| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92,300Accepted-Finance GOPALPUR BANSI RANIGANJ DISTRICT PRATAPGARH | PRATAPGARH | UTTAR PRADESH | ₹92,300 | L1 | Accepted-Finance First lowest |
| 2 | L2₹1.1 LAccepted-Finance 1 RAKSHA PUNAVALI ROAD JHANSI JHANSI UTTAR PRADESH 284419 UDYAM UP 39 0038072 | JHANSI | UTTAR PRADESH | 284419 | ₹1.1 L | L2 | Accepted-Finance Second lowest |
| 3 | L3₹1.2 LAccepted-Finance | ₹1.2 L | L3 | Accepted-Finance Third lowest |
| Sl No | Description | Qty | Unit | M/S New Sharma Electricals L3 | MAA BARAHI CONSTRUCTION L1 | B.R. ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.01 | Following works are required for Pre-summer maintenance of Marshalling box for smooth operation of 40MVA T/F-II installed at 132KV S/S Manjhanpur under ETD-IV, prayagraj. Providing and fixing of single phase preventer in both group of fan of 40MVA T/F-II (M/s TAL make) made of L&T/minilac make including cost of all required material with T&P, labour up to completion of work satisfactorily. | 2 | Job | 6,500 ₹13,000 | 5,400 ₹10,800 | 6,000 ₹12,000 |
| 1.02 | Replacement of defective 01 no main switch having 3P/1W, 415V, 16A rating and 01 no MCB of 4 pole, 415 V 16A rating for 3 phase incoming power supply for cooling fans of 40MVA T/F including the cost of all material which will be provided by contractor on their own cost & risk. | 1 | Job | 13,000 ₹13,000 | 10,900 ₹10,900 | 12,000 ₹12,000 |
| 1.03 | Replacement of defective 03 no, 10 A, 3P, 2NO+2NC power contactor having coil voltage230V AC (M/s C&S/TC make) for main supply of cooling fans installed on 40 MVA T/F-II work includes proper connection of contactor with AC cubical installed in the switchyard including the cost of all material which will be provided by contractor on their own cost & risk. | 3 | Job | 6,500 ₹19,500 | 5,900 ₹17,700 | 6,500 ₹19,500 |
| 1.04 | Replacement of defective 02 no fan control contactors of rating 415V, 25A, 3Pwith additional 02No NC contact (M/s C&S/siemens,model-TC1-D09-10) supply monitoring for cooling fans including the cost of all material which will be provided by contractor on their own cost & risk.. | 2 | Job | 6,500 ₹13,000 | 5,900 ₹11,800 | 6,500 ₹13,000 |
| 1.05 | Replacement of defective 05 no overload relay of rating (0.5-5A), 3P,1NO+INC for cooling fan of transformer on the front side of the marshalling box including the cost of all material which will be provided by contractor on their own cost & risk. | 5 | Job | 5,000 ₹25,000 | 3,900 ₹19,500 | 5,000 ₹25,000 |
| 1.06 | Supply and fixing Time delay relay having delay timing 0-60sec suitable for 230V for 40MVA T/F-II including the cost of all material which will be provided by contractor on their own cost & risk. | 2 | Job | 6,500 ₹13,000 | 5,900 ₹11,800 | 6,500 ₹13,000 |
| 2.00 | Complete repairing and complete overhauling of 3HP, 230Volt, 1500 RPM, 50 Hz cooling fans of 40 MVA T/F-I, II & 63 MVA T/F installed at 132 kV S/S Manjhanpur, Kaushambi. This job includes disconnection of supply cable and dismantling from fan mounting frame then shifting the fan to workshop and replacement the defective motor/ shaft bearing by suitable size & good quality super enamelled material for straightening of motor shaft and replacement of worn-out parts including lubricating of entire moving parts of cooling fan. Checking of adjustment of all Gaps. Shifting of motor to site, refitting in T/F fan mounting frame, making proper connection and checking the performance of fan up to 2 hrs after connecting proper supply. | 20 | Nos | 950 ₹19,000 | 490 ₹9,800 | 800 ₹16,000 |
Tender Value
₹1.1 L
EMD Value
₹1,500
Closing Date
18 Feb 2026, 12:00 pmClosed
Executive Engineer
57 George Town, Prayagraj
For repairing of marshaling box replacement of defective relays contactors along with overhauling of TF cooling fan of 40MVA-II Transformer at 132KV Ss Manjhanpur Kaushambi
2026_UPTCL_1114841_1
19-ETD-IV(P)/2025-2026
Open Tender
Electrical Works
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer ETD IV Prayagraj
₹1,500
20 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
Following works are required for Pre-summer maintenance of Marshalling box for smooth operation of 40MVA T/F-II installed at 132KV S/S Manjhanpur under ETD-IV, prayagraj. Providing and fixing of single phase preventer in both group of fan of 40MVA T/F-II (M/s TAL make) made of L&T/minilac make including cost of all required material with T&P, labour up to completion of work satisfactorily.
Replacement of defective 01 no main switch having 3P/1W, 415V, 16A rating and 01 no MCB of 4 pole, 415 V 16A rating for 3 phase incoming power supply for cooling fans of 40MVA T/F including the cost of all material which will be provided by contractor on their own cost & risk.
Replacement of defective 03 no, 10 A, 3P, 2NO+2NC power contactor having coil voltage230V AC (M/s C&S/TC make) for main supply of cooling fans installed on 40 MVA T/F-II work includes proper connection of contactor with AC cubical installed in the switchyard including the cost of all material which will be provided by contractor on their own cost & risk.
Replacement of defective 02 no fan control contactors of rating 415V, 25A, 3Pwith additional 02No NC contact (M/s C&S/siemens,model-TC1-D09-10) supply monitoring for cooling fans including the cost of all material which will be provided by contractor on their own cost & risk..
Replacement of defective 05 no overload relay of rating (0.5-5A), 3P,1NO+INC for cooling fan of transformer on the front side of the marshalling box including the cost of all material which will be provided by contractor on their own cost & risk.
Supply and fixing Time delay relay having delay timing 0-60sec suitable for 230V for 40MVA T/F-II including the cost of all material which will be provided by contractor on their own cost & risk.
Complete repairing and complete overhauling of 3HP, 230Volt, 1500 RPM, 50 Hz cooling fans of 40 MVA T/F-I, II & 63 MVA T/F installed at 132 kV S/S Manjhanpur, Kaushambi. This job includes disconnection of supply cable and dismantling from fan mounting frame then shifting the fan to workshop and replacement the defective motor/ shaft bearing by suitable size & good quality super enamelled material for straightening of motor shaft and replacement of worn-out parts including lubricating of entire moving parts of cooling fan. Checking of adjustment of all Gaps. Shifting of motor to site, refitting in T/F fan mounting frame, making proper connection and checking the performance of fan up to 2 hrs after connecting proper supply.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
TD.pdf
Tender Documents • 0.34 MB
BOQ_2067906.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid