| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.4 LAdmitted-Finance 86 HARIDAS DUTTA ROAD JAYNAGAR DIST SOUTH 24 PARGANAS PIN 743337 | 24 PARAGANAS SOUTH | WEST BENGAL | 743337 | L1 | Admitted-Finance | ||
| 2 | L2₹8.0 L+₹60,593.02 (8.16%)Admitted-Finance DIAMOND HARBOUR ROAD FATEPUR 24 PGS SOUTH PIN 743513 | FATEPUR | SOUTH 24 PARGANAS | WEST BENGAL | 743513 | L2 | Admitted-Finance | ||
| 3 | L3₹10.3 L+₹2.9 L (38.6%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹15.1 L
EMD Value
₹30,297
Closing Date
8 Jun 2026, 12:30 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER MIDNAPORE HIGHWAY DIVISION P.W.(ROADS) DIRECTORATE, SAHID MANGAL PANDEY SARANI, MIDNAPORE PASHIM MEDINIPUR, PIN-721101
Sub Soil investigation in connection with Construction of proposed bridge over river Keleghai at Katakhali 13th km of Sabong to Mohar Road under Midnapore Highway Division
2026_WBPWD_5014364_1
WBPWD/RD/EE/MHD/NIT2/26-27
Open Tender
CIVIL WORKS
Percentage
60 days
MIDNAPORE
Please refer Tender documents.
4 documents required · 4 mandatory
₹30,297
9 Jul 2026
21 May 2026
10 Jun 2026
24 May 2026
8 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Mobilisation Charges of all tools & Plants along with
accessories, material, labour, supervision etc. at site
of work required in connection with boring and
testing work, including setting up boring rigs and
shifting to different Bore-hole points etc. and also
including withdrawal of same from the site after
completion of work, complete as per direction of
Engineer-in-Charge. Detailed Investigation | - | L.S | 25,000 | - |
| 2 | Labour for making Bore-Holes of 150mm to 250mm
dia. by any standard method to any depth below
ground level / bed level in all kinds of soil like clay, ,
silt, sand, stiff clay, mixed soils etc. except rocks (for
the purpose of collecting Disturbed & Un disturbed
soil samples, conducting Standard Penetration Test
at suitable intervals etc.) including preparation and
submission of bore-log as per IRC : 75 and 78 and
Clause 2400 of Specifications for Road & Bridge
Works (5th Revision), Published by IRC, and also
including hire charges of tools and plants complete
as per the direction of Engineer-in-Charge.
a) When Casing pipe is used to prevent collapse of
bore hole (casing pipe to be finally withdrawn) Depth 0.00 m to 10.00 m | - | Mtr | 340 | - |
| 3 | Labour for making Bore-Holes of 150mm to 250mm
dia. by any standard method to any depth below
ground level / bed level in all kinds of soil like clay, ,
silt, sand, stiff clay, mixed soils etc. except rocks (for
the purpose of collecting Disturbed & Un disturbed
soil samples, conducting Standard Penetration Test
at suitable intervals etc.) including preparation and
submission of bore-log as per IRC : 75 and 78 and
Clause 2400 of Specifications for Road & Bridge
Works (5th Revision), Published by IRC, and also
including hire charges of tools and plants complete
as per the direction of Engineer-in-Charge.
a) When Casing pipe is used to prevent collapse of
bore hole (casing pipe to be finally withdrawn) Depth greater than 10m and upto 20m | - | Mtr | 400 | - |
| 4 | Labour for making Bore-Holes of 150mm to 250mm
dia. by any standard method to any depth below
ground level / bed level in all kinds of soil like clay, ,
silt, sand, stiff clay, mixed soils etc. except rocks (for
the purpose of collecting Disturbed & Un disturbed
soil samples, conducting Standard Penetration Test
at suitable intervals etc.) including preparation and
submission of bore-log as per IRC : 75 and 78 and
Clause 2400 of Specifications for Road & Bridge
Works (5th Revision), Published by IRC, and also
including hire charges of tools and plants complete
as per the direction of Engineer-in-Charge.
a) When Casing pipe is used to prevent collapse of
bore hole (casing pipe to be finally withdrawn) Depth greater than 20 m and upto 30 m | - | Mtr | 470 | - |
| 5 | Labour for making Bore-Holes of 150mm to 250mm
dia. by any standard method to any depth below
ground level / bed level in all kinds of soil like clay, ,
silt, sand, stiff clay, mixed soils etc. except rocks (for
the purpose of collecting Disturbed & Un disturbed
soil samples, conducting Standard Penetration Test
at suitable intervals etc.) including preparation and
submission of bore-log as per IRC : 75 and 78 and
Clause 2400 of Specifications for Road & Bridge
Works (5th Revision), Published by IRC, and also
including hire charges of tools and plants complete
as per the direction of Engineer-in-Charge.
a) When Casing pipe is used to prevent collapse of
bore hole (casing pipe to be finally withdrawn) Depth greater than 30 m and upto 40 m | - | Mtr | 550 | - |
| 6 | Labour for making Bore-Holes of 150mm to 250mm
dia. by any standard method to any depth below
ground level / bed level in all kinds of soil like clay, ,
silt, sand, stiff clay, mixed soils etc. except rocks (for
the purpose of collecting Disturbed & Un disturbed
soil samples, conducting Standard Penetration Test
at suitable intervals etc.) including preparation and
submission of bore-log as per IRC : 75 and 78 and
Clause 2400 of Specifications for Road & Bridge
Works (5th Revision), Published by IRC, and also
including hire charges of tools and plants complete
as per the direction of Engineer-in-Charge.
a) When Casing pipe is used to prevent collapse of
bore hole (casing pipe to be finally withdrawn) Depth greater than 40 m and upto 50 m | - | Mtr | 650 | - |
| 7 | Labour for making Bore-Holes of 150mm to 250mm
dia. by any standard method to any depth below
ground level / bed level in all kinds of soil like clay, ,
silt, sand, stiff clay, mixed soils etc. except rocks (for
the purpose of collecting Disturbed & Un disturbed
soil samples, conducting Standard Penetration Test
at suitable intervals etc.) including preparation and
submission of bore-log as per IRC : 75 and 78 and
Clause 2400 of Specifications for Road & Bridge
Works (5th Revision), Published by IRC, and also
including hire charges of tools and plants complete
as per the direction of Engineer-in-Charge.
b) When drilling mud “Bentonite of suitable
consistency” is used to prevent collapse of bore
hole. Depth greater than 0.00 m and upto 10.00 m | - | Mtr | 290 | - |
| 8 | Labour for making Bore-Holes of 150mm to 250mm
dia. by any standard method to any depth below
ground level / bed level in all kinds of soil like clay, ,
silt, sand, stiff clay, mixed soils etc. except rocks (for
the purpose of collecting Disturbed & Un disturbed
soil samples, conducting Standard Penetration Test
at suitable intervals etc.) including preparation and
submission of bore-log as per IRC : 75 and 78 and
Clause 2400 of Specifications for Road & Bridge
Works (5th Revision), Published by IRC, and also
including hire charges of tools and plants complete
as per the direction of Engineer-in-Charge.
b) When drilling mud “Bentonite of suitable
consistency” is used to prevent collapse of bore
hole. Depth greater than 10 m and upto 20 m | - | Mtr | 350 | - |
| 9 | Labour for making Bore-Holes of 150mm to 250mm
dia. by any standard method to any depth below
ground level / bed level in all kinds of soil like clay, ,
silt, sand, stiff clay, mixed soils etc. except rocks (for
the purpose of collecting Disturbed & Un disturbed
soil samples, conducting Standard Penetration Test
at suitable intervals etc.) including preparation and
submission of bore-log as per IRC : 75 and 78 and
Clause 2400 of Specifications for Road & Bridge
Works (5th Revision), Published by IRC, and also
including hire charges of tools and plants complete
as per the direction of Engineer-in-Charge.
b) When drilling mud “Bentonite of suitable
consistency” is used to prevent collapse of bore
hole. Depth greater than 20 m and upto 30 m | - | Mtr | 420 | - |
| 10 | Labour for making Bore-Holes of 150mm to 250mm
dia. by any standard method to any depth below
ground level / bed level in all kinds of soil like clay, ,
silt, sand, stiff clay, mixed soils etc. except rocks (for
the purpose of collecting Disturbed & Un disturbed
soil samples, conducting Standard Penetration Test
at suitable intervals etc.) including preparation and
submission of bore-log as per IRC : 75 and 78 and
Clause 2400 of Specifications for Road & Bridge
Works (5th Revision), Published by IRC, and also
including hire charges of tools and plants complete
as per the direction of Engineer-in-Charge.
b) When drilling mud “Bentonite of suitable
consistency” is used to prevent collapse of bore
hole. Depth greater than 30 m and upto 40 m | - | Mtr | 470 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.10 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
Tendernotice_2.pdf
PDF • 1.27 MB
Tendernotice_3.pdf
PDF • 0.63 MB
BOQ_5082403.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .