Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance KHALARI BAZAR KHALARI DISTT RANCHI 829205 JHARKHAND | KHALARI | RANCHI | JHARKHAND | 829205 | ₹2.5 L | L1 | Admitted-Finance |
| 2 | L2₹2.6 L+₹15,959.03 (6.48%)Admitted-Finance KHALARI RANCHI RANCHI JHARKHAND 829205 INDIA | RANCHI | JHARKHAND | 829205 | ₹2.6 L+₹15,959.03 (6.48%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical STATION ROAD KHALARI PO PS KHALARI DIST RANCHI 829205 | KHALARI | RANCHI | JHARKHAND | 829205 | - | - | Rejected-Technical All techno commercial document of the bid will be not as per e-NIT. |
| Sl No | Description | Qty | Unit | M/S Sri Ram Electricals and Co L1 | M/S AVINASH ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Cost of coper wire in primary winding coil size 18 SWG | 80 | kg. | 1,440.65 ₹1,15,252 Lowest | 1,500 ₹1,20,000 |
| 2.00 | Cost of coper wire in Secondary winding coil size 8 SWG | 100 | kg. | 1,423.7 ₹1,42,370 Lowest | 1,500 ₹1,50,000 |
| 3.00 | Cost of insulation material @ 15 % of Item no. 1 & 2 | 1 | Job | 38,643.3 ₹38,643.3 Lowest | 40,500 ₹40,500 |
| 4.00 | Cost of labour @ 15 % of Item no. 1 & 2 | 1 | Job | 38,643.3 ₹38,643.3 Lowest | 40,500 ₹40,500 |
| 5.00 | Transformer oil filteration 200 ltrs. Cost Rate of filteration as per RWS, Bhurkunda is @ 15/ltrs. | 400 | Ltr | 16.35 ₹6,540 Lowest | 18 ₹7,200 |
| 6.00 | Supply of cork sheet packing 6mm thick for replacement of damaged packing. | 4 | Nos. | 5,450 ₹21,800 Lowest | 6,500 ₹26,000 |
| 7.00 | Less scrape value @ 60% Item no. 1 & 2 | 1 | Job | -1,54,573.2 ₹-1,54,573.2 | -1,62,000 ₹-1,62,000 |
| 8.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 37,561.57 ₹37,561.57 Lowest | 39,996 ₹39,996 |
Tender Value
₹2.3 L
EMD Value
₹2,900
Closing Date
4 May 2026, 5:00 pmClosed
PE(Elect.)
OFFICE OF PO CHP-CPP, Piparwar Area,PO - Bachra, Dist - Chatra, Jharkhand - 829201
Repairing/Rewinding of Two Nos. 100 kVA Transformers, 11kV/440V (Sl. No. HP-06(P) and ETS 1899/1) Installed at Bachra Siding and Karo Rehabilitation Village under CHP-CPP, Piparwar.
2026_CCL_358669_1
PE/Elec/CHP/PPR/E-NIT/26-27/01
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
OFFICE OF PO CHP-CPP, Piparwar Area, CCL, PO - Ba
2 documents required · 2 mandatory
₹2,900
17 Jun 2026
23 Apr 2026
5 May 2026
23 Apr 2026
4 May 2026
23 Apr 2026
23 Apr 2026 - 30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of coper wire in primary winding coil size 18 SWG | 80 | kg. | - | - |
| 2 | Cost of coper wire in Secondary winding coil size 8 SWG | 100 | kg. | - | - |
| 3 | Cost of insulation material @ 15 % of Item no. 1 & 2 | 1 | Job | - | - |
| 4 | Cost of labour @ 15 % of Item no. 1 & 2 | 1 | Job | - | - |
| 5 | Transformer oil filteration 200 ltrs. Cost Rate of filteration as per RWS, Bhurkunda is @ 15/ltrs. | 400 | Ltr | - | - |
| 6 | Supply of cork sheet packing 6mm thick for replacement of damaged packing. | 4 | Nos. | - | - |
| 7 | Less scrape value @ 60% Item no. 1 & 2 | 1 | Job | - | - |
| 8 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_371542.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .