| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical M2ZX4 OPP DUKES PEPSI COMPANY WAMAN TUKARAM PATIL MARG AMAR NAGAR CHEMBUR MUMBAI MAHARASHTRA 400071 | MUMBAI SUBURBAN | MAHARASHTRA | 400071 | Rejected-Technical techno-commercially rejected |
| 3 | Rejected-Technical | Rejected-Technical techno-commercially rejected |
Tender Value
Refer Docs
Closing Date
16 May 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
L M Padwal
Room no.204, Contract Cell, Administrative building, RCF, Chembur, Mumbai-400074
Kindly submit all the documents as per mentioned in the NIT
2022_RCFL_686903_2
013-CC/IES/PAP/431/L/2223/306
Open Tender
Support/Maintenance Service
Fixed-rate
Chembur
Kindly submit all the documents as per mentioned in the NIT
8 documents required · 8 mandatory
₹0
Exempted
6 Jul 2022
7 May 2022
16 May 2022
7 May 2022
16 May 2022
7 May 2022
120 days
PG-Calibration of faulty pressure gauges.
PG-Replacement of defective pressure gauge with isolation valve. PG removal and shifting to workshop.
PG-Rectification of leakage from PG 1/2 inch process connection.
Magnetic Flow Meter(size: 1/2inch to 3inch)- Fixing of mag flow meter at new location.
Magnetic Flow Meter(size: 1/2inch to 3inch) - Removal, cleaning and fixing back of flow tube.
Magnetic Flow Meter - Replacement of defective converter & Checking and programming of converter.
Magnetic Flow Meter -Cabling, glanding and termination of mag flow meter & checking of flow tube & Checking calibration of mag flow using simulator.
Magnetic Flow Meter -Rectification/replacement of defective earthing & rectification of leakage problem of mag flow.
Magnetic Flow Meter - checking of flow tube , modification and new installation of mag flow meter
Control Valve (size 1inch to 6inch)- Overhauling of control valve
Control Valve (size 1inch to 6inch) - Removal and shifting of control valve to workshop for maintenance & Rectification of gland leakage from the stem.
Control Valve - Removal and rectification of gland, flange & seat leakage.
Control Valve - Replacement of defective AFR of control valve.
Control Valve - Replacement of defective Positioner of control valve.
Control Valve - Control valve fixing calibration and taking in line Control valve removal, cleaning and shifting to store.
Control Valve - I/P Converter cable laying, dressing, glanding and termination.
Control Valve - Relocation, modification and new installation of control valve
Local/Loop Indicator: Fixing of local indicator, Termination, Wire dressing.
ULT-Fixing, cabling and termination of ULT, ULT removal, cleaning and mounted back, Cable laying dressing for ULT. Fixing, cabling and termination of local indicator for ULT.
LEVEL SWITCH- Removal cleaning and replacement of grill choke.
Level Switch - Relocation, modification and new installation of Level Switch
DPT/PT- Impulse line cleaning.
DPT Remote seal- Removal of Pad & cleaning.
DPT/PT Adjusting Zero shift.
DPT/PT- Calibration & Isolating, cleaning of LT flange and taking in line.
DPT- Cleaning of LT cable and re-terminating & Power resetting of LT and taken in line.
DPT- Adjusting Zero shift.
RADAR LT- LT removal, cleaning and shifting to store & Checking calibration of Radar LT.
RADAR LT- LT fixing, glanding & termination & Programming of Radar level transmitter.
RTD or TT - removal, cleaning and shifting to store & Checking calibration of RTD or TT.
Thermowell - Leakage testing of Thermowell, Wielding of Thermowell.
Thermowell - Cleaning, Fixing of RTD, Cable laying, Cable dressing Termination in JB,
DCS- Replacement of defective fan & Loop checking of control loop.
DCS- Updating of Panel and JB Wiring.
DCS- Fixing cable ducts cover after cable dressing & Replacement of defective glass fuse.
DCS- Cleaning of all the panels and consoles.
DCS- Terminals tightened in all panels, Mounting of fuse TB and normal TB & Wiring job for panel.
DCS- Fixing of relay panel, diode array block & Mounting of isolators.
Weigh-feeder:- Belt Sway Alignment job.
Weigh-feeder:- Daily Checking of Limit Switch operation
Weigh-feeder:- Installation/wiring/Termination of Limit Switch
Weigh-feeder:- Installation/wiring/Termination of Load Cell & Loop-checking.
Weigh-feeder:- Cleaning of Front Roller, De-scaling of Bottom Roller.
Weigh-feeder:- Cleaning/replacement of Proximity Probe.
Weigh-feeder:- Rock flooding switch removal/Cleaning
Weigh-feeder:- Motor Removal, Shifting from Plant site to Workshop.
Dust Collector - Complete Dust collector Valve replacement.
Dust Collector - Diaphragm & Spring Cleaning & replacement.
Dust Collector - Wiring Termination of SOV.
Pneumatic Pump:- SOV replacement & cleaning, wiring termination & Repair of SOV Body
Pneumatic Pump:- Limit switch replacement & cleaning, wiring termination & Repair
Pneumatic Pump:- Limit switch Alignment wrt to TOP gate/Bottom gate Cylinder arm.
Pneumatic Pump:-Replacement of TOP gate/Bottom gate Cylinder.
Pneumatic Pump:-Replacement of 2inch Ball Valve.
Grinding Section: Flushing of Pressure/Differential Pressure Transmitters tappings with Inst Air
Dust Collector - Covering SOV with polyethene & Removal, cleaning and shifting of SOV to store.
DCS Workstation- Routine checking cleaning and up keeping & Providing printer and installing in Workstation.
DCS Workstation- Replacing defective monitor & defective mouse of computer.
DCS Workstation- Relocating with table from one location to another location.
Others- Shifting of material and instrument/Workstation/Control Valve from one location to another & Material shifting from main store to plant.
Others - Shifting of cable drums/Old Structures
Others - Covering with polyethene sheet on field instrument for rainy season protection.
Others - Cloth tracking relay cleaning.
Others - Fill-up of Oil in bellow Sump.
Others - 1/4inch & 1/2inch SS tubing.
Others - Leak arrest from SS tubes or PVC tubes
Others - Rectification, Fixing of Air filter Regulator & Rectification of push button problem of plant PA system.
Others - Cleaning JB & field instrument.
Others - Preparing and fixing FRP canopy for field instrument, Bellows and JB.
Others - Replacement of defective solenoid valve.
Others - Multi core cable, Instrument Signal cable, Power cable laying glanding and termination
Others - Housekeeping job for instrument's in different units.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .