Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.0 LAccepted-Finance | ₹82.0 L | L1 | Accepted-Finance successfully quoted lowest rate |
| 2 | L2₹92.8 L+₹10.7 L (13.1%)Accepted-Finance | ₹92.8 L+₹10.7 L (13.1%) | L2 | Accepted-Finance quoted high rate |
| 3 | L3₹94.2 L+₹12.2 L (14.9%)Accepted-Finance THIKSAY | ₹94.2 L+₹12.2 L (14.9%) | L3 | Accepted-Finance quoted high rate |
| 4 | L4₹1.0 Cr+₹18.1 L (22.1%)Accepted-Finance HOUSING COLONY | ₹1.0 Cr+₹18.1 L (22.1%) | L4 | Accepted-Finance quoted high rate |
| 5 | L5₹1.0 Cr+₹21.6 L (26.3%)Accepted-Finance | ₹1.0 Cr+₹21.6 L (26.3%) | L5 | Accepted-Finance quoted high rate |
Tender Value
Refer Docs
EMD Value
₹2.8 L
Closing Date
5 Mar 2026, 2:00 pmClosed
Executive Engineer REW Leh
REW Leh
Upgradation of Community Gathering Centre Sabu.
2026_RDD_18467_1
144- UTL REW Leh of 2025-26
Open Tender
Civil Works - Others
Percentage
240 days
Leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Payable To Executive Engineer REW Leh
₹2.8 L
15 Jul 2026
11 Feb 2026
7 Mar 2026
11 Feb 2026
5 Mar 2026
11 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil | 29.45 | cum | 548.82 | ₹16,162.75 |
| - | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | 71.72 | cum | 208.42 | ₹14,947.88 |
| - | Ordinary Rock | 64.11 | cum | 383.89 | ₹24,611.19 |
| - | Hard Rock | 116.81 | cum | 1,095.42 | ₹1,27,956.01 |
| - | Dumping stone including cost of stones.in Horizontal on level | 19.61 | cum | 953.03 | ₹18,688.92 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 17.8 | cum | 6,606.08 | ₹1,17,588.22 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4(1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 13.76 | cum | 7,993.55 | ₹1,09,991.25 |
| - | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished 40 mm thick with 20 mm nominal size stone aggregate | 142.14 | sqm | 578.88 | ₹82,282 |
| - | Demolishing mud phaska in terracing and disposal of material within 50 metres lead. | 119.67 | sqm | 627.54 | ₹75,097.71 |
| - | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In mud mortar | 15.97 | cum | 484.08 | ₹7,730.76 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_44370.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .