Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically qualified |
| 2 | Accepted-Technical | Accepted-Technical Technically qualified |
| 3 | Accepted-Technical | Accepted-Technical Technically qualified |
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
19 May 2026, 9:00 amClosed
CE, MDA
MDA Office, Sec-13, New Moradabad
Civil Work
2026_MDA_1148200_1
03/MDA/CE/2026-27
Open Tender
Civil Works
180 days
Moradabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
CAO
₹4.2 L
1 Jun 2026
14 May 2026
19 May 2026
14 May 2026
19 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Boundary Wall Works
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and
disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
D.S.R. 2023 Item No. 2.8.1 | 1,011.41 | Cum | 200.74 | ₹2,03,030.44 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
D.S.R. 2023 Item No. 4.1.8 | 141.96 | Cum | 5,253.42 | ₹7,45,775.5 |
| 3 | Providing and laying in position specified grade of cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
D.S.R. Item No. 5.1.3 | 32.4 | Cum | 6,619.52 | ₹2,14,472.45 |
| 4 | Providing and laying in position specified grade of reinforced cement
concrete, excluding the cost of centering, shuttering, finishing and
reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
RCC Work for Raft Footing,
D.S.R. 2023 Item No. 5.1.2 | 0.4 | Cum | 6,976.09 | ₹2,783.46 |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the
following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.
All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum
D.S.R. Item No. 5.33.2.1 | 287.77 | Cum | 7,604.35 | ₹21,88,303.8 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Rate As per MDA 2025 Analysis. | 53,480.68 | kg | 81 | ₹43,31,935.08 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
DSR 2023 Item No. 5.9.1 | 400.98 | Sqm | 302.43 | ₹1,21,268.38 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
DSR 2023 Item No. 5.9.6 | 1,232.28 | Sqm | 741.36 | ₹9,13,563.1 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form forLintels, beams, plinth beams, girders, bressumers and cantilevers
DSR 2023 Item No. 5.9.5 | 1,890 | Sqm | 567.91 | ₹10,73,349.9 |
| 10 | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)
D.S.R. 2023 Item No. 6.2.1 | 185.74 | Cum | 5,016.58 | ₹9,31,779.57 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_2149034.xls
BOQ • 0.29 MB
TDfor02.pdf
Tender Documents • 2.51 MB
Download all tender documents and submit your bid