Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC CINAMA ROAD ANPARA P O ANPARA SONEBHADRA 231220 UTTAR PRADESH INDIA | SONBHADRA | UTTAR PRADESH | 231220 | L1 | Accepted-AOC As per TC recommendation. | |
| 2 | L2₹1.9 L+₹2,664 (1.45%)Rejected-Finance 00 KIWADI SAFEDABAD BARABANKI BARABANKI UTTAR PRADESH 225001 | BARABANKI | UTTAR PRADESH | 225001 | L2 | Rejected-Finance As per NIT | |
| 3 | L3₹1.9 L+₹9,884 (5.40%)Rejected-Finance HOUSE NO 3 KAKRI SONEBHADRA UTTAR PRADESH INDIA 231224 | SONBHADRA | UTTAR PRADESH | 231224 | L3 | Rejected-Finance As per NIT |
Tender Value
₹2.2 L
EMD Value
₹2,800
Closing Date
14 Aug 2024, 10:00 amClosed
M K Pandey
O/o AGM, Bina Area, NCL, District Sonebhadra (UP), Pincode 231220
Repairing and Rebuilding of wornout bucket assembly of Hydraulic Shovel and Repairing and welding of dipper handle eye and its connecting eye of bucket assembly and bell bar eye with bush fitting in BE195 Shovel
2024_NCL_314149_1
Bina/SO(Excv)/Tender/24-25/27 dt 03.08.2024
Open Tender
Excavation Department Work
Item Rate
18 days
Bina Project, NCL
As per NIT
5 documents required · 5 mandatory
₹2,800
3 Nov 2024
3 Aug 2024
15 Aug 2024
4 Aug 2024
14 Aug 2024
4 Aug 2024
4 Aug 2024 - 11 Aug 2024
Amount
Repairing / Rebuilding of worn-out bucket assembly of Tata-Hitachi ZX650-1 (EXC-3143) Hydraulic Shovel
Charges for repairing of Dozer track shoe cutting, cleaning and removal of worn-out plate and adopter. (Labour consists of 01 no. supervisor for a period of 2 shiftdays i.e. 2 shift X 1 day, 02 no. welder for a period of 2 shiftdays i.e. 2 shift X 1 day, 1 no. skilled fitter for a period of 2 shiftdays i.e. 2 shift X 1 day and 02 nos. semi-skilled helper for a period of 2 shiftdays i.e. 2 shift X 1 day)
Charges including contractors profit for Welding and fixing of dozer plate, adopter fitment and reinforcement. (Labour consists of 01 no. supervisor for a period of 10 shiftdays i.e. 2 shift X 5 days, 02 no. welder for a period of 10 shiftdays i.e. 2 shift X 5 days, 1 no. skilled fitter for a period of 10 shiftdays i.e. 2 shift X 5 days and 02 nos. semi-skilled helper for a period of 10 shiftdays i.e. 2 shift X 5 days)
Contractors profit
Hiring charges of 2 nos. welding machine; 2 nos. of welding / cutting accessories.
Repairing / welding of dipper handle eye (2 nos.) and its connecting eye of bucket assembly (4 nos.) & bell bar eye (2 nos.), with 8 nos. bush fitting of 4 nos. BE-195 (BE-2, BE-3, BE-4 & BE-5) Rope Shovel
Charges including contractors profit for Repairing / welding of dipper handle eye (2 nos.) and its connecting eye of bucket assembly (4 nos.) & bell bar eye (2 nos.), with 8 nos. bush fitting of each. BE-195 Rope Shovel. (Labour consists of 1 no. Supervisor for a period of 36 shiftdays i.e. 3 Shift X 12 days; 01 no. Skilled welder for a period of 36 shiftdays i.e. 3 Shift X 12 days, 01 no. Skilled grinderman for a period of 16 shiftdays i.e. 2 Shift X 8 days and 02 nos. Semiskilled helper for a period of 36 shiftdays i.e. 3 Shift X 12 days)
Contractors profit
Hiring charges of 1 no. welding machine; 1 set of welding accessories and cutting set.
Hiring charges of 1 no. grinding machine with stone.
Total impact of GST for the purpose of CTC
M/S KUMAR ENTERPRISES
M/s RAJENDRA ENGINEERING WORKS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_325617.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .