| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹8 L
EMD Value
₹40,000
Closing Date
8 Jan 2024, 5:00 pmClosed
Executive Engineer, Jal shakti(PHE) MRD, Sgr
Executive Engineer, Jal shakti(PHE) MRD, Sgr
For fixing of rate contract for repairs to various capacities of HT/LT Distribution Transformers at various WSSs District Ganderbal, Budgam and Srinagar
2023_PHE_241353_1
PHE/MRD/TS/130 of 12/2023
Open Tender
Miscellaneous Works
Item Rate
5 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Executive Engineer JSD PHE Mech Rural Division Sgr
₹40,000
Yes
Executive Engineer, Jal shakti(PHE) MRD, Sgr
18 Jan 2024
27 Dec 2023
9 Jan 2024
27 Dec 2023
8 Jan 2024
27 Dec 2023
3 Jan 2024
Amount
Repairs to 25KVA (aluminium wound) HT/LT Transformer with respect following works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer.
Providing / Fitting of LV Bushing.
Providing / Fitting of LV terminal Bolt with 4 nuts and washer.
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve and Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
Providing / applying of Paint to Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead & Brazing Rod with filler material etc.
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Cost of scrap Iron /MS
Repairs to 63KVA (aluminium wound) HT/LT Transformer with respect following works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer.
Providing / Fitting of LV Bushing.
Providing / Fitting of LV terminal Bolt with 4 nuts and washer.
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve and Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
Providing / applying of Paint to Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead & Brazing Rod with filler material etc.
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Cost of scrap Iron /MS
Repairs to 100KVA HT/LT (aluminium wound) Transformer with respect following works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer.
Providing / Fitting of LV Bushing.
Providing / Fitting of LV terminal Bolt with 4 nuts and washer.
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve and Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
Providing / applying of Paint to Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead & Brazing Rod with filler material etc.
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Cost of scrap Iron /MS
Repairs to 250KVA (Aluminium wound) HT/LT Transformer with respect following works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer.
Providing / Fitting of LV Bushing.
Providing / Fitting of LV terminal Bolt with 4 nuts and washer.
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve and Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
Providing / applying of Paint to Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead & Brazing Rod with filler material etc.
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Cost of scrap Iron /MS
Repairs to 250KVA (Copper Wound) HT/LT Transformer with respect following works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top up/filling up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding Copper)
Providing / Fitting of LV Winding (Copper)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer
Providing / Fitting of LV Bushing
Providing / Fitting of LV terminal Bolt with 4 nuts and washer
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve and Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
Providing / applying of Paint to Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead & Brazing Rod with filler material etc.
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (Copper)
Damaged brass parts
Cost of scrap Iron /MS
Repairs to 400KVA (copper wound) HT/LT Transformer with respect following works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top up/filling up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding Copper)
Providing / Fitting of LV Winding (Copper)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer
Providing / Fitting of LV Bushing
Providing / Fitting of LV terminal Bolt with 4 nuts and washer
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve and Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
Providing / applying of Paint to Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead & Brazing Rod with filler material etc.
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (Copper)
Damaged brass parts
Cost of scrap Iron /MS
Repairs to 400KVA (Aluminium wound) HT/LT Transformer with respect following works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer.
Providing / Fitting of LV Bushing.
Providing / Fitting of LV terminal Bolt with 4 nuts and washer.
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve and Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
Providing / applying of Paint to Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead & Brazing Rod with filler material etc.
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Cost of scrap Iron /MS
Repairs to 630 KVA (Aluminium wound) HT/LT Transformer with respect following works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer.
Providing / Fitting of LV Bushing.
Providing / Fitting of LV terminal Bolt with 4 nuts and washer.
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve and Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper etc
Providing / applying of Paint to Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead & Brazing Rod with filler material etc.
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Cost of scrap Iron /MS
M/s SAJID ENGINEERING WORKS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .