| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Finance | ₹4.3 L | L1 | Admitted-Finance |
| 2 | L2₹4.4 LAdmitted-Finance DHEMOMAIN COLLIERY PO BARADHEMO DIST BURDWAN WEST BENGAL 713367 | 713367 | ₹4.4 L | L2 | Admitted-Finance |
| 3 | L3₹4.4 LAdmitted-Finance DHEMOMAIN COLLIERY PO BARADHEMO DIST BURDWAN PIN 713367 | BARADHEMO | BURDWAN | WEST BENGAL | 713367 | ₹4.4 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M D CHATTARAJ L1 | SHATRUGHAN TRADERS L2 | BIKRAM ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Items Description | ||||||
| 2.001.Lowering of 02 nos of LT pumps (One from 62 Level, 3 Dip to 64Level, 3 Dip and other from 61 L, 2 Dip to 63 Level, 2 Dip) and reinstallation after water level is decreased at Hijuli Seam of Parbelia Colliery, Sodepur Area, ECL. | ||||||
| 2.01 | Lowering of two nos of LT pump motor sets One from 62 Level, 3 Dip to 64Level, 3 Dip and other from 61 L, 2 Dip to 63 Level, 2 Dip and placing and final allignment. | 32 | Head | 1,758.82 ₹56,282.24 | 1,758.82 ₹56,282.24 | 1,758.82 ₹56,282.24 |
| 2.02 | Loading of 02 nos of starters and two numbers of ACBs on empty trolleys and transport to pump site as mentioned above and placing at suitable place. | 16 | Head | 1,758.82 ₹28,141.12 | 1,758.82 ₹28,141.12 | 1,758.82 ₹28,141.12 |
| 2.03 | Transportation of NRV, gfoot valves, Sluice valves, bends etc and final fitting of the pump. | 8 | Head | 1,758.82 ₹14,070.56 | 1,758.82 ₹14,070.56 | 1,758.82 ₹14,070.56 |
| 2.04 | Overhead cost and others | 1 | Nos. | 15,998 ₹15,998 | 17,449 ₹17,449 | 19,230 ₹19,230 |
| 3.002.Transportation of HT pump motor set and installation at 65 Level/25 Dip of Hijuli Seam of Parbelia Colliery, Sodepur Area, ECL | ||||||
| 3.01 | Dismantling of pump & motor from Bedplate and transportation of bed plate and pump from surface to 02 No Haulage and then to 25 Dip/65 Level as all the materials to be transported are extremely heavy. | 20 | Head | 1,403 ₹28,060 | 1,403 ₹28,060 | 1,403 ₹28,060 |
| 3.02 | Transportation of HT motor (weight - 3.4ton) from surface to 02 No Haulage and then to 25 Dip/65 Level | 20 | Head | 1,403 ₹28,060 | 1,403 ₹28,060 | 1,403 ₹28,060 |
| 3.03 | Transportation of HT starter and other electrical fittings from surface to 02 No Haulage and then to 25 Dip/65 Level and unloading and placing | 12 | Head | 1,403 ₹16,836 | 1,403 ₹16,836 | 1,403 ₹16,836 |
Tender Value
₹4.7 L
EMD Value
₹5,900
Closing Date
3 Jan 2026, 3:00 pmClosed
Area Engineer(EnM)
Area Engineer(EnM), Sodepur Area
1.Lowering of 02 nos of LT pumps (One from 62 Level, 3 Dip to 64Level, 3 Dip and other from 61 L, 2 Dip to 63 Level, 2 Dip) and reinstallation after water level is decreased at Hijuli Seam of Parbelia Colliery, Sodepur Area, ECL.
2025_ECL_350010_1
ECL/SDPA/AE(EnM)/e/25-26/306 dt.12.12.2025
Open Tender
Miscellaneous Works
10 days
Sodepur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
30 Jan 2026
24 Dec 2025
5 Jan 2026
24 Dec 2025
3 Jan 2026
24 Dec 2025
24 Dec 2025 - 27 Dec 2025
Lowering of two nos of LT pump motor sets One from 62 Level, 3 Dip to 64Level, 3 Dip and other from 61 L, 2 Dip to 63 Level, 2 Dip and placing and final allignment.
Loading of 02 nos of starters and two numbers of ACBs on empty trolleys and transport to pump site as mentioned above and placing at suitable place.
Transportation of NRV, gfoot valves, Sluice valves, bends etc and final fitting of the pump.
Overhead cost and others
Dismantling of pump & motor from Bedplate and transportation of bed plate and pump from surface to 02 No Haulage and then to 25 Dip/65 Level as all the materials to be transported are extremely heavy.
Transportation of HT motor (weight - 3.4ton) from surface to 02 No Haulage and then to 25 Dip/65 Level
Transportation of HT starter and other electrical fittings from surface to 02 No Haulage and then to 25 Dip/65 Level and unloading and placing
Transportation of 60 amp 3.3KV AY make ACB from surface to 64 Level / 25 Dip and placing
Unloading of Bedplate at track line and hanging from roof bolt then crossing delivery pipe lines and placing at site and fixing with holding bolts
Unloading of HT pump and motor at track line and hanging from roof bolt 06 Hds X 02 then crossing delivery pipe lines and placing on bedplate
Removing of 50 sq mm 3.3 KV grade HT cable from 33 Level/0 Dip coiling on empty trolley and binding for transportation
Alignment of pump motor on Bedplate
Dismantling of 10 nos. of 6 inch 20 feet long MS pipes from 78 Level / 25Dip and manually carrying and then loading on 2 nos. of empty trolleys and binding for transportation
Transportation of 10 nos. 6 inch MS pipes from 78 Level / 25 Dip to 65 Level / 25 Dip laying and fitting
Fitting of suction pipes, delivery bends, NRV, swiss valves and distance pieces and final commissioning of pump
Overhead cost and others
Add. CMPF/EPF @ 12% on Labour charges
Add. Bonus @ 8.33% on Labour charges 8.33%
Add. Pension @ 7% on Labour charges
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Tendernotice_2.pdf
PDF • 1.21 MB
BOQ_362761.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid