Loading…
Loading…
Tender Value
₹9.5 L
EMD Value
₹9,537
Closing Date
19 Jun 2026, 5:00 pmDue today
Similar tender results from the same govt authority in the past 3 years.
Superintending Engineer-III, BDA, Bhubaneswar
Office of the Superintending Engineer-III, BDA, Bhubaneswar
Basic provisions including Bio Medical Waste disposal in proposed UH and WC at Chandrasekharpur AHP, Buddhavihar, Bhubaneswar
2026_BDABU_131647_2
BDA /490/SE-III/2026-27, Dated-08/06/2026
Open Tender
Civil Works - Others
90 days
Bhubaneswar
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,720
₹9,537
Yes
9 Jun 2026
9 Jun 2026
20 Jun 2026
9 Jun 2026
19 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earthwork in excavation upto 1.50mtr depth of foundation trenches for columns, basement, tie beams, walls and steps in all kinds of soil including moorum, hard stony earth, earth mixed with boulders etc but not requiring blasting with initial leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, design including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. | 15.16 | CUM | 304.92 | ₹4,622.59 | 1 |
| 2 | Supplying and filling the Foundation & Plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance, royalty of all materials, cost of all labour, T&P etc. as required for the work complete as per direction of the Engineer-in-charge. | 4.08 | CUM | 533.4 | ₹2,176.27 | 2 |
| 3 | Providing & laying P.C.C. of prop.(1:4:8) in F & P, fountain, pathway toe wall, fountain base, base of column using 40mm nominal size down graded, screend, washed hard black cursher broken granite metal of approved quality & from approved quarry including laying in the layers hoisting, lowering, laying, watering and curing etc. complete to the requaired levels including cost, conveyance, royalty of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer-in-charge. | 3.23 | CUM | 5,715.35 | ₹18,460.58 | 3 |
| 4 | Dismantling and removing old tiles flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50m lead etc. complete and direction of Engineer in charge. | 64.99 | SQM | 144.25 | ₹9,374.81 | 4 |
| 5R.C.C. work of M-20 having minimum compressive strength of 200kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer-in-charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per direction of Engineer-in-charge (but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. | ||||||
| 5.01 | Plinth Beam | 0.64 | CUM | 7,346.47 | ₹4,701.74 | 6 |
| 5.02 | Chajja | 0.9 | SQM | 1,225.85 | ₹1,103.26 | 7 |
| 5.03 | Lintel | 0.14 | CUM | 14,139.46 | ₹1,979.52 | 8 |
| 5.04 | Roof Slab | 0.63 | CUM | 13,724.06 | ₹8,646.16 | 9 |
| 6 | Providing & fixing TOR Fe-500 D grade reinforcement bars of approved makes as per DTCN for RCC work of required diameter with straightening, cutting, bending, binding welding and joining (if necessary) and tying the grills and placing in position as required for R.C.C. work and providing fan hooks, hoisting, lowering and laying including cost, conveyance and taxes of tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all heights as per the drawing, design and direction of Engineer-in-charge. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.) | 1.11 | QNTL | 9,544.2 | ₹10,594.06 | 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.72 MB
DTCNbioMEDICALahpBUDDHA.pdf
Tender Documents • 0.99 MB
BOQ_595703.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid