Loading…
Loading…
Tender Value
₹34.7 L
EMD Value
₹69,440
Closing Date
21 Jul 2026, 4:00 pm
Ex. Engineer, Div. No. 01 JMC Dogra Hall, Jammu
Ex. Engineer, Div. No. 01 JMC Dogra Hall, Jammu
a Balance work of Community Hall at Shiv Mandir in Bhagwati Nagar Ward No 14 bConstruction Upgradation of lanes drains along with RCC coverings and other allied works in ward no 14 Jammu
2026_HAUDD_314334_14
Division No. 1/JMC/26-27/e-NIT No. 25
Open Tender
Civil Works
Ward No. 14.
Please refer Tender documents.
2 documents required · 2 mandatory
₹900
Yes
Chief Accounts Officer FA JMC Town Hall Jammu
₹69,440
3 Jul 2026
3 Jul 2026
22 Jul 2026
3 Jul 2026
21 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres | - | Cum | 479.3 | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc.layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 12.74 | Cum | 218.4 | ₹2,782.42 |
| 3 | Providing and laying in position specified grade of cement concrete excluding the cost of centering and , shuttering , All work up to plinth level 1:4:8 (1cement: 4 coarse sand : 8 graded stone aggregate (40mm nominal size) (including all carriages complete.) | 5.01 | Cum | 5,202.9 | ₹26,066.53 |
| 4 | Providing and laying in position specified grade of cement concrete excluding the cost of centering and , shuttering , All work up to plinth level 1:3:6 (1cement: 3 coarse sand : 6 graded stone aggregate (20mm nominal size)(including all carriages complete.) | - | Cum | 5,733.6 | - |
| 5 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | 7.81 | Sqm | 346.7 | ₹2,707.73 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns etc.(For foundation) | - | Sqm | 286.35 | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work forSuspended floors | - | Sqm | 718.2 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work fo Edges of slabs | 57.16 | rmt | 262.2 | ₹14,987.35 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for Columns, pillars, piers, abutments, posts and struts. | 69.7 | Sqm | 742.55 | ₹51,755.74 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 48.51 | Sqm | 577.55 | ₹28,016.95 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_1018071.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid