Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹11.1 L
EMD Value
₹22,500
Closing Date
26 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GE AF NAL
GE AF NAL
As mentioned and described in BOQ
2026_MES_797493_1
GE (AF) NAL/T-79/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE AF NAL
As per NIT and tender documents class E and above and category a (i)
9 documents required · 9 mandatory
₹500
GE AF NAL
₹22,500
Yes
5 Nov 2026
5 Nov 2026
28 Nov 2026
5 Nov 2026
26 Nov 2026
19 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation in soft/ loose soil not exceeding 30 cm deep and averaging 15 cm deep and getting out complete all as specified and directed. | 86 | Sqm | 10 | ₹860 |
| 2 | Excavation in trenches n.exc 1.5 m wide and n.exc 1.5 m in depth for foundation,etc or for shafts wells, cesspits, manholes, pier holes etc n.exc 10 sqm on plan and n.exc 1.5 m in depth and getting out in hard/dense soil complete all as specified and directed. | 39 | Cum | 1.25 | ₹48.75 |
| 3 | Returning, filling in soft/loose soil, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick, complete all as specified and directed. | 22.28 | Cum | - | - |
| 4 | Removing excavated material to a distance exc. 50 metre but not exceeding 100 metre and depositing where directed at a level not exceeding 1.5 Metre above starting point, complete all as specified and directed. | 35.98 | Cum | 22 | ₹791.56 |
| 5 | M&L for plain cement concrete 1:4:8 type D2 using 40mm graded aggregate as in foundation complete all as specified and directed. | 1.43 | Cum | 10 | ₹14.3 |
| 6 | M & L for Formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter rough finished surface of concrete complete all as specified and directed. | 38 | Sqm | 1.25 | ₹47.5 |
| 7 | M&L for Formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work; not exceeding 200mm thick (Horizontal or sloping) complete all as specified and directed. | 41 | Sqm | 10 | ₹410 |
| 8 | Formwork to sides and soffits of floor or roof beams, beam haunchings, girders, bressummers,
lintels, cantilevers, shelves including sup- ports, overhangs, etc. also splays between floors and beams, etc.complete all as specified and directed. | 10 | Sqm | 10 | ₹100 |
| 9 | M & L for Mild steel TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and incl mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed. | 1,750 | Kg | 10 | ₹17,500 |
| 10 | M & L for Mild steel TMT bars 6mm to 8 mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and incl mild steel wire (annealed) not less than 0.9mm dia or securing with clips for stirrups, spacer and binder complete all as specified and directed. | 220 | Kg | 1.25 | ₹275 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_894573.xls
BOQ • 1.20 MB
TENDER_T79.pdf
Tender Documents • 1.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .