Loading…
Loading…
Tender Value
₹3.0 L
EMD Value
₹5,960
Closing Date
6 Aug 2026, 6:00 pm5d left
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Construction of Community Pacca Path from Jamaia Masjid to Waznara Ward No 1 in Panchayat Baransal Block Gulabgarh Pyt Baransal Block Gulabgarh Distt. Reasi under Scheme capex PRI for the year 2026-27
2026_RDPR_318436_3
e-NIT No. 74 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
90 days
Reasi Gulabgarh REASl
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹5,960
29 Jul 2026
29 Jul 2026
7 Aug 2026
29 Jul 2026
6 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :1 meter from cutting edge | 12.99 | cum | 479.3 | ₹6,226.11 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) including all leads, lift and carriage complete | 12.15 | Cum | 4,826.5 | ₹58,641.98 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 14.41 | sqm | 5,733.6 | ₹82,621.18 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 225.84 | sqm | 286.35 | ₹64,669.28 |
| 7 | Construction of CIB (includes concrete Pedestrial/Brick 3*2, Plastering,Painting complete job as per direction of Engineer in charge | 1 | No. | 3,000 | ₹3,000 |
| 8 | Carriage of cement from an avg. distance of 30 K.M by MT & 2500 M by AT | 4.75 | MT | 1,029.54 | ₹4,890.32 |
| 10 | Carriage of Sand & aggregate & sand from an avg. distance of 75 K.M by MT & 2500 Meter by AT | 52.49 | Cum | 1,486.76 | ₹78,040.03 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_1049386.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].