| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | -0.01% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical 134 SHANTI COLONY ETAWAH | - | - | - | Rejected-Technical As per comettie sheet attached |
| 3 | Rejected-Technical D 2 53 VIBHUTI KHAND GOMTI NAGAR DHARMA TOWER GOMTI NAGAR GOMTI NAGAR LUCKNOW UTTAR PRADESH 226011 UDYAM DL 11 0111534 07AADCK4335N2Z9 R 09AADCK4335N1Z6 B | LUCKNOW | UTTAR PRADESH | 226011 | - | - | - | Rejected-Technical As per comettie sheet attached |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical As per comettie sheet attached |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical As per comettie sheet attached |
Tender Value
₹1.4 Cr
EMD Value
₹12.1 L
Closing Date
13 Apr 2026, 4:00 pmClosed
DPRO Auraiya
DPRO
Constructuio of building
2026_UPPRD_1133061_1
12/P7
Open Tender
Civil Works
90 days
Auraiya
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
ACO
₹12.1 L
23 May 2026
3 Apr 2026
13 Apr 2026
3 Apr 2026
13 Apr 2026
3 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | - | Per Sqm | - | - | BI01010001010000000000000515BI0100001116 |
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | cum | - | - | BI01010001010000000000000515BI0100001117 | |
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and lift upto 1.5 m. | - | cum | - | - | BI01010001010000000000000515BI0100001118 | |
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | - | cum | - | - | BI01010001010000000000000515BI0100001119 | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth
1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | cum | - | - | BI01010001010000000000000515BI0100001120 | |
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | Cum. | - | - | BI01010001010000000000000515BI0100001121 | |
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)2
in Foundation | - | Cum. | - | - | BI01010001010000000000000515BI0100001122 | |
Reinforced cement concrete work in beams;suspended floors;roofs having slope upto15 landing s;balconies;shelves;chajjas;lintel s;bands;plain window sills staircases and spiral staircases up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)In Lintel & Projection | - | Cum. | - | - | BI01010001010000000000000515BI0100001123 | |
Brick work with common burnt clay F.P.S. (non modular) bricks of class 7.5 in foundation and plinth in: cement mortar 1:6 (1 cement : 6 coarse sand) :
Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - | BI01010001010000000000000515BI0100001124 | |
Centring and shuttering including strutting, propping etc. and removal of form for :
Suspended floors, roofs, landings, balconies and access
platform | - | Sqm. | - | - | BI01010001010000000000000515BI0100001125 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_2115034.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid