Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.6 LAccepted-AOC | 1 | Accepted-AOC Rates are on lowest side | |
| 2 | 2₹2.6 L+₹5,120 (2.00%)Rejected-Finance SHOP 16 NEW AANAJ MANDI BARWALA 125121 | BARWALA | HISAR | HARYANA | 125121 | 2 | Rejected-Finance Rates are on lowest side as compare to L1 | |
| 3 | 3₹3.5 L+₹95,432 (37.3%)Rejected-Finance NEAR WATER WORKS 16 BAYANA KHERA HISAR 125121 | HISAR | HISAR | HARYANA | 125121 | 3 | Rejected-Finance Rates are on lowest side as compare to L1 |
| Sl No | Description | Qty | Unit | The Arnav Punia Cooperative Labour And Construction Society Limited L3 | THE BARBARIK CO-OP L&C SOCIETY LTD. L2 | SEEMA CONTRACTOR L1 |
|---|---|---|---|---|---|---|
| 1.10 | All Pumping set install at water works, Boosting station, Including of Pumps and Motor of various capacity including all electric fitting , Panel Board, starter,Cable, Volt Meter, Ampmeter etc. inside/outside Campus complete in all respects (August 2025 to March 2026 = Total 8 Months) | 8 | Per Month | 14,643 ₹1,17,144 | 10,880 ₹87,040 Lowest | 12,000 ₹96,000 |
| 1.20 | Comprehensive Maintenance and repair of existing distribution as well as head work pipelines of all types (DI/CI/AC/PVC) removal and relaying IPB, including IPB block if required, demolising C/C by Mechnical /Manual and all sizes at various depths, including new sluice valves, new non-return valves, leakages and repair of illegal/not functional Water supply connections. Work includes excavation on any surface, bailing out, refilling i.e. Soil etc. material and labour cost, machine/equipment hire Including cost and repair/replacement of new Sluice valves components of all sizes (M.S. spindle, G.M. chuck nut and CI special, nut bolts, rubber jain, glain dori, grease, etc.). Includes opening/fitting, carriage charges from site to workshop and back at site and all repair related works as per Engineer-in-Charge`s direction, complete in all respects. (August 2025 to March 2026 = Total 8 Months) | 8 | Per Month | 14,643 ₹1,17,144 | 10,880 ₹87,040 | 10,000 ₹80,000 Lowest |
| 1.30 | Provision for Consumeables Items i.e. Bush , cotton, Glain Dori, Grease, Lubricant oil, Mobil oil, Nut and Bolt, Rubber Sheet, Transformer Oil etc.(August 2025 to March 2026 = Total 8 Months) | 8 | Per Month | 14,643 ₹1,17,144 | 10,880 ₹87,040 | 10,000 ₹80,000 Lowest |
Tender Value
₹3.2 L
EMD Value
₹6,390
Closing Date
6 Aug 2025, 3:00 pmClosed
SHASHIKANT
Hisar PHED No. 2
Repair of Civil Structure,Pumping Machinery,Leakages of Pipe line and Consumeable etc.
2025_HRY_462081_1
2025708EF38A E250 4D6E 8988 3DE4BFBF231D565PUH
Open Tender
Civil Works
Works
250 days
KHARAK PUNIA
As per DNIT
3 documents required · 3 mandatory
₹500
₹6,390
Yes
30 Sept 2025
30 Jul 2025
6 Aug 2025
30 Jul 2025
6 Aug 2025
30 Jul 2025
Amount
All Pumping set install at water works, Boosting station, Including of Pumps and Motor of various capacity including all electric fitting , Panel Board, starter,Cable, Volt Meter, Ampmeter etc. inside/outside Campus complete in all respects (August 2025 to March 2026 = Total 8 Months)
Comprehensive Maintenance and repair of existing distribution as well as head work pipelines of all types (DI/CI/AC/PVC) removal and relaying IPB, including IPB block if required, demolising C/C by Mechnical /Manual and all sizes at various depths, including new sluice valves, new non-return valves, leakages and repair of illegal/not functional Water supply connections. Work includes excavation on any surface, bailing out, refilling i.e. Soil etc. material and labour cost, machine/equipment hire Including cost and repair/replacement of new Sluice valves components of all sizes (M.S. spindle, G.M. chuck nut and CI special, nut bolts, rubber jain, glain dori, grease, etc.). Includes opening/fitting, carriage charges from site to workshop and back at site and all repair related works as per Engineer-in-Charge`s direction, complete in all respects. (August 2025 to March 2026 = Total 8 Months)
Provision for Consumeables Items i.e. Bush , cotton, Glain Dori, Grease, Lubricant oil, Mobil oil, Nut and Bolt, Rubber Sheet, Transformer Oil etc.(August 2025 to March 2026 = Total 8 Months)
THE BARBARIK CO-OP L&C SOCIETY LTD. (BID ID -1311386)
The Arnav Punia Cooperative Labour And Construction Society Limited (BID ID -1311566)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .