Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NOT SPECIFIED | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹39.1 L
EMD Value
₹39,500
Closing Date
14 Nov 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer ( V.Pt ) Vembakkam
Vembakkam
Execution of AGAMT II 2022-2023 Rejuv of Senainallur Kulam at Senainallur ( Desiliting, Bathing Ghat), Const of school Toilet PUES, Const of PDS Building at Senainallur, Const of Threshing Floor at Senainallur in Poonaithangal at Vembakkam Block
2022_RDTN_261468_1
No. 2156/2022/A13-13 Date. 06/10/2022 VEM07
Open Tender
Civil Works - Others
Item Rate
90 days
Block Development Office, Vembakkam
Please Refer Tender Documents
3 documents required · 3 mandatory
₹0
₹39,500
Yes
17 Nov 2022
7 Nov 2022
14 Nov 2022
7 Nov 2022
14 Nov 2022
7 Nov 2022
Amount
Rejuvenation of Senainallur Kulam at Senainallur in Poonaithangal Panchaiyat AGAMT II 2022-23
Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
Provision for Bathing Ghat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
BABY POND LINING WALL
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Provision for Inlet
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Provision of Retainingwall
Earth work excavation and depositing onsides with initial lead of 10 meter and initial lift of 2 meters in sand,silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 B
Filling with good river sand including cost and conveyance of all materials and all labours chages etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to all material to site and all labour charges etc., complete
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour chages etc.,
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Construction of Girls Toilet in PUES at Senainallur in Poonaithangal Panchayat
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation etc complete
Refilling with basement with excavated earth other than sand coplying the standard specification
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete.
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete - Below GL
Above GL
Brick work in cm 1:5 mix(one cement and five sand )using country bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Special Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and fabrication of Mild steel doors of any size with single leaf outer frae including cost and conveyance and all charges etc complete.
Steel Door -D1 0.90X2.10
Steel Door -D1 1.10.X2.10
Supplying and fixing in position Indian water closet of size 580 X 440mm, white glazed earthen ware of approved quality with 'P' trap or 'S' trap confirming to IS:2556 -Part XII with sand cushion and forming the closet using 40mm broken brick jelly in lim
Urinals Gents
Wash basin
25mm PVC Pipe
25mm PVC Bend
25mm PVC Tee
90mm PVC Pipe
90mm PVC Bend
90mm PVC Tee
Paving the floor with plain/design ceramic tiles (colour and shade as directed) of size 200 mm x 200mmx6mm in all floors over a base layer of cement mortar 1:3 (one cement and three sand ) 20mm thick laid in-situ and pointed with same coloured ce
Dadooing walls with Glazed tiles of sizes 150mm X150mm X 6mm size of approved make and quality and colour lSet in cement mortar 1:2 (one cement ,two sand) over 10 mm base layer plastering and pointing with white cement neatly as directed.
Finishing top roof mix one course machine pressed tiles pf size 20 CMx20 CM x2 CM approved Qty CM 1:3 12mm thick WPC at 2% Toilet Roof Top
Distembering two coats of oil bound distember using one coat of primer coat including cost & conveyance to size and all labour charges etc., complete.
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete .
Painting two coats of new iron work with best quality synthetic enamel paint of approved quality and colour with priming coat including the cost all materials etc.,complete, in all floors.
Construction Of PDS building at Senainallur in Poonaithangal Panchayat
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., as directed by the departmental officers complete complying with standard specifications.
Brick work in CM 1:5 mix using country bricks ground moulded of size 83/4"x41/4"x21/4" for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Basement
Above Basement (Super Structure)
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing
Supplying and erecting centering shuttering including necessary supports for plane etc., complete.
Below GL
Above GL
Floor finish with granolithic flooring in CC 1:2:4 mix using 10 to 12mm chips for 40mm thick including cost and conveyance of all materials and labours etc., complete
Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per Sqm mixed with colouring pigment to suit the colour of the tiles including finishing the joints neatly complying with the standard specifications and as directed by the departmental officers. (The ceramic tiles should be got approved from the Departmental officers before execution).
Dadooing walls with Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the standard specifications and as directed by the departmental officers. The Glazed tiles should be got approved from the Departmental officers before execution.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:3 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc complete.
Supplying and fabrication of Mild steel doors of any size with single leaf outer frae including cost and conveyance and all charges etc complete.
Doors D
Doors D1
Window W(1.00x1.30)m
Ventilator V (0.90 x 0.60m)
Rolling shutter
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Labour Charges for Fixing the Doors inculding all Charges etc..
Labour Charges for Fixing theSteel Window inculding all Charges etc..
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board including all cost and conveyance and all labour charges etc .comp.
Cost and supply of Oriya type IWC with "P" or "S" trap etc., Complet (White)
Supply and fixixng of 15mm dia Brass CP screw down tap
Supply and fixixng of 1000 litre HDPE tank
Construction of Threshing Floor near Senainallur meenkuttai at poonaithangal Panchayat
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
Collection & Supply of US Gravel with 1 Km lead including cost and conveyance to the site and all labour etc complete.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C.1:3:6 using 20mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C.1:2:4 using 20mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
JCK Constructions
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .