| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹18.0 L+₹179.50 (<0.01%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹18.0 L+₹538.50 (0.03%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹17.9 L
EMD Value
₹1.8 L
Closing Date
14 Oct 2026, 3:00 pmClosed
Executive officer
Nagar panchayat jansath old office
Construction of a CC road and drain from Manoj house to Krishna Shishu Sadan School in Ward No. 05.
2026_DOLBU_1194933_1
123/NPJ/2026-27(16)
Open Tender
Civil Works
Percentage
90 days
nagar panchayat jansath
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,250
Executive officer
₹1.8 L
16 Oct 2026
9 Oct 2026
14 Oct 2026
9 Oct 2026
14 Oct 2026
9 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of old C.C. Interlocking tiles including
stacking of old Tiles. | 505.18 | sqm | 13 | ₹6,567.34 |
| 2 | Disposal of malba from the site lead up to 2.00 Km | 40.42 | cum | 124.8 | ₹5,044.42 |
| 3 | Earth work in Filling 20 cm. layers including
remming and dressing the surface to required levels and slopes and also including 10.00 Km cartage as directed by the Engineer incharge. (Royality removed by Govt.) for small works/ Abadi area. (where machine can not move) S.I. 253a+261b+231a | 303.03 | cum | 282.5 | ₹85,605.97 |
| 4 | Cement Concrete with 4 cm gauge approved stone
Ballast,coarse sand & cement in the proportion of
(8:4:1) including supply of all materials, labour, Tools & 1 plants etc.required for proper completion of the work. Asper S.I. No. 279 | 50.52 | cum | 4,850 | ₹2,45,022 |
| 5 | Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of (4:2:1) including supply of all materials, labour, Tools & plants 4 etc. required for proper completion of the work. S.I. No. 279(a) | 23.74 | cum | 5,750 | ₹1,36,505 |
| 6 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired ensity, complete as per Technical Specification Clause 401. | 151.53 | cum | 3,094 | ₹4,68,833.82 |
| 7 | Cement concrete with 2 cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.5:3 in cc pavement (thickness as per design) cement coarso & fine aggregate confirming to IS standard mixed in concrete mixture/Plant of not less thon 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel) channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes,compacted using needle, screed and plate vibrators and finished in continuous operation including hassion doth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools & plants etc. required for proper completion of work and also including complete shifting of Recron 38 fibre reinforcement material etcl & concrete etc. Asper S.I. No. 10.3 New Item 9 | 74.9 | cum | 7,300 | ₹5,46,770 |
| 8 | R.C.C Work with cement, approved coarse sand & 2
cm gauge approved stone grit in proportions of
(1:1.5:3) in Nala Bottom and wall including supply of
reinforcement and its bending, but including its fixing
and binding the same with 24 B.W.G.G.I. binding wire 1 and including necessary centering and shuttering
etc.and supply of all materials,labour, Tools&plants
etc.required for proper completion of the work including cost of binding wire. S.I. No.-284(a) | 1.26 | cum | 7,400 | ₹9,324 |
| 9 | Mild steel or iron in plain work such as reinforced
concrete or reinforced brick work(When not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & over lapping & hooks. As per S.I No-504 As per Analysis with SAIL TOR STEEL RATES. | 0.99 | Qtl | 8,408 | ₹8,323.92 |
| 10 | M.S. or iron work in Stair case railing in heavy sizes
such as trusses,built up gates,record racks, roof
work,Gates etc.including rivetting or welding where
necessary. Asper S.I. 502 A | 0.68 | Qtl | 6,150 | ₹4,182 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.64 MB
BOQ_2256290.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .