mixed with moorum, Kankar including 1.5m lift and 30m lidad including all mat., lab., T&P etc all complete. (S.I.No.251). | - | Cu.m | 145 | - |
| 2 | Providing & laying of C.C. with 20- 40mm gauge stone ballast coarse sand and cement in the proporation 1:4:8 including supply of all material, labour and T&P etc required for proper completeion of the work (S.I.No.281) | - | Cu.m | 4,175 | - |
| 3 | M150 Bricks work in 1:4 cement .coarse sand mortar in super structur including supply of all mat. lab T & P etc.(S.I. NO. 305). | 1 | Cu.m | 5,940 | ₹5,939.41 |
| 4 | Providing & laying of C.C. with 20mm gauge stone ballast ,coarse sand ,cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc required for proper completion of the work all complete (S.I. No. 279(a)) | - | Cu.m | 5,815 | - |
| 5 | 12mm cement plaster 1:4 cement and fine sand in single coat on fair side of single or half brick wall for interior plastring upto floor two level including internal rounded angles chambers including supply of all mat. Lab. T&P etc. (S.I No. 17.58(2)) . | - | Sq.m | 145 | - |
| 6 | Supply and laying of GSB-I with approved size of stone ballast including etc all complete. | - | Cu.m | 1,613.3 | - |
| 7 | Supply & fixing of 80mm thick precast interlocking concrete block pavement laid in stone dust base and fill joint with fine sand. Joint filled after labling and dressing base including suppy of all materils, labour, T&P etc required for proper completion of the work. (NEW ITEM NO-3) | - | Sq.m | 800 | - |
| 8 | Supply and laying of M30 100mm thick precast R.C.C. M.S. Iron box type slab drain cover including etc all complete. | - | Nos. | 2,250 | - |
| 9 | Supply and laying of M20 80mm thick precast R.C.C. M.S. Iron box type slab drain cover including etc all complete. | - | Sq.m | 2,800 | - |
| 10 | Disposal of surplus earth up to 3.00km distance including etc all complete. | - | Cu.m | 146.2 | - |
stage.html
html • 0.02 MB
finance_2131639.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 22.33 MB
BOQ_2131639.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .