| Sl No | Description | Qty | Unit | R A SUNDARRAJAN L2 | A N KANNAN L1 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 MDU-CORP-BUILDING DATA-P-18-SL No:1 | 6 | m3 | 288.6 ₹1,731.60 | 275.9 ₹1,655.40 |
| 2.01 | Supplying and filling in foundation and basement with Quarry Dust in layers of 15cum thick well rammed and consolidated including watering complying with std. specification etc. MDU-CORP-BUILDING DATA-P-19-SL No:5 | 3.5 | m3 | 672.2 ₹2,351.19 | 642.6 ₹2,247.65 |
| 3.01 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification P:18 S:10 | 4 | m3 | 6,460.5 ₹25,842 | 6,176.4 ₹24,705.60 |
| 4.01 | Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides) MDU-CORP-BUILD-DATA-P (21) - Sl (14-f) | 25 | m2 | 1,068.4 ₹26,710 | 1,021.4 ₹25,535 |
| 5.01 | Plain Cement concrete 1:2 :4 (one cement, two sand & four course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc., complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 5 | m3 | 7,502.9 ₹37,488.24 | 7,172.9 ₹35,839.39 |
| 6.01 | Dadooring the colour glazed wall tiles of size 300mm x 200 x 6mm pardon cement morter 1:2:10mm thick and pointing with white cement using 0.40kg/m2 including finishing the joints and pointing flesh with total surface etc., complete 1m2 | 17 | m2 | 1,659.2 ₹28,206.40 | 1,586.2 ₹26,965.40 |
| 7.01 | Providing Stainless pipe of 4" dia for vertical post with supporting members of 40X40X3mm S.S Channel with cross tie members 40X40X2mm SS channel and roof purlin of 4"dia pipe with ncessary base plates bolt an nuts etc Complete. The rate including cost of all meterials labour Charges for welding and errection chargs etc Complete. (Size :6.0X2.10) | 1 | No | 97,207 ₹97,207 | 92,932.1 ₹92,932.10 |
| 8.01 | Supplying and fixing in position Galvalume sheet roof the rate shall include cost of Galvalume sheet provided for the bottom of the sheet and labour charges sheet fixing in correct position etc complete | 19 | m2 | 1,156.9 ₹21,981.10 | 1,106 ₹21,014 |
| 9.01 | Supplying and Fixing of Hoarding Board arrangements Hoarding Board | 33 | m2 | 298.4 ₹9,847.20 | 285.3 ₹9,414.90 |
| 10.01 | Supplyin and fixing Stainless Steel chair for sitting arangements as directed by the corporation engineer. The rate includes 4"Stainless steel sheet and all labour charges, welding molding and conveyance charges etc, Complete | 2 | No | 28,647.8 ₹57,295.60 | 27,388 ₹54,776 |
Tender Value
₹6.0 L
EMD Value
₹6,044
Closing Date
22 Jan 2026, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai , Thallakulam , Madurai
Providing Bus Shelter arrangements at NTC Hospital near in Ward No.21.
2026_MAWS_640022_1
E7 / EST.311 / 2025-26 MP
Open Tender
Civil Works
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹6,044
4 Mar 2026
8 Jan 2026
22 Jan 2026
8 Jan 2026
22 Jan 2026
8 Jan 2026
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 MDU-CORP-BUILDING DATA-P-18-SL No:1
Supplying and filling in foundation and basement with Quarry Dust in layers of 15cum thick well rammed and consolidated including watering complying with std. specification etc. MDU-CORP-BUILDING DATA-P-19-SL No:5
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification P:18 S:10
Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides) MDU-CORP-BUILD-DATA-P (21) - Sl (14-f)
Plain Cement concrete 1:2 :4 (one cement, two sand & four course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc., complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
Dadooring the colour glazed wall tiles of size 300mm x 200 x 6mm pardon cement morter 1:2:10mm thick and pointing with white cement using 0.40kg/m2 including finishing the joints and pointing flesh with total surface etc., complete 1m2
Providing Stainless pipe of 4" dia for vertical post with supporting members of 40X40X3mm S.S Channel with cross tie members 40X40X2mm SS channel and roof purlin of 4"dia pipe with ncessary base plates bolt an nuts etc Complete. The rate including cost of all meterials labour Charges for welding and errection chargs etc Complete. (Size :6.0X2.10)
Supplying and fixing in position Galvalume sheet roof the rate shall include cost of Galvalume sheet provided for the bottom of the sheet and labour charges sheet fixing in correct position etc complete
Supplying and Fixing of Hoarding Board arrangements Hoarding Board
Supplyin and fixing Stainless Steel chair for sitting arangements as directed by the corporation engineer. The rate includes 4"Stainless steel sheet and all labour charges, welding molding and conveyance charges etc, Complete
Supplyin and fixing Stainless Steel dust bin arangements as directed by the corporation engineer. The rate includes 2"Stainless steel pipe and Stainless steel round plate waste Collecting drum and all labour charges,Cutting , welding
Solar Inverter Battery Supply and Erection 1450Va/24 VDC Solar Inverter UPS
SolarPV Panel 250 Watts
150aAH Tubeler Batteries
Supply and fixing 18W 4 Feet LED Fitting with LED
Wiring with 2 x 1.5 sq.mm. (22 / 0.3 ) PVC insulated single core unsheathed copper conductor cable of 1100V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with TW switch box and 5A FT switch with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for open PVC light point / fan point (for electronic regulator) ELECTRICAL-SD-20
Supply and Fixing of 30Watts LED OUTDOOR FITTINGS (LIGHT EMITTING DIODE) Higher End Philips / Havells / Equivalent TWAD-DATA-P-174-Sl-17-a
Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick at required locations to a height of 900mm from finished floor level welded to 38mm dia Stainless Steel pipe post of 1.00mm thick as vertical at 900mm centre with 2 Nos. of 25mm dia intermediate horizontal stainless steel pipe of 1.60mm thick in between. The vertical pipe has to be welded to the 100 X 100 X 6mm MS base plate encased in the base concrete. The rate is inclusive of the charges for cutting, bending, welding, grinding, polishing, conveyance, electrical charges, etc. complete PWD SOR Pg. No. 57 Sl.No. 244
Add GST 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
document.pdf
Tender Documents • 0.82 MB
BOQ_766284.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid