Loading…
Loading…
Tender Value
₹98.7 Cr
EMD Value
₹50.8 L
Closing Date
29 Jul 2025, 2:30 pmClosed
Construction of 31 units(Type-II) and 155 units(Type-III) quarters, labour and merchant rooms, precast yard drain (at DPRA,SNCA,BOKO,BMGN,CGON stations), boundary wall, road works and other miscellaneous works from NBQ to AZA via GLPT in connection with doubling project N.F. Railway.
CE-CON-NK-MIS-2025-04
CE-CON-NK-MIS-2025-04
Open
18 Months
Kamrup, Assam
₹0
₹50.8 L
27 Jun 2025
27 Jun 2025
works of NFUSSOR-2021.
Annexure-II and any other Items of works of NFUSSOR-2021 required for successful completion of
S No. Item No Description of Item Unit Qty Rate Amount
blanketing material by using only
hard and durable stone crushed in
mechanical crusher to different
gradations, wet mixing of the
same in designed proportion in
Pug mill or wet mix plant to have
uniform gradation including all
incidental transportation, laying
over finished formation in uniform
layer(s) with motor grader,
compaction with suitable vibratory
roller to specified density and
finishing to correct profile,
complete as per RDSO
Specification No. RDSO/2020/GE:
IRS-0004 with latest correction
slips. Note: This item shall be used
only when entire constituent of
blanketing material is
mechanically manufactured by
crushing of hard and durable
stone into desired gradation of
designed proportion.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
Supplying, laying Non-woven
Needle Punched and Mechanically
or Thermally bonded type
Geotextile for use as
Separator/Filtration for Railway
formation as per RDSO
Specification No.
RDSO/2018/GE:IRS-0004 - Part I
made of Polypropylene /
Polyethylene / Polyamide or
combination there of having
apparent opening size of less than
or equal to 85 microns and
elongation at failure more than
50% in both directions including
transportation labour, lead & lift
complete as directed by Engineer
subgrade before laying blanketing
layer with minimum strengths in
Grab test, Trapezoidal Tear test
and Puncture test of 700N, 250 N
and 1800 N respectively.
Exploratory drilling of boreholes
down to required depth, drilling of
150mm dia. boreholes in all type
of soils except hard rock & large
boulders (boulder core more than
30cm) including refilling,
reinstating surface and disposing
off surplus material including use
of mechanical rigs with power
operated winches as well as
percussion/chiselling tool for
advancing through occasional
seams of hard strata to be
employed, where necessary in Dry
platform to drill bore hole through
flowing/standing water through
river bed up to water depth of
1.5m, and dismantling after
completing work and removing
from the site to clear the water
Conducting in-situ full size Plate
Load Test (PLT) at selected
location as per IS:1888 including
making loading arrangements &
casting of RCC/cast in-situ
concrete footing as per codal
provisions including excavation
and refilling of trial pit.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
long undisturbed samples of soil
from bore holes, including
provision of air tight containers for
packing and, labeling incl.
transporting the samples to
laboratory. Piston sampler shall be
used for extracting undisturbed
samples where necessary.
Samples shall be collected as per
Conducting laboratory Tests on
collected soil samples as per
relevant IS code
Hydrometer analysis
Pulling & positioning of rails
accurately on cess including
supporting rails, providing
required gap and squaring at ends
for renewal preparation, as
directed by Engineer in-charge.
Re-spacing of existing PSC
sleepers for Increasing Sleeper
Density (ISD) work in track after
marking of sleeper spacing as per
required sleeper density, including
fixing all fastenings and initial
packing and all associated work
required to complete the work, as
directed. Note: Insertion of new
sleeper will be paid extra under
17 062021 For location of work not involving TRM 1600.00 186.69 298704.00
Fixing of fish plates with fish bolts
on a joint of all rail sections duly
lubricating fish plates/bolts with
contractor's grease graphite in
running track condition including
transportation of fish plates and
fish bolts from nearest station /
store / level crossing. Note: Rail
cutting & drilling to be paid
Lubrication of fish plated rail joints
under traffic, by using Grease
Graphite Grade 'O' (IS:408) and
Black oil supplied by contractor,
for all types of rail sections as per
procedure laid down in latest
version of IRPWM and as directed
by Engineer In charge. Note:
Release U/S bolt & nuts is to be
deposited back. If any fish bolts is
jammed it should be cut with
chisel and hammer and replaced
with fresh fish bolt supplied.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
20 063070 Lubrication of Elastic Rail Clips on ERC 11000.00 4.49 49390.00
PSC sleepers with contractor's
grease, conforming to Railway's
specifications, labour etc.
c o m p l e t e as per procedure
prescribed in latest edition of
on curves, cross overs, points &
crossings, turn-in curves and at
locations as required with
contractor's grease graphite grade
"O" IS 408 and as directed.
Lubrication of Plate/Rail screws of
Points and crossings, SEJs,
Bridges, Curves etc., with greases
graphite, including removal of
screws carefully without
damaging sleepers, cleaning with
wire brush etc., both screws and
dowel hole, applying grease
graphite, refixing the screw and
sealing the top and sides of screw
with grease graphite to prevent
ingress of moisture and corrosion
with contractors labour, tools,
consumables under traffic
condition all lead and lift
Cutting / cropping of rail of 60Kg -
90 UTS, manually and perfectly
vertical with contractor's labour,
hacksaw blade and tools & plants -
Note: 1.Manual cutting should be
used only in emergencies with
prior permission of sectional ADEN
where machine cutting can not be
arranged in time. 2. Cutting of
Rails with blade and forcing to
part by using other means to
break the rails is prohibited.
3.Rails should be cut right through
hacksaw blades only.
Gas cutting of rail of various
sections with contractor's tools &
plants, as directed by engineer in-
25 083030 Boxing and profiling of ballast as TRM 1600.00 29.56 47296.00
per procedure prescribed in latest
edition of IRPWM including cess
dressing on both sides of track.
The work will include removing
excess ballast from track and
putting the same in crib and
shoulder by leading to a
maximum of 50m including
crossing of track, deweeding on
ballast section etc and as directed
by Engineer-In charge.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
Unloading of ballast from
Railway's Hopper Wagons,
quantity distribution as per pre-
defined site requirement, clearing
infringements/jammed ballast,
distributing the unloaded ballast
uniformly over the track, profiling
and boxing following all
prescribed safety norms.
Manufacturing, supply and
stacking of machine crushed Track
Ballast conforming to RDSO
Specification (IRS-GE-1) with
latest correction slips at Railway
depot or nominated location.
Note: Distance of nearest quarry
mentioned in each sub-item is
only for the purpose of selecting
the items for preparation of
estimates/tender schedule, based
on the minimum distance between
nearest quarry and centre of
supply points and will not affect
the selection of quarry during
physical supply in any way till
prescribed specification is met
is more than 50 km and up to 100
Manufacturing and Supply of
Alumino thermic welding portions
of 52Kg/60 Kg/60EI-R260 as
approved by RDSO for welding of
rails 52Kg/60Kg/60EI-R260 kg for
25mm gap by the process of AT
welding along with complete
accessories confirming to the
specification laid down in Indian
Railway Standard specification
No.IRST-19-2020 up to date
correction slips with Single shot
crucible fitted with Automatic
Tapping Thimble, 3 pieces pre
fabricated mould (Zircon washed)
manually pressed using
compressed air petrol/LPG pre
heating for execution of welding
of rail joint as directed by the
engineer in charge at site. Note: 1.
The accessories along with
welding portion shall be supplied
as per Annexure-I of the IRUSSOR
- 2021. 2. Rate is inclusive of
transportation of above to
SSE/P.Way stores.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
25mm gap 'in-situ' welding during
traffic block using Railway's
welding portion and finishing of
weld to meet the prescribed
tolerances and pass all stipulated
tests with all required labour,
materials, consumables, tools,
equipments etc. to complete the
work in all respect as per IR's
"Manual for Fusion Welding of
Rails by Alumino - Thermic
Process" with latest correction
slips, including marking of welded
j o i n t , painting weld collar with
anticorrosive paint, restoration of
track near weld joint to original
position and fixing of joggled fish
plate at new weld, to be removed
after passing of weld in USFD test
as directed by Engineer in charge.
Note: 1. Welding portion and
related accessories as per
Annexure - I shall be supplied by
Railways. All other items required
shall be supplied by the
Contractor. 2. Welding shall be
carried out only by trained welder
having valid competency
certificate. 3. Hydraulic Weld
trimmer shall be used for chipping
and profile Grinder for finishing. 4.
Required nos. of Joggled fish
plates shall be supplied by
Railway at nearest P. Way Stores
and the same shall be returned at
nearest P. Way Store or at other
location as per direction of
Engineer-in-Charge after release
Single shot crucible fitted with
Automatic Tapping Thimble
Technology, 3 pieces Mould
(Zircon washed) and Compressed
Air Petrol heating technique.
30 121010 Dismantling of existing LWR/SWR TRM 1600.00 210.69 337104.00
track of any structure, removing
rails, sleepers, fish plates, cutting
of rails, segregation and stacking
of released Rails, Sleepers and
fitting at nominated location in
countable manner within a free
lead of 500m, levelling of ballast
to correct profile for laying new
track over it, all as per direction of
Engineer-in-Charge.
Shifting & pairing of rails / panels
unloaded alongside existing
running track to adjoining
formation of a new line including
crossing of one track, duly lifting &
pushing rail / panel without
damaging it and taking all
necessary precautions, so as not
to infringe the running track, as
directed by Engineer in-charge.
Note: The rail barricading, if
disturbed during working, should
be restored to its original
condition by the agency including
re-fixing & concreting as required.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
and up to 40m length - Under
32 123020 Installation of reference points for Each 100.00 836.59 83659.00
track centre line in main and loop
lines, in straight or curve portion,
SRJ for turnouts, heel of crossing
(HOC), locations of derailing
switches, switch expansion joints
etc. away from formation on firm
ground at known offset with MS
Angles of 50mmx50mmx5mm
thick of length 1.80 m each,
founded in concrete block of size
30cm x 30cm x 45cm of nominal
mix 1:3:6, including painting to
reference pegs with two coats of
enamel paints on exposed
surface, as directed by Engineer In
charge. Note: Earth work and
Cement concrete will be paid
under relevant items.
33 123030 Spreading of ballast, from existing cum 2000.00 44.50 89000.00
stacks available along formation
on top or at cess, in required
uniform thickness, compaction of
ballast layer laid on new
formation at all the locations with
smooth wheeled power roller of 8-
10 tonne capacity to sufficient
number of passes to form
consolidated ballast bed of
approximately 250mm thickness
to a width of 4m symmetrical to
centre line of proposed track in
correct line & level with all
ascents & descents, as directed
by Engineer in-charge. Note: Item
is inclusive of (a) providing ramp
for taking roller to formation and
removing the same & making
good formation after completion
of work; (b) redistribution &
leveling of excess ballast while
rolling to obtain uniform plane
cambered surface.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
Linking of BG track (except at LC,
Bridges and SEJs) with any type of
rail section and sleeper of
specified density, on ballast bed
spread and compacted with
suitable roller, over prepared
formation including leading free
rails/welded panels available
along the alignment on to
formation, leading and spreading
all fittings and fastenings,
spreading of sleepers at specified
spacing, squaring, placing of rails
over sleepers and fixing rails to
sleepers with all types of fittings
and fastenings to correct gauge &
alignment, lubrication of fittings
and fastenings with contractor's
grease as per IRPWM standards
with contractors labour, tools,
consumables, with all lead, lifts
etc. complete and raising,
levelling and initial packing of
track to make it fit for 30 kmph
and meet other prerequisites
prescribed in Indian Railway Track
Machine Manual for deployment of
Tamping Machine. N o t e : 1.Rail
cutting and Hole drilling shall be
paid separately. 2.Spreading of
ballast and compaction shall be
paid separately under relevant
sleepers per km
Shifting / Slewing the existing or
newly assembled track of any rail
section with any type of sleepers
and any density under line block
to correct locations & alignment
and attending to one round kutcha
packing to run safely at 20KMPH
speed with all contractors tools
and consumables complete and as
directed by Engineer in-charge.
more than 1 metre & up to 2
Providing Caution Watchman at a
location where caution order is
imposed and ensuring to be on
continuous vigil and exhibit
necessary hand signals to the
trains for their passage over
caution spot. Note: 1) Prescribed
protection equipment shall be
supplied by Railways and the
same shall be returned after work
is over. 2) If Contractor fails to
post watchman at any time during
one day, penalty at double the
accepted rates will be levied and
3) The watchman nominated by
the contractor will be screened for
suitability as per Railway norms.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
Through packing of track, as per
procedure prescribed in latest
edition of Indian Railways
Permanent Way Manual
Sleeper Density of 1540
Sleepers/Km or more
First or Second Through Packing
o f track of all sleeper density
including giving a general lift, as
desired to eliminate sag after
Deep Screening work, lifting of
track, lowering of track and major
realignment of curves and
formation rehabilitation as per
procedure prescribed in latest
edition of IRPWM. Note: General
lift is normally 25 mm and
isolated lift may be up to 50 mm.
Sleeper Density of 1660
Third or subsequent Through
Packing of track for all sleeper
density including picking of slacks,
as required after second through
packing, subsequent to Deep
Screening work as per procedure
prescribed in latest edition of
IRPWM. This item can also be
lifting/regrading/realignment
works also. Note: General lift is
normally 25 mm and isolated lift
may be up to 50 mm.
Sleeper Density of 1660
Through packing of points and
crossings, derailing switches
including gauging, fittings
recoupment, ballasting as
required, elimination of sag and to
the required alignment after Deep
Screening as per procedure
prescribed in latest edition of
IRPWM complete as per direction
of Engineer-in-charge. Note: This
work shall be operated in
exceptional cases with written
approval at DEN level when
UNIMAT is not available and
immediate packing is required to
pass train over it.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
De-stressing of LWR/CWR track of
any density under traffic line
block with contractor's labours,
tools, equipments and
consumables inclusive of all lead
& lift. Activities include cutting of
LWR/CWR into convenient panels
of specified length, removal of
ERCs, liners, greasing of ERCs and
liner contact area, lifting rails and
keeping them on rollers provided
at every 15 sleepers, working out
elongation of rail ends depending
on prevailing site conditions,
pulling rails with the help of
Hydraulic Tensor to achieve the
desired elongation, cutting rails,
as required, removing rollers and
placing rail in position, re-fixing
ERCs & liners and adjustment of
gap at SEJs : Note: (1) Welding of
rail joints will be paid separately.
(2) Rail cutting and Hole drilling
shall be paid separately. (3)
Opening and closing of LC if
required will be paid separately.
(4) As per procedure prescribed in
latest edition of IRPWM & CE's
Circulars for destressing of
LWR/CWR, if any.
Fixing Joggled Fish Plates with bolt
/ clamp (supplied by Railway from
nearest SSE Store) in running
track conditions at welds on rail,
as directed by engineer in-charge
(drilling of holes in rail, if required,
shall be paid separately).
track including disposing of muck
beyond Railway boundary as per
instructions of Engineer in-charge
to keep drains clean and clear in
Anti-corrosive painting of rail on
running track of any sleeper
density on web, foot etc. including
liner contact area (excluding
bottom of foot) and fishing plane
as per requirement with two coats
o f thickness of 100 microns each
by bituminous black paint
confirms to IS-9862 of reputed
make including painting of liners,
ERCs and including surface
preparation, as a complete job as
per procedure prescribed in latest
edition of IRPWM Note: 60% of
payment shall be made if painting
on only gauge face side is done.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
Carrying out Through USFD
testing of running rails & welds
(excluding flange testing)
in c lu d in g level crossings, lead
portion of points and crossings
and scabbed rail testing of all
types of rails by NBC (Need Based
Concept) method under traffic
conditions as per provisions of IR's
"USFD Manual & Specifications for
Ultrasonic Testing of Rails and
Welds" with latest correction slips
& related instructions, duly
marking defects, submission of
daily reports and storing back-up
data, as specified & directed.
N o t e : The SRT/DRT machine
should have minimum of 9 probes
(including 370 forward /backward
probe for detecting bolt hole
including related T&P and probes
service rails of all types by
removing existing running rails,
already cut into free rails / rail
panels for making auxiliary track,
including attending alignment,
cross level, gauging, packing;
wherever required including
crossing of track, as directed.
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
Carrying out pre-tamping, during
tamping and post-tamping work
for tamping track with all types of
rails, sleepers & sleeper density
by various Track Tamping
machines, like CSM,DUO/3X
Machines which include : (1) Re-
adjustment of ballast, heaping-up
of ballast, filling-up of cavities in
tamping zone by picking ballast
from stacks / shoulders / crib of
adjoining track up to lead of 50 m
to ensure effective packing; (2)
Clearing of ballast on sleepers to
make them visible to operator, (3)
Clearing of ballast over rail foot to
facilitate holding of rail by rollers
of TTRM; (4) Digging, screening
and replenishment of ballast at
mud pumping / rounded ballast in
sleeper crib location; (5)
Tightening of loose fittings
immediately before & after
tamping; (6) Replacement of
broken / missing fittings supplied
by Railway; (7) Correcting
displaced sleepers to position
along with squaring; (8) Re-setting
of worked-out / fallen fittings. (9)
Removing and re-fixing joggled
fish plates & wooden blocks,
wherever necessary; (10) Manual
consolidation of ballast in crib /
shoulders; (11) Removing and
refixing of traction bonds during
the block in electrified sections
(12) Dressing of ballast Note: 1.
Tamping blocks are not identical &
it may be given at any time either
during day or night. 2. Stages of
payment a) 30% of the rate will be
paid on completion of pre tamping
attention, b) Balance 70% of the
rate will be paid on completion of
post tamping. 3. Recovery at the
rate of twice the above applicable
rate will be effected in case
contractor fails to carry out
pre/during/post operation.
4.Payment shall be made only
once in irrespective of numbers of
TTRM packing round and after
restoration of normal speed and
restoration of complete ballast
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
Quick cutting with abrasive rail
cutter of all types of rail sections
including wear resistant, head
hardened rails up to 110 UTS, with
contractors tools & plants,
equipment, consumable with all
lead & lift etc. complete as
directed by Engineer in-charge.
Abrasive Rail Cutter will be as per
RDSO Specification No. TM/SM/1
(Rev. 01 of 2012) with latest
status of RDSO; Rail Cutting
Wheel Abrasive Disc will be as per
RDSO Specification No.TM/SM/2
Drilling holes of 16 mm to 32 mm
dia. with Rail Drilling machine
including chamfering with
appropriate chamfering tools in all
types of rail section with
contractor's tools & plants,
equipment, consumable with all
lead & lift etc. complete, as
directed by Engineer in-charge.
Rail Drilling Machine will be as per
RDSO Specification No. TM/SM/3,
Loading of rails of any section and
length up to 13 metres in Wagons
/ Truck / trailer including lead up
to 50 metres and lift up to 5
handling is possible a n d traffic
block is not required or in
Unloading of all type of rails of
length 130 metre and beyond
from end unloading rake and keep
the panels in head-up position at
specified distance from centre of
track clear from any
infringement.. Note: Contractor
has to keep Oxygen and
Acetylene gas with cutter as
standby during the period of work.
Loading, leading and unloading of
all types of P.Way fittings and all
other miscellaneous material
except Rails, sleepers, switches,
crossings, SEJs and Glued Joints
by road vehicles for different
leads. Note: Lead shall be the
shortest motorable road length
between the points of loading and
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
Transportation of Rails, sleepers,
switches, crossings, SEJs and
Glued Joints by road vehicles for
different leads. Note: 1. Lead shall
be the shortest motorable road
length between the points of
loading and unloading. 2. Loading
and unloading shall be paid extra
under relevant items.
Manufacturing, fabricating and
supplying retro-reflective
Engineering Indicator boards,
made of 2mm thick aluminium
sheet or 3mm thick aluminium
composite sheet, face to be fully
covered with high intensity
encapsulated type heat activated
retro-reflective sheeting
conforming to type-IV of ASTM-
D4956-01 in yellow & black or
other colour combination including
subject matter, message,
symbols, borders etc. as approved
by Engineer In-charge or as per
IRPWM guidelines, pasted on
substrate by an adhesive backing
which shall be activated by
applying heat and pressure
conforming to class-2 of ASTM-D-
4956-01 and fixing the same with
suitable sized aluminium alloy
rivets @ 20 cm c/c to back-
support frame of M.S. angle iron of
3mmprovided all along the edges
of board with theft resistant
measures back side of board shall
be with non-peelable
weatherproof paint, consisting of
one coat of zinc chromate primer
and two coats of epoxy paint.
Vertical post shall have black &
white anti-corrosive paint or
powder coating complete, as
59 202021 Caution Indicator Board of size Each 10.00 7923.22 79232.20
1400mmx400mm with back
support frame fixed to vertical
post of MS angle of size
50mmx50mmx6mm of 3650 mm
equilateral triangular shape
having each side of 1000mm with
back support frame fixed to
vertical post of MS angle of size
50mmx50mmx6mm of 3650 mm
1400mmx400mm with back
support frame fixed to vertical
post of MS angle of size
50mmx50mmx6mm of 3650 mm
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
Circular shape having diameter of
1000mm with back support frame
welded to vertical post of MS
angle of size 50mmx50mmx6mm
of 3950 mm long
Hiring of machinery for minor
miscellaneous works for short
duration including operator/driver,
fuel, lubricants and consumable.
The contractor shall arrange all
statutory permits as required by
rules and regulations prevailing in
the area of work. Payment shall
be made for actual working hours
similar with minimum 1.10 cum
bucket capacity
Pick-n-Carry crane of 12T capacity
for misc. works of handling of
Schedule Schedule C-Execution of NS ITEMS of works as per Annexure-III
Item- 3 Annexure-III
S No. Item No Description of Item Unit Qty Rate Amount
1 1 Supplying, fitting and fixing CI non Each 6.00 1646.28 9877.68
return valve of approved quality
for 100mm dia pipe with flange
bolts,nuts etc. complete in all
respect as per the direction of
Engineer-in-Charge.
all foundation,painting etc for Iron
Removal Plant including pre-
chemical dozing pumps 2 nos, FRP
Iron removal plant 1 no, and FRP
activated carbon filter 1 no,
Running hour of plant capacities
of filter, 25m cubic metre/hour
(150000 litre/day) with 10 no
areation nozzoles including all
fittings , pipe line from deep tube
to the post chlorine dozing system
1 no, and required all necessary
ingredients as Alum, Soda, ash.
The rate should include all taxes
excluding the vertical tank loading
line as per standard specification
of ISO 9001-2008 and ISO -14001-
2004, complete in all respect as
per instruction of Engineer or his
representative at site (a)Chemical
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
3 3 Supplying, fitting and fixing with Each 1.00 557600.00 557600.00
all foundation,painting etc for Iron
Removal Plant including pre-
chemical dozing pumps 2 nos, FRP
Iron removal plant 1 no, and FRP
activated carbon filter 1 no,
Running hour of plant capacities
of filter, 25m cubic metre/hour
(150000 litre/day) with 10 no
areation nozzoles including all
fittings , pipe line from deep tube
to the post chlorine dozing system
1 no, and required all necessary
ingredients as Alum, Soda, ash.
The rate should include all taxes
excluding the vertical tank loading
line as per standard specification
of ISO 9001-2008 and ISO -14001-
2004, complete in all respect as
per instruction of Engineer or his
representative at site (b)Iron
Removal Filter with CWG media
4 4 Supplying, fitting and fixing with Each 1.00 465800.00 465800.00
all foundation,painting etc for Iron
Removal Plant including pre-
chemical dozing pumps 2 nos, FRP
Iron removal plant 1 no, and FRP
activated carbon filter 1 no,
Running hour of plant capacities
of filter, 25m cubic metre/hour
(150000 litre/day) with 10 no
areation nozzoles including all
fittings , pipe line from deep tube
to the post chlorine dozing system
1 no, and required all necessary
ingredients as Alum, Soda, ash.
The rate should include all taxes
excluding the vertical tank loading
line as per standard specification
of ISO 9001-2008 and ISO -14001-
2004, complete in all respect as
per instruction of Engineer or his
representative at site (c)Activated
Carbon Filter( Aqua ACF-150)
5 5 Supplying, fitting and fixing with Each 4.00 2040.00 8160.00
all foundation,painting etc for Iron
Removal Plant including pre-
chemical dozing pumps 2 nos, FRP
Iron removal plant 1 no, and FRP
activated carbon filter 1 no,
Running hour of plant capacities
of filter, 25m cubic metre/hour
(150000 litre/day) with 10 no
areation nozzoles including all
fittings , pipe line from deep tube
to the post chlorine dozing system
1 no, and required all necessary
ingredients as Alum, Soda, ash.
The rate should include all taxes
excluding the vertical tank loading
line as per standard specification
of ISO 9001-2008 and ISO -14001-
2004, complete in all respect as
per instruction of Engineer or his
representative at site (d) Aeration
Nozzel with lateral and header
classes of soil(except hard rok) by
big boring in any approved
method like reverse rotary
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
200/150mm dia MS (ERW) pipe in
hand rocks formation by means of
DTS. Boring..........etc.
of 200/150 mm dia including brass
strainer of 150mm dial with all
fitting joing by means of welding
..............etc (a) 200mm dia pipe
of 200/150 mm dia including brass
strainer of 150mm dial with all
fitting joing by means of welding
..............etc (b)150mm dia brass
of 200/150 mm dia including brass
strainer of 150mm dial with all
fitting joing by means of welding
..............etc (c)150mm dia pipe
granular space around the strainer
and pipe with pregravels
operation of the Deep Tube well.
deep tube well completely by over
pumping .........etc.
approved quality with all leads,
lifts, descents, carriage etc.
complete to supply at
site...........etc (a) 200mm dia pipe
of 6mm thick (minimum)
approved quality with all leads,
lifts, descents, carriage etc.
complete to supply at
site...........etc (b)150mm dia pipe
of 4.85mm thick(minimum)
strainer of approved quality with
brass socket with all leads, lifts,
carriage, handling etc.
complete...........etc.
16 16 Supplying, fitting and fixing heavy Each 3.00 492.05 1476.15
type of ERWMS reducing sockets
of approved quality 200/150mm
cap at top 150mm dia with
contractor's own labour, tools,
materialws, etc. complete in all
18 18 Supplying, fitting and fixing Tube Each 3.00 192.78 578.34
well plug of approved quality as
per specification 150mm
dia.........etc.
clamps with tie nuts, bolts etc. for
MS/GI pipe as directed .........etc(a)
Housing clamps for 200mm dia MS
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
clamps with tie nuts, bolts etc. for
MS/GI pipe as directed .........etc
(b)Clamps for 100mm dia GI pipes
with tie nuts, bolts etc
clamps with tie nuts, bolts etc. for
MS/GI pipe as directed .........etc
(c)Supplying, fitting and fixing MS
heavy type 150mm dia sockets
measument of depression along
with running of submersible pump
and laying HDPE Geocell having
density greater than 0.935g/cm3
with multiple rhomboidal
indentations, textured &
perforated with horizontal rows of
maximum 10mm dia holes.
Perforations within each row shall
be 19mm on center.The
quantityof perforations shall
remove +/-17% cell wall area
having 150mm cell depth with
minimum sheet thickness 1.20mm
& having yield strength of 18
KN/m as per specifications
including cost of material, T&P,
labour scaffolding etc. to
complete the job as per drawing &
direction of Engineer- in- charge
with diver and one assistant to ply
proclain well in advance at site
work for preliminary
arrangements and necessary
action during the traffic block as
per the direction of the site
engineer, to carry of
miscellaneous works such as
earthwork in excavation & filling
etc. during block or non block
period to the satisfaction of the
engineer or his authorised
representative at site of work. The
rate should be inclusive of hire of
proclain, wages of one diver & one
assistant , fuel charge, Lubricants
and all other charges applicable
NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION
Hiring and operating Multi-Utility
vehicle of loading capacity one MT
with sitting capacity of 4/6
persons, 4 strokes, 4 cylinders
engine, factory-built metal body,
cargo box type or passenger cabin
type or both (with 24 hours
availability), including cost of fuel,
lubricants, major / minor repairs ,
salary of driver, toll tax, all other
tax complete, operation and
maintainence including running
upto 1200 km in a month. The
vehicle shall run on pucca, kutcha
r o a d along the track. The
contractor shall arrange road
permit for vehicles for all the
States of operation, as per the
instruction of Engineer in Charge
and the vehicle shall not be more
than three years old.
Extra over item no. [NS-25],
USSOR-2010: 021430 for every
additional km or part thereof over
1200 km in a month.
granular materials on low
lying/waterlogged locations under
proposed construction of road and
in preparing sub-base of road
under wet mix macadam (WMM)
on both side ramp of ROB. The
granular materials should be
approved quality conforming to
specifications in accordance with
IS 2720 (Pt.XIV) of 1893 and
compacting the same with
vibrating roller to achieve
minimum 70% density Index. The
rate includes cost of all labour,
materials, all transport, loading,
unloading, lead, lift and descent,
all taxes, GST complete in all
Item Breakup - A-Execution of CPWD DSR-2021 Item of works as per as per Annexure-I
nominal size), including finishing complete. 11.26S KOTA STONE FLOORING Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to 11.26 match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 55 11.26.1 25 mm thick Sqm 2146.49 1706.6 3663199.83 11.41S VITRIFIED FLOOR TILES NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all 11.41 colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ s q m including grouting the joints with white cement and matching pigments etc., complete. 56 11.41.2 Size of Tile 600x600 mm Sqm 500 1416.65 708325 Providing and laying Vitrified tiles in floor in different sizes (thickness to be specified by the m a n u f a c t u r e r ) with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid on 20 mm thick cement mortar 1:4 (1 cement: 4 coarse sand) jointing 11.41A with grey cement slurry @3.3 kg/sqm including grouting the joints with white cement and matching pigments etc. The tiles must be cut with the zero chipping diamond cutter only . Laying of tiles will be done with the notch trowel, plier, wedge, clips of required thickness, leveling system and rubber mallet for placing the tiles gently and easily. Glazed Vitrified tiles Matt/Antiskid 11.41A.3 finish of size 57 11.41A.3.1 Size of Tile 600 x 600 mm Sqm 2593.92 1311.05 3400758.82 12.0 ROOFING Providing, fixing and embedding sand cast iron accessories for rain water pipes in the masonry 12.40 surrounded with 12 mm thick cement mortar of the same mix, as that of masonry (lead caulking will be paid for separately): Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal 12.41 ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 58 12.41.2 110 mm diameter Metre 7520 319.75 2404520 Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water 12.42 pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. 12.42.5 Bend 87.5 degrees 59 12.42.5.2 110 mm bend Each 672 132 88704 12.42.6 Shoe (Plain) 60 12.42.6.2 110 mm Shoe Each 672 115.95 77918.4 NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION Providing and fixing unplasticised - PVC pipe clips of approved design to unplasticised - PVC rain water pipes by means of 50x50x50 mm hard wood plugs, screwed with 12.43 M.S. screws of required length, including cutting brick work and fixing in cement mortar 1:4 (1 cement : 4 coarse sand) and making good the wall etc. complete. 61 12.43.2 110 mm Each 1008 309.5 311976 12.44 Providing and fixing to the inlet Each 188 47.9 9005.2 mouth of rain water pipe cast iron 62 grating 15 cm diameter and weighing not less than 440 grams. 12.50 Providing and fixing precoated Sqm 6075 671.55 4079666.25 galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 63 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per 12.51 IS: 277, in 240 mpa steel grade, 5- 7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete : 64 12.51.1 Ridges plain (500 - 600mm) Metre 105 450.6 47313 13.0 FINISHING 13.1S CEMENT PLASTER (IN FINE SAND) 13.1 12 mm cement plaster of mix : 65 13.1.1 1:4 (1 cement: 4 fine sand) Sqm 62353.71 294.85 18384991.39 66 13.1.2 1:6 (1 cement: 6 fine sand) Sqm 46904.18 282 13226978.76 13.16S 6MM CEMENT PLASTER 13.16 6 mm cement plaster of mix : 67 13.16.1 1:3 (1 cement : 3 fine sand) Sqm 16690.87 253.05 4223624.65 68 13.18 Neat cement punning. Sqm 11189 67.8 758614.2 13.25 Extra for plastering: NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION 13.26 Providing and applying plaster of Sqm 75740.56 214.3 16231202.01 paris putty of 2 mm thickness over 69 plastered surface to prepare the surface even and smooth complete. Distempering with oil bound washable distemper of approved 13.41 brand and manufacture to give an even shade : 13.41.1 New work (two or more coats) Sqm 46904.18 162.55 7624274.46 70 over and including water thinnable priming coat with cement primer 13.44S EXTERIOR FINISHING Finishing with Deluxe Multi surface paint system for interiors and 13.48 exteriors using Primer as per manufacturers specifications : 13.48.1 Two or more coats applied on Sqm 43342.13 158.95 6889231.56 walls @ 1.25 ltr/10 sqm over and 71 including one coat of Special primer applied @ 0.75 ltr /10 sqm 13.48.2 Painting wood work with Deluxe Sqm 9664.08 144.9 1400325.19 Multi Surface Paint of required shade. Two or more coat applied 72 @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture 13.48.3 Painting Steel work with Deluxe Sqm 4981.16 140.05 697611.46 Multi Surface Paint to give an even shade. Two or more coat 73 applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture 13.50 Applying priming coat: 13.50.1 With ready mixed pink or Grey Sqm 9375.12 61.45 576101.12 primer of approved brand and 74 manufacture on wood work (hard and soft wood) 13.50.3 With ready mixed red oxide zinc Sqm 4656.16 55.5 258416.88 chromate primer of approved 75 brand and manufacture on steel galvanised iron/ steel works 16.0 ROAD WORK 16.1S ROADS 16.1 Preparation and consolidation of Sqm 23760 180.5 4288680 sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to 76 camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. 16.3 Supplying and stacking at site. 16.3.2 63 mm to 45 mm size stone cum 2376 1624.5 3859812 77 aggregate 16.3.3 53 mm to 22.4 mm size stone cum 2376 1837.25 4365306 78 aggregate NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION 16.4 Laying, spreading and compacting cum 4752 865.8 4114281.6 stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in 79 stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density . Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using 16.31 emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. With rapid setting bitumen 16.31.1 emulsion 80 16.31.1.1 On W.B.M / W.M.M. @ 0.4kg/sqm Sqm 47520 11.6 551232 16.40S SEAL COAT 16.40 Providing and laying seal coat of Sqm 23760 79.85 1897236 premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG -
aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface, including rolling and finishing with road roller all complete. 16.49S MISCELLANEOUS Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic 16.54 sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. 16.54.1 50 to 100 mm average compacted cum 1782 10013.3 17843700.6 thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler 82 @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with 16.57 electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 16.57.1 40/50 mm compacted thickness cum 1188 10870.75 12914451 with bitumen of grade VG-30 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% 83 (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. 16.80 Construction of dry lean cement cum 992.25 4130.55 4098538.24 concrete sub base over a prepared sub-grade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per specifications, cement content not to be less than 150 Kg/cum, 84 optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineer-in- charge. 17.0 SANITARY INSTALLATIONS Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually 17.1 controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: 17.1.1 White Vitreous china Orissa Each 197 5781.35 1138925.95 85 pattern W.C. pan of size 580x440 mm with integral type foot rests NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually 17.2 controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required : 17.2.1 W.C. pan with ISI marked white Each 191 5540.55 1058245.05 86 solid plastic seat and lid Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass 17.7 waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: 17.7.1 White Vitreous China Wash basin Each 576 2275 1310400 87 size 630x450 mm with a pair of 15 mm C.P. brass pillar taps Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS:13983 with C.I. brackets 17.10 and stainless steel plug 40 mm, including painting of fittings and brackets, cutting and making good the walls wherever required : 17.10.1 Kitchen sink with drain board 17.10.1.1 510x1040 mm bowl depth 250 Each 188 6008.45 1129588.6 88 mm 17.16A Providing and fixing 8 mm dia C.P. Each 200 299.35 59870 / S.S. Jet with flexible tube upto 1 metre long with S.S. triangular 89 plate to Eureopean type W.C. of quality and make as approved by Engineer - in - charge. Providing and fixing P.V.C. waste pipe for sink or wash basin 17.28 including P.V.C. waste fittings complete. 17.28.1 Semi rigid pipe 90 17.28.1.1 32 mm dia Each 298 90.95 27103.1 17.31 Providing and fixing 600x450 mm Each 576 1411.15 812822.4 beveled edge mirror of superior glass (of approved quality) 91 complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete. 17.33 Providing and fixing 600x120x5 Each 532 942.15 501223.8 mm glass shelf with edges round off, supported on anodised 92 aluminium angle frame with C.P. brass brackets and guard rail complete fixed with 40 mm long screws, rawl plugs etc., complete. Providing and fixing soil, waste 17.35 and vent pipes : 17.35.1 100 mm dia 17.35.1.1 Sand cast iron S&S pipe as per IS: Metre 2337.68 1018.05 2379875.12 93 1729 17.35.2 75 mm diameter : NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION 17.35.2.1 Sand cast iron S&S pipe as per IS: Metre 1887.68 931.55 1758468.3 94 1729 Providing and fixing bend of required degree with access door, 17.38 insertion rubber washer 3 mm thick, bolts and nuts complete. 17.38.1 100 mm dia 17.38.1.1 Sand cast iron S&S as per IS - Each 622 530.7 330095.4 95 1729 Providing and fixing single equal plain junction of required degree 17.43 with access door, insertion rubber washer 3 mm thick, bolts and nuts complete. 17.43.1 100x100x100 mm 17.43.1.1 Sand cast iron S&S as per IS - Each 376 671.2 252371.2 96 1729 Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP brass 17.73 screws with concealed fittings arrangement of approved quality and colour. 17.73.2 600 mm long towel rail with total Each 388 600.35 232935.8 length of 645 mm, width 78 mm 97 and effective height of 88 mm, weighing not less than 190 gms. 17.74 Providing and fixing PTMT shelf Each 376 607.05 228250.8 440 mm long, 124 mm width and
and colour, weighing not less than 300 gms. 18.0 WATER SUPPLY 18.4S PP-R PIPES Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS 15801, UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP - R 18.4 plain & brass threaded polypropylene random fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes testing of joints complete as per direction of E n g i n e e r- i n - C h a r g e . -Internal Exposed on walls 99 18.4.1 PN - 16 Pipe, 20mm OD (SDR-7.4) Metre 2970 254.95 757201.5 100 18.4.2 PN - 16 Pipe, 25mm OD (SDR-7.4) Metre 2970 316.1 938817 Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS:15801 UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold 18.6 water supply, including all PP - R plain & brass threaded polypropylene random fittings, including trenching, refilling & testing of joints complete as per direction of Engineer-in-Charge. - External work 101 18.6.5 PN - 10 Pipe, 50 mm OD (SDR-11) Metre 2960 568.6 1683056 102 18.6.7 PN - 10 Pipe, 75 mm OD (SDR-11) Metre 6480 879.45 5698836 NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION 18.6.9 PN - 10 Pipe, 110 mm OD (SDR- Metre 9300 1689.5 15712350 103 11) 18.7S C.P.V.C. PIPES Providing and fixing G.I. Pipes complete with G.I. fittings and clamps, i/c making good the walls 18.11 etc. concealed pipe, including painting with anti corrosive bitumastic paint, cutting chases and making good the wall : 104 18.11.1 15 mm dia nominal bore Metre 1680 485.2 815136 18.15S BRASS FITTINGS Providing and fixing gun metal 18.17 gate valve with C.I. wheel of approved quality (screwed end) : 105 18.17.1 25 mm nominal bore Each 376 532.35 200163.6 106 18.17.3 40 mm nominal bore Each 188 707.3 132972.4 Providing and fixing ball valve (brass) of approved quality, High 18.18 or low pressure, with plastic floats complete : 107 18.18.3 25 mm nominal bore Each 1408 399.15 562003.2 Providing and fixing gun metal 18.19 non- return valve of approved quality (screwed end) : 18.19.1 25 mm nominal bore 108 18.19.1.1 Horizontal Each 532 506.65 269537.8 Providing and fixing uplasticised 18.21 PVC connection pipe with brass unions : Providing and fixing C.P. brass 18.22 shower rose with 15 or 20 mm inlet : 109 18.22.2 150 mm diameter Each 376 190.1 71477.6 C.I. SLUICE VALVES/ FIRE 18.31S HYDRANTS & FIXTURES Constructing masonry Chamber 30x30x50 cm inside, in brick work in cement mortar 1:4 (1 cement :4 coarse sand) for stop cock, with C. I. surface box 100x100 x75 mm (inside) with hinged cover fixed in cement concrete slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal 18.32 size), i/c necessary excavation, foundation concrete 1:5:10 ( 1 cement : 5 fine sand : 10 graded stone aggregate 40mm nominal size ) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12mm thick, finished with a floating coat of neat cement complete as per standard design : 18.32.1 With common burnt clay F.P.S. Each 240 1712.15 410916 110 (non modular) bricks of class designation 7.5 Boring with 100 mm diameter casing pipe for hand pump / tubewell, in all soils except 18.42 ordinary hard rocks requiring blasting, including removing the casing pipe after the hand pump / tube well is lowered and tested : 111 18.42.1 Up to 6 metres depth Metre 540 618 333720 NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION 112 18.42.2 Beyond 6 m and up to 12 m depth Metre 540 730.95 394713 18.42.3 Beyond 12 m and up to 18 m Metre 300 847.35 254205 113 depth 18.43 Providing and placing in position Metre 275 813.25 223643.75 filters of 40 mm diameter G.I. pipe 114 with brass strainer of approved quality. 18.44 Providing and fixing to filter and Metre 275 499.8 137445 lowering to proper levels 40 mm 115 G.I. pipe for tube well including cleaning and priming the tube well. Providing and fixing G.I. Union in G.I. pipe including cutting and 18.46 threading the pipe and making long screws etc. complete (New work) : 116 18.46.5 40 mm nominal bore Each 150 523.2 78480 18.48 Providing and placing on terrace Litre 265000 9.7 2570500 (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable 117 locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. 18.49S C.P. BRASS FITTINGS Providing and fixing C.P. brass bib 18.49 cock of approved quality conforming to IS:8931 : 118 18.49.1 15 mm nominal bore Each 1522 434.2 660852.4 Providing and fixing C.P. brass stop cock (concealed) of standard 18.52 design and of approved make conforming to IS:8931. 119 18.52.1 15 mm nominal bore Each 830 594.75 493642.5 Providing and fixing C.P. brass angle valve for basin mixer and 18.53 geyser points of approved quality conforming to IS:8931 120 18.53.1 15mm nominal bore Each 752 500.35 376263.2 AIR VALVE & WATER METER (BULK 18.59S TYPE) 18.65 Providing and fixing PTMT soap Each 564 96.75 54567 Dish Holder having length of 138mm, breadth 102mm, height 121 of 75mm with concealed fitting arrangements, weighing not less than 106 gms. 19.0 DRAINAGE Providing and fixing square-mouth S.W. gully trap class SP-1 complete with C.I. grating brick masonry chamber with water tight 19.4 C.I. cover with frame of 300 x300 mm size (inside) the weight of cover to be not less than 4.50 kg and frame to be not less than 2.70 kg as per standard design: NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff 19.6 mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 122 19.6.4 300 mm dia. R.C.C. pipe Metre 70 902.05 63143.5 Constructing brick masonry circular manhole 1.52 m internal dia at bottom and 0.56 m dia at top in cement mortar 1:4 (1 cement : 4 coarse sand) inside cement plaster 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement, 19.13 foundation concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) and making necessary channel in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement, all complete as per standard design : Supplying and fixing C.I. cover 19.18 without frame for manholes : 19.18.1 455x610 mm rectangular C.I. Each 135 1341.35 181082.25 123 cover (light duty) the weight of the cover to be not less than 23 kg 21.0 ALUMINIUM WORK Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required 21.1 EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) : For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings 21.1.2 wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately) NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION 21.1.2.1 Anodised aluminium (anodised Kg 33400.88 531.8 17762587.98 transparent or dyed to required 124 shade according to IS: 1868, Minimum anodic coating of grade AC 15) Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene 21.3 gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item): 21.3.2 With float glass panes of 5 mm Sqm 4166.36 1325.55 5522718.5 125 thickness (weight not less than 12.50 kg/sqm) 22.0 WATER PROOFING 22.5 Providing and laying water Sqm 1244 516.6 642650.4 proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : (a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours. (b) Second 126 layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. Grading roof for water proofing 22.14 treatment with 22.14.1 Cement concrete 1:2:4 (1 cement cum 565.12 7510.75 4244475.04 127 : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) NEW TECHNOLOGIES AND 26.0 MATERIALS 26.73S PREFAB/PRECAST TECHNOLOGY NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION Fabrication and manufacturing of solid precast concrete element with provisions of shear keys, connecting loops, dowel tubes and proper lifting accessories for walls, beams, slabs, stairs, column etc, of various thickness, shape and size of different concrete grades manufactured in controlled factory environment with approved methodology including moulds (Pallet system, Tilts form, table moulds, battery moulds, vertical moulds, beam moulds, 26.74 column moulds, staircase moulds, Facade mould, etc.), mixing, transporting and placing of concrete, vibrating, curing, finishing, making necessary cutout/holes of required sizes for services, yard handling & stacking all complete as per IS 11447:1985 and as per approved shop drawings and design mix as per the direction of Engineer-in- Charge (Cost of reinforcement, Mechanical, Electrical and Plumbing inserts will be paid separately). 26.74.1 Concrete grade M-35 (Cement cum 1803.69 19488.05 35150400.9 128 content 370 kgs) Transportation of Precast Elements by flat bed Trailor (Double / Triple axle 40ft Length with proper accessories like A 26.76 frame etc) from factory, including the cost of loading , unloading & stacking at site with the help of required capacity cranes. 129 26.76.1 Lead within 15km MT 4509.23 464.8 2095890.1 26.76.2 Add/Deduct over item 26.76.1 for MT 6809.85 103 701414.55 130 every additional lead of 5 km Erection & Installation of Precast/Prestressed Concrete elements in correct & final position with proper line level and plumb at site making all arrangements (i.e cranes, push- pull jacks & all another T & P for lifting Placing & Alignment of 26.77 elements, within erection tolerance as per IS 15916 as per approved shop drawings and all complete as per the direction of Engineer-in-Charge but excluding the cost of sim pads, non shrink grout and steel works i.e hangers. All work up to fifth floor. 131 26.77.3 Solid concrete wall elements cum 1803.69 2284.75 4120980.73 NFR-CONST HQ-ENGINEERING/N F RLY CONSTRUCTION Supplying and laying of Bi-Axial Woven Polyster Geogrid conforming to MORTH 3100 and IRC113, as soil reinforcement/basal reinforcement of granular road base and sub base, area stabilization, track bed stabilization, load transfer platforms Including accessories 26.85 like tie-strips, nuts & bolts and loops/lugs for joining reinforcing elements with the facia pannels, overlaps and other protective elements for synthetic geo-grids and all other activities required etc. complete as per design requirements, manufacturer specifications and as per direction of engineer-in- charge. 26.85.1 Bi Axial Woven polyster geogrid of Sqm 17160 188.1 3227796 minimum tensile strength 20KN/m 132 in both Longitudinal and Transverse direction. Total 1010708099.80 Schedule B-Execution of NFUSSOR-2021 Item of works as per Annexure-II and any other Items of
Download all tender documents and submit your bid