| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.7 LAccepted-AOC SHOP NO 15 AMBALA CANTT AMBALA HARYANA 133001 | AMBALA | HARYANA | 133001 | ₹30.7 L Quoted ₹35.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹40.4 LRejected-AOC 40 E SUNDARAVELPURAM 7TH STREET TUTICORIN 628 002 | TUTICORIN | TAMIL NADU | 628002 | ₹40.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S. MURUGAN CONTRACTOR L2 | R.R AND CO L1 |
|---|---|---|---|---|---|
| 1.00 | LT Module : Charges for rack out the L.T moduels from the panel removing from its position – removal of dust deposits by using vacuum cleaner/ blower- removing the contactor cover- removal of carbon and dust in all electrical components cleaning the carbon dust in moving and fixed contacts, ammeter, control transformer CT’s with molykote tightness checking of all bolts, nuts internal wiring components – reassembling the L.T modules – After completion of the work racked the LT modules inside the panel and put in service position and check the trial run of the modules along with conveyors including cost of all consumables, T&P hire charges etc., complete. Size 3 module (30 to 125 KW) | 300 | Operation | 8,40,000 ₹9.9 L | 8,11,200 ₹9.6 L |
| 2.00 | “ “ Size 2 module (10KW to 29 KW) | 140 | Operation | 2,10,000 ₹2.5 L | 1,89,280 ₹2.2 L |
| 3.00 | “ “ Size-1 module (Upto 10KW) | 720 | Operation | 5,76,000 ₹6.8 L | 5,56,560 ₹6.6 L |
| 4.00 | “ “ Size 0 module (Switch fuse modules) | 180 | Operation | 54,000 ₹63,720 | 27,180 ₹32,072.40 |
| 5.00 | L.T Motors: Charges for removing of terminal cover, cleaning of LT motor terminal box by blower, tightness checking of all three phase end termination – bearing checking and greasing. After completion of the work Meggering the motor windings, checking the motor trial operation with load including cost of all consumables, T & P hire charges etc., complete For motor 30 KW to 125 KW | 172 | Operation | 2,40,800 ₹2.8 L | 1,93,500 ₹2.3 L |
| 6.00 | “ “ For motor 10 KW to 29 KW | 56 | Operation | 61,600 ₹72,688 | 53,648 ₹63,304.64 |
| 7.00 | “ “ For motor up to 10 KW | 278 | Operation | 2,78,000 ₹3.3 L | 1,99,882 ₹2.4 L |
| 8.00 | L.T Breakers Charges for rack out the LT Breakers from the panel removing from its position removal of dust by using blower, removal of carbon dust in all electrical components moving/ fixed contacts protection CTs with molykote, tightness checking of all bolts and nuts internal wiring with components, reassemsbling the LT Breaker to the panel and put into service in tis position and checking the healthiness of the breaker including cost of consumables hire charges for T&Ps etc., complete. | 12 | Operation | 36,000 ₹42,480 | 24,024 ₹28,348.32 |
| 9.00 | Service Transformers : Charges for removal of carbon dust from the outer surfaces of the transformer body (6.6 KV/ 433V) and cooling fins by blower/ vaccum cleaner, cleaning of earth resistance between the cooling fins by blower/ vacuum cleaner cleaning of earth resistance box and bucholz relay and winding temperature indicator terminals in transformer and earth put condition etc., including cost of all consumables T&P hire charges, etc., complete. | 8 | Operation | 24,000 ₹28,320 | 21,632 ₹25,525.76 |
| 10.00 | Travelling Tripper : Charges for removal of coal dust from the travelling tripper panel and all electrical components in travelling tripper panel cable reeling drum motor by blower cleaning and servicing the load relays and auxiliary contractors by using molykote and checking of tripper break shoe - checking of cable healthiness etc., including of cost of all consumables T&P hire charges, etc., complete two times in a month for a tripper. | 24 | Operation | 43,200 ₹50,976 | 36,288 ₹42,819.84 |
Tender Value
Refer Docs
EMD Value
₹25,400
Closing Date
2 Jan 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ICHP- Removal of carbon dust scales deposition in internal electrical components and tightness checking of LT Buses, Breakers, modules, motors, etc., in CHS-VI related to Station B conveyor system.
2025_EB_633234_1
CE/SE/MI/TTPS/36/2026-2027
Open Tender
Miscellaneous Works
365 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,400
Yes
23 Mar 2026
17 Dec 2025
3 Jan 2026
17 Dec 2025
2 Jan 2026
17 Dec 2025
LT Module : Charges for rack out the L.T moduels from the panel removing from its position – removal of dust deposits by using vacuum cleaner/ blower- removing the contactor cover- removal of carbon and dust in all electrical components cleaning the carbon dust in moving and fixed contacts, ammeter, control transformer CT’s with molykote tightness checking of all bolts, nuts internal wiring components – reassembling the L.T modules – After completion of the work racked the LT modules inside the panel and put in service position and check the trial run of the modules along with conveyors including cost of all consumables, T&P hire charges etc., complete. Size 3 module (30 to 125 KW)
“ “ Size 2 module (10KW to 29 KW)
“ “ Size-1 module (Upto 10KW)
“ “ Size 0 module (Switch fuse modules)
L.T Motors: Charges for removing of terminal cover, cleaning of LT motor terminal box by blower, tightness checking of all three phase end termination – bearing checking and greasing. After completion of the work Meggering the motor windings, checking the motor trial operation with load including cost of all consumables, T & P hire charges etc., complete For motor 30 KW to 125 KW
“ “ For motor 10 KW to 29 KW
“ “ For motor up to 10 KW
L.T Breakers Charges for rack out the LT Breakers from the panel removing from its position removal of dust by using blower, removal of carbon dust in all electrical components moving/ fixed contacts protection CTs with molykote, tightness checking of all bolts and nuts internal wiring with components, reassemsbling the LT Breaker to the panel and put into service in tis position and checking the healthiness of the breaker including cost of consumables hire charges for T&Ps etc., complete.
Service Transformers : Charges for removal of carbon dust from the outer surfaces of the transformer body (6.6 KV/ 433V) and cooling fins by blower/ vaccum cleaner, cleaning of earth resistance between the cooling fins by blower/ vacuum cleaner cleaning of earth resistance box and bucholz relay and winding temperature indicator terminals in transformer and earth put condition etc., including cost of all consumables T&P hire charges, etc., complete.
Travelling Tripper : Charges for removal of coal dust from the travelling tripper panel and all electrical components in travelling tripper panel cable reeling drum motor by blower cleaning and servicing the load relays and auxiliary contractors by using molykote and checking of tripper break shoe - checking of cable healthiness etc., including of cost of all consumables T&P hire charges, etc., complete two times in a month for a tripper.
LT Bus 6A & 6B (2Nos) and Vertical Drops: Charges for removing the top & side cover of cable alley and removal of carbon dust deposited over the bus bar, support insulators and cable connecting terminals by blower / vacuum cleaner and tightness checking of busbar joints insulator support bolts, cable end terminations if cablesend lugs found charred condition cutting the burned position and providing new lugs and crimping (lugs and bolts will be supplied by Board at free of cost) After completion of work checking the IR value of the LT bus - checking the machine earthing provision ensuring for proper earthing of the machine for one machine once in three months - 'including cost of consumables and T & P hire charges etc.,
HT Motors: Charges for removing of terminal cover, cleaning the terminals box by blower, tightness checking of all three phase end terminals and control termination, checking the De & NDE bearing conditions and lubricating with grease. After completion of the work, Meggering the motor windings and check the motor winding and check the motor for trial operation including cost of all consumables, T & P hire charges etc.,
Pull Chord & Zero Speed Switches: Charges for removal of carbon dust scales deposited in the internal parts of the pull chard switch terminal blocks & actuators and in the zero speed electronic cards, tightness checking of all control wires including cost of all consumables, T&P hire charges, etc., complete. Total No. of switches (pull chord + zero speed)=260 Nos.
Providing routine Monitoring staff for SS-VI. Charges for following instruction of SS-V operator and switch ON and OFF the module at SS-VI – rack in and rack out of LT breakers and modules for the purpose of issuing line clear – attending zero speed problem, pull chord and L/R switch in all conveyor for Station `B’ – attending any electrical problem occurred in tipper 59A&B – taking winding and oil temperature reading at SS-VI transformer 6A&6B and watching of oil level, watching the temperature of all HT and LT motors
S. MURUGAN CONTRACTOR (BID ID -1538178)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_757591.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid