| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-AOC | ₹3.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.2 CrRejected-Finance | ₹3.2 Cr | L2 | Rejected-Finance L2, Rejected |
| 3 | L3₹3.2 CrRejected-Finance F5 SURIYAN ELITE RESIDENCY GANGAI AMMAN KOIL STREET KARUVADIKUPPAM PUDUCHERRY 605 008 | PONDICHERRY | PUDUCHERRY | 605008 | ₹3.2 Cr | L3 | Rejected-Finance L3, Rejected |
| 4 | L4₹3.3 CrRejected-Finance | ₹3.3 Cr | L4 | Rejected-Finance L4, Rejected |
| 5 | L5₹3.3 CrRejected-Finance PLOT NO 5 E BLOCK 203 HARMONEY BLUE MOON ARUL MURUGAN NAGAR ZAMIN PALLAVARAM CHENNAI 600 117 | CHENGALPATTU | TAMIL NADU | 600117 | ₹3.3 Cr | L5 | Rejected-Finance L5, Rejected |
| Sl No | Description | Qty | Unit | RECHI CONSTRUCTION PVT LTD L6 | M/S SRI MARUTHI CONSTRUCTIONS L3 | Vel Constructions L5 | RVM CONSTRUCTIONS INDIA PVT LTD L8 | JAYAKUMARA GURUBARAN J L4 | V M I CONSTRUCTIONS L1 | MKM Constructions L7 | Vishnusurya Projects & Infra Limited L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge.
a) Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 210 | Cum | 750 ₹1,57,500 | 500 ₹1,05,000 | 269 ₹56,490 | 242 ₹50,820 | 500 ₹1,05,000 | 200 ₹42,000 | 1,250 ₹2,62,500 | 500 ₹1,05,000 |
| 2.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge | 30 | Cum | 1,000 ₹30,000 | 1,000 ₹30,000 | 673 ₹20,190 | 275 ₹8,250 | 500 ₹15,000 | 500 ₹15,000 | 1,500 ₹45,000 | 1,000 ₹30,000 |
| 3.00 | Carriage of materials by mechanical transport including loading, unloading and stacking and leveling for a lead of 1 km
a) Lime, moorum, building rubbish | 240 | Cum | 150 ₹36,000 | 100 ₹24,000 | 117 ₹28,080 | 90 ₹21,600 | 100 ₹24,000 | 200 ₹48,000 | 140 ₹33,600 | 200 ₹48,000 |
| 4.00 | Carriage of materials by mechanical transport including loading, unloading and stacking and leveling for a lead of 1 km
b) Earth | 630 | Cum | 150 ₹94,500 | 125 ₹78,750 | 98 ₹61,740 | 98 ₹61,740 | 125 ₹78,750 | 100 ₹63,000 | 180 ₹1,13,400 | 220 ₹1,38,600 |
| 5.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
(a) All kinds of soil | 1,400 | Cum | 200 ₹2,80,000 | 130 ₹1,82,000 | 148 ₹2,07,200 | 111 ₹1,55,400 | 150 ₹2,10,000 | 100 ₹1,40,000 | 200 ₹2,80,000 | 175 ₹2,45,000 |
| 6.00 | Providing, driving with hydraulic piling rigs with power units and installing driven cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) :
(a) 450 mm dia piles | 247.5 | Metre | 3,500 ₹8,66,250 | 2,700 ₹6,68,250 | 1,862 ₹4,60,845 | 4,350 ₹10,76,625 | 3,000 ₹7,42,500 | 2,500 ₹6,18,750 | 2,900 ₹7,17,750 | 3,260 ₹8,06,850 |
| 7.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | 770 | Cum | 150 ₹1,15,500 | 100 ₹77,000 | 73 ₹56,210 | 188 ₹1,44,760 | 100 ₹77,000 | 100 ₹77,000 | 250 ₹1,92,500 | 100 ₹77,000 |
| 8.00 | Supplying, spreading and filling of M sand in ground level including watering, ramming and dressing complete as per the direction of Engineer in Charge | 120 | Cum | 1,900 ₹2,28,000 | 1,400 ₹1,68,000 | 1,857 ₹2,22,840 | 120 ₹14,400 | 1,500 ₹1,80,000 | 1,400 ₹1,68,000 | 2,000 ₹2,40,000 | 1,550 ₹1,86,000 |
| 9.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
(a) 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 110 | Cum | 4,800 ₹5,28,000 | 4,600 ₹5,06,000 | 4,383 ₹4,82,130 | 4,111 ₹4,52,210 | 4,600 ₹5,06,000 | 5,000 ₹5,50,000 | 5,000 ₹5,50,000 | 4,500 ₹4,95,000 |
| 10.00 | Centering and shuttering including strutting, propping etc. and removal of form for:
a) Foundations, footings, bases of columns, etc. for mass concrete | 490 | Sqm | 350 ₹1,71,500 | 325 ₹1,59,250 | 326 ₹1,59,740 | 241 ₹1,18,090 | 330 ₹1,61,700 | 400 ₹1,96,000 | 350 ₹1,71,500 | 600 ₹2,94,000 |
Tender Value
₹4.0 Cr
EMD Value
₹8.0 L
Closing Date
28 Jan 2025, 6:00 pmClosed
Sr. Manager (E-C)
AAI, Puducherry Airport. Puducherry.
Construction of Boundary wall at Puducherry Airport from gate 1 to Terminal Building East Side (Phase II)
2024_AAI_209564_1
AAI/PDY/DGM (E-C)/Boundary wall-Phase-2/2024-25
Open Tender
Civil Works
240 days
AAI, Puducherry Airport
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
₹8.0 L
1 Jul 2026
6 Jan 2025
30 Jan 2025
7 Jan 2025
28 Jan 2025
7 Jan 2025
7 Jan 2025 - 23 Jan 2025
Amount
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. a) Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge
Carriage of materials by mechanical transport including loading, unloading and stacking and leveling for a lead of 1 km a) Lime, moorum, building rubbish
Carriage of materials by mechanical transport including loading, unloading and stacking and leveling for a lead of 1 km b) Earth
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (a) All kinds of soil
Providing, driving with hydraulic piling rigs with power units and installing driven cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) : (a) 450 mm dia piles
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m
Supplying, spreading and filling of M sand in ground level including watering, ramming and dressing complete as per the direction of Engineer in Charge
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (a) 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for: a) Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for: a) Wall (any thickness) including attached plasters butteresses, plinth and string courses etc
Centering and shuttering including strutting, propping etc. and removal of form for: a) Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for: a) Columns, Pillars, Piers, Abutments, Posts and Strut : upto plinth level
Centering and shuttering including strutting, propping etc. and removal of form for: a) Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. a) Thermo-Mechanically Treated bars of grade Fe-500D or more
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. a Thermo-Mechanically Treated bars of grade Fe-500D or more
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-Charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. a) All works upto plinth level i) Concrete of M30 grade with minimum cement content of 350 kg /cum
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-Charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. a) All works above plinth level upto floor V level i) Concrete of M30 grade with minimum cement content of 350 kg /cum
Brick work with bricks of class designation 50 in foundation and plinth in: a) Cement mortar 1:6 (1 cement : 6 coarse sand) (Note:River sand/M Sand should conform to requirements given in the relevant IS code 383 (latest revision)).
Brick work with bricks of class designation 50 in superstructure above plinth level up to floor V level in all shapes and sizes in : a) Cement mortar 1:6 (1 cement : 6 coarse sand) (Note:River sand/M Sand should conform to requirements given in the relevant IS code 383 (latest revision)).
Providing and Fixing 75mm dia unplasticised regid PVC pipes confirming to IS:13592 Type A etc. Complete as per Engineer In- Charge. (i) Single socketed Pipes
12 mm cement plaster: a) 1:3 (1 cement: 3 fine sand)
15 mm cement plaster: a) 1:3 (1 cement: 3 fine sand)
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. a) Hot finished welded type tubes
Finishing walls with Acrylic Smooth exterior paint of required shade : a) New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : a)Two or more coats on new work
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length (total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Removing and stacking the existing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length (total length 90 m), up to 5m height of wall, along with 9 horizontal R.B.T. reinforced barbed wire, including unfastening of G.I. staples and G.I. clips, bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge. The item should be stacked properly in bundles so as to enable reuse of the same after construction of the compound wall in that area
Providing and fixing temporary sheet fencing 3m Height from Ground level, with ISA 65 x 65 x 6mm as vertical members, ISA 50 x 50 x 6mm as horizontal members, connected with nut and bolt arrangement. Vertical members to be fixed at 3m centre to centre and embedded in concrete block of size 60 x 60 x 60 cm. 0.4mm thick colour coated sheet to be fixed with J hook to the horizontal member to form sheet fencing. The temporary fencing should be provided at locations where compound wall is broken for reconstruction as per the security standards and for prevention of animal entry. Once the work is completed, the Sheet fencing should be dismantled. After completion of the whole work, the material will be returned to the agency. The rate shall include materials for the work, excavation of pit for embedding concrete block for fencing post, concreting, loading, unloading, transportation etc. complete as per the direction of Engineer-in-Charge
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. (a) All kinds of soil
Consolidation of subgrade with power road roller of 8 to 10 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade as directed by Engineer-in-charge
Construction of Subgrade embankment with Moorum/gravel soil brought out from approved quarry out side the airport premises. The complete operation will include spreading the Moorum with dozer, dressing, levelling, providing camber, grading with motor grader and consolidating with vibratory roller 8-10 tonne capacity in layers not exceeding 20cm in depth to achieve 95% of the field density including making good the undulation etc. as per technical specifications and drawings complete and directions of Engineer-in-Charge. (Cost includes all leads, taxes, royalty, operations and obtaining field density from the approved lab or Govt Engineering college).
Providing and laying of stone aggregate of 20mm nominal size for filter media with providing of 2mm grid size nylon mesh at one edge of filter media in RCC retaining wall etc. Complete as per the direction of Engineer in charge
Vishnusurya Projects & Infra Limited (BID ID -812649)
M/S SRI MARUTHI CONSTRUCTIONS (BID ID -812854)
JAYAKUMARA GURUBARAN J (BID ID -810999)
Vel Constructions (BID ID -812982)
RECHI CONSTRUCTION PVT LTD (BID ID -806402)
MKM Constructions (BID ID -812676)
RVM CONSTRUCTIONS INDIA PVT LTD (BID ID -812357)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid