Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical Accepted |
| 4 | Accepted-Technical 1406 MAPPLE TOWER PARAMOUNT SYMPHONY CROSSING REPUBLIC GHAZIABAD UTTAR PRADESH 201016 | GHAZIABAD | UTTAR PRADESH | 201016 | Accepted-Technical Accepted |
Tender Value
Refer Docs
EMD Value
₹25,040
Closing Date
18 Sept 2026, 10:00 amClosed
Executive Engineer, Ferozepur Drainage Mining Div
Executive Engineer, Ferozepur Drainage Cum Mining Division Ferozepur
Project Estimate for Flood Plain Zoning of River Sutlej taking into account the 1 100 year Highest Flood Level using the HECRAS Model
2026_WR_174237_1
01/Spl/25M
Open Tender
Civil Works
Item Wise
60 days
Ferozepur Drainage and Mining Division WRD
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹25,040
21 Sept 2026
26 Aug 2026
18 Sept 2026
26 Aug 2026
18 Sept 2026
26 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Nature of work- Flood plan zoning of river Sutlej taking into account 1:100 years highest flood level using HECRAS model. | 1,768.32 | Sq.Km | 1 | ₹1,768.32 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
SBD.pdf
Tender Documents • 0.81 MB
BOQ.xls
Additional Documents • 0.28 MB
corrigendum3738.pdf
PDF • 0.37 MB
Corrigendum3734.pdf
PDF • 0.27 MB
Corrigendum3710.pdf
PDF • 0.20 MB
Corrigendum3706.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .