Loading…
Loading…
Tender Value
₹73.8 L
EMD Value
₹1.5 L
Closing Date
20 Jul 2026, 5:00 pm
Executive Engineer Div-XVI Margao.
Vidhyut Bhavan Annex, Aquem Margao
Work of erection of new 100KVA DSS for releasing power supply to BSNL tower at Quitol, Fatorpa under V.P. Fatorpa-Quitol in the jurisdiction of Balli Section Office of SDIV, Cuncolim, Div-XVI, Margao
2026_ED_30116_1
Tender No 06(2026-27)
Open Tender
Electrical Works
365 days
Sub Div-IV, Cuncolim
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹1.5 L
7 Jul 2026
7 Jul 2026
21 Jul 2026
7 Jul 2026
20 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | COST OF MATERIAL | - | - | - | - |
| 2 | RCC poles 9.00 mtr long as per Drawing CEE/C-836 | 42 | Nos | 8,386 | ₹3,52,212 |
| 3 | RCC poles 11.00 mtr long as per Drawing CEE/C-698 | 14 | Nos | 16,371 | ₹2,29,194 |
| 4 | SETC of 70 sq.mm Single core COVERED cable | 6.36 | Kms | 3,79,274 | ₹24,12,182.64 |
| 5 | SETC of 70 sq.mm Tension clamps | 120 | Nos | 2,991 | ₹3,58,920 |
| 6 | SETC of 70 sq.mm Single core cable Alignment tie | 336 | Nos | 2,730 | ₹9,17,280 |
| 7 | SETC of 70 sq.mm Single core cable Mid Span joint | 6 | Nos | 2,584 | ₹15,504 |
| 8 | SETC of 70 sq.mm Single core cable IPC done to cover conductor for transformer DP & Jumpering | 120 | Nos | 4,487 | ₹5,38,440 |
| 9 | Cement Concrete Ratio 1:2:4 For foundation of poles muffing and road crossing | 5 | Cu.mts | 5,555 | ₹27,775 |
| 10 | HDGI 11 KV V-shape 'X' arm of channel ISMC 75 (75 x 40mm) | 36 | Nos | 1,469 | ₹52,884 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.30 MB
BOQ_30531.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid