Tender Value
Refer Docs
EMD Value
₹92,000
Closing Date
10 Aug 2026, 6:00 pm
GE AF
KANGAYAMPALAYAM
REPAIR/ MAINT OF WATER SUPPLY PUMPING NETWORK AND CERTAIN MISC WATER SUPPLY WORKS IN SMQ AND OTHER CERTAIN AREA AT AF STN SULUR
2026_MES_779795_1
8902/E8
Open Tender
Miscellaneous Works
Item Rate
300 days
GE AF SULUR
PLEASE REF TENDER DOCUMENT
6 documents required · 6 mandatory
₹500
GE AF SULUR
₹92,000
20 Jul 2026
20 Jul 2026
12 Aug 2026
20 Jul 2026
10 Aug 2026
4 Aug 2026
22 Jul 2026 - 28 Jul 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: GARRISON ENGINEER (AIR FORCE) SULUR
Name of Work: REPAIR /MAINTENANCE OF WATER SUPPLY PUMPING NETWORK AND CERTAIN MISC WATER SUPPLY WORKS IN SMQ AND OTHER CERTAIN AREA AT AF STN SULUR
File No: 8902/E8
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE (Inclusive of GST) In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 Taking down defective centrifugal pump set 25HP by disconnecting the pump from motor after unscrewing nuts/ bolts of coupling, foundation, suction pipe delivery pipes and shifting of pump to workshop for repair/ servicing, comprising strip opening of pump, identify the fault, replacement of any defective parts, carrying out necessary lath work, re-assembling and shifting from workshop to site, re-installation at location, testing capacity at least for 8 hrs on load, complete all as specified and as directed by Engineer-in-Charge. 2 EACH JOB Excess(+) Full Conversion INR
2 Supply only Ball bearing suitable for 25 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
3 Supply only coupling Rubber Bush suitable for 25 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
4 Supply only split casing gaskets suitable for 25 HP motor pump as per manufacturer's design complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
5 Supply only coupling bolt with nuts suitable for 25 HP motor pump as per manufacturer's design complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
6 Supply only shaft sleeves suitable for 25 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
7 Supply only Air cock grease nipple suitable for 25 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
8 Supply only water seal suitable for 25 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
9 Taking down defective centrifugal pump set 15HP by disconnecting the pump from motor after unscrewing nuts/ bolts of coupling, foundation, suction pipe delivery pipes and shifting of pump to workshop for repair/ servicing, comprising strip opening of pump, identify the fault, replacement of any defective parts, carrying out necessary lath work, re-assembling and shifting from workshop to site, re-installation at location, testing capacity at least for 8 hrs on load, complete all as specified and as directed by Engineer-in-Charge. 2 EACH JOB Excess(+) Full Conversion INR
10 Supply only Ball bearing suitable for 15 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
11 Supply only coupling Rubber Bush suitable for 15 HP motor pump as per manufacturer's design complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
12 Supply only split casing gaskets suitable for 15 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
13 Supply only coupling bolt with nuts suitable for 15 HP motor pump as per manufacturer's design complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
14 Supply only shaft sleeves suitable for 15 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
15 Supply only Air cock grease nipple suitable for 15 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
16 Remetaling of shaft, turning, grinding as per the required size and polishing including provision of neck rings of impellers suitable for 15HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
17 Supply only water seal suitable for 25 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
18 Taking down defective centrifugal pump set 30HP by disconnecting the pump from motor after unscrewing nuts/ bolts of coupling, foundation, suction pipe delivery pipes and shifting of pump to workshop for repair/ servicing, comprising strip opening of pump, identify the fault, replacement of any defective parts, carrying out necessary lath work, re-assembling and shifting from workshop to site, re-installation at location, testing capacity at least for 8 hrs on load, complete all as specified and as directed by Engineer-in-Charge. 1 EACH JOB Excess(+) Full Conversion INR
19 Supply only Ball bearing suitable for 30 HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
20 Supply only split casing gaskets suitable for 30 HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
21 Supply only Air cock grease nipple suitable for 30 HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
22 Supply only coupling bolt with nuts suitable for 30 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
23 Supply only coupling Rubber Bush suitable for 30 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
24 Supply only shaft sleeves suitable for 30 HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
25 Supply only water seal suitable for 30HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
26 Remetaling of shaft, turning, grinding as per the required size and polishing including provision of neck rings of impellers suitable for 30HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
27 Taking down defective centrifugal pump set 40 HP by disconnecting the pump from motor after unscrewing nuts/ bolts of coupling, foundation, suction pipe delivery pipes and shifting of pump to workshop for repair/ servicing, comprising strip opening of pump, identify the fault, replacement of any defective parts, carrying out necessary lathe work, re-assembling and shifting from workshop to site, re-installation at location, testing on full load capacity at least for 8 hrs, complete all as specified and as directed by Engr-in-Charge. 1 EACH JOB Excess(+) Full Conversion INR
28 Supply only Ball bearing suitable for 40HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
29 Supply only coupling bolt with nuts suitable for 40HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
30 Supply only coupling Rubber Bush suitable for 40HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
31 Supply only split casing gaskets suitable for 40HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
32 Supply only shaft sleeves suitable for 40HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
33 Supply only Air cock grease nipple suitable for 40 HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
34 Supply only water seal suitable for 40HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
35 Supply only bronze impeller suitable for 40HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
36 Remetaling of shaft, turning, grinding as per the required size and polishing including provision of neck rings of impellers suitable for 40HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
37 Taking down defective centrifugal pump set 60 HP by disconnecting the pump from motor after unscrewing nuts/ bolts of coupling, foundation, suction pipe delivery pipes and shifting of pump to workshop for repair/ servicing, comprising strip opening of pump, identify the fault, replacement of any defective parts, carrying out necessary lathe work, re-assembling and shifting from workshop to site, re-installation at location, testing on full load capacity at least for 8 hrs, complete all as specified and as directed by Engr-in-Charge. 1 EACH JOB Excess(+) Full Conversion INR
38 Supply only Ball bearing suitable for 60 HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
39 Supply only coupling bolt with nuts suitable for 60 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
40 Supply only coupling Rubber Bush suitable for 60 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
41 Supply only split casing gaskets suitable for 60 HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
42 Supply only shaft sleeves suitable for 60 HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
43 Supply only Air cock grease nipple suitable for 30 HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
44 Supply only water seal suitable for 60 HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
45 Supply only bronze impeller suitable for 60 HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
46 Remetaling of shaft, turning, grinding as per the required size and polishing including provision of neck rings of impellers suitable for 60 HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
47 Taking down defective centrifugal pump set 20 HP by disconnecting the pump from motor after unscrewing nuts/ bolts of coupling, foundation, suction pipe delivery pipes and shifting of pump to workshop for repair/ servicing, comprising strip opening of pump, identify the fault, replacement of any defective parts, carrying out necessary lathe work, re-assembling and shifting from workshop to site, re-installation at location, testing on full load capacity at least for 8 hrs, complete all as specified and as directed by Engr-in-Charge. 2 EACH JOB Excess(+) Full Conversion INR
48 Supply only Ball bearing suitable for 20 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
49 Supply only coupling bolt with nuts suitable for 20 HP motor pump as per manufacturer's design complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
50 Supply only coupling Rubber Bush suitable for 20 HP motor pump as per manufacturer's design complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
51 Supply only split casing gaskets suitable for 20 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
52 Supply only shaft sleeves suitable for 20 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
53 Supply only Air cock grease nipple suitable for 20 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
54 Supply only water seal suitable for 20 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
55 Remetaling of shaft, turning, grinding as per the required size and polishing including provision of neck rings of impellers suitable for 20 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
56 Taking down defective centrifugal pump set 12.5 HP by disconnecting the pump from motor after unscrewing nuts/ bolts of coupling, foundation, suction pipe delivery pipes and shifting of pump to workshop for repair/ servicing, comprising strip opening of pump, identify the fault, replacement of any defective parts, carrying out necessary lathe work, re-assembling and shifting from workshop to site, re-installation at location, testing on full load capacity at least for 8 hrs, complete all as specified and as directed by Engr-in-Charge. 1 EACH JOB Excess(+) Full Conversion INR
57 Supply only Ball bearing suitable for 12.5HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
58 Supply only coupling bolt with nuts suitable for 12.5HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
59 Supply only coupling Rubber Bush suitable for 12.5HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
60 Supply only split casing gaskets suitable for 12.5HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
61 Supply only shaft sleeves suitable for 12.5HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
62 Supply only water seal suitable for 12.5HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
63 Supply only Air cock grease nipple suitable for 12.5HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
64 Remetaling of shaft, turning, grinding as per the required size and polishing including provision of neck rings of impellers suitable for 12.5HP motor pump as per manufacturer's design complete all as specified and as directed. 1 EACH Excess(+) Full Conversion INR
64.01 Note for item 01 to 64: (a) The spare parts shall be measured and paid seperately in the relevent items as supply only. (b) Cost of labour for replacement of minor spares and transportation shall be deemed to be included in the quoted rate. (c) The pumpset shall be spared for one week for repair from the date of complaint given by AGE/ JE E/M regarding breakdown. The Contractor is responsible for making alternate arrangement of pump set in case of time required more than one week.
64.02 (d) In case services affected due to delay in repair of pump set, a penalty of Rs 500 per day will be levied from the contractor. (e) Please note that this penalty is exclusively other than the condition 56 of IAFW-2249 and shall be treated as interim condition of the contract. (f) The decision of the Accepting Officer in this regard shall be final and binding.
65 Material and labour for cleaning of RCC UG Sumps of the following capacities by involving followings 09 (NINE) stage of cleaning process complete all as specified and as directed by Engr-in-Charge (i) De-watering by high pressure submersible pump all complete (ii) Removal of sludge from RCC sump (iii) Cleaning of walls, floors, ceiling etc by high pressure jet pump 80-180 bar pressure all complete (iv) Removing dirt and sludge by vacuum pump (v) Anti-Bacterial Treatment of inside of tank which effective against all pathogens all complete. (vi) Sterilization of the tank atomosphere by UV radiation inside the tank. (vii) Applying one coat of white wash on internal surfaces. (viii) Replace nylon net for vent pipes & man hole cover (ix) Writing letter in bold with white paint on black colour back ground such as sump number, capacity, cleaned on Date & Due on Date etc
65.01 Note: The tenderer shall take into consideration for following points while quoting the rate for this item and the quoted rate shall be deemed to be included for: (i) The contractor shall be provide dewatering pump of suitable capacity and mobile generator for operation of dewatering by high pressure submersible pump (or) Diesel driven high pressure pump and the rate quoted rate is inclusive of rent/hiring charge complete. (ii) Cutting of shrubs, vegetation, grass bush, weed, trees and sapling not exceeding 30 cm in girth, measured at a height of two metre above ground level. Useful material shall be stacked.
65.02 (iii) Material removed from the tank shall be disposed off at out side MD land. (iv) Tank shall be made available for cleaning for a period of 8 hours only and contractor has to arrange sufficient labour/ T & P to complete the job with the given period only or otherwise penalty shall be imposed @ Rs 1500/- per day. (v) All safety with gadgets like safety Belts, special safety ladder, Helmets, Heavy Duty Gum Boots, Gloves, Safety Goggles, Masks, Aprons, etc. for complete security the safe operations. Storage and Cleaning equipment’s like Scrubbers/Wipers, Storage drums, Sludge Collectors and Cisterns, etc. must be integral part of system.
65.03 Semi underground sump of capacity 200000 gallon. 8 EACH JOB Excess(+) Full Conversion INR
65.04 Semi underground sump of capacity 150000 gallon. 8 EACH JOB Excess(+) Full Conversion INR
65.05 Semi underground sump of capacity 80000 gallon. 2 EACH JOB Excess(+) Full Conversion INR
65.06 Semi underground sump of capacity 50000 gallon. 8 EACH JOB Excess(+) Full Conversion INR
65.07 Semi underground sump of capacity 20000 gallon. 18 EACH JOB Excess(+) Full Conversion INR
65.0799999999999 Semi underground sump of capacity 15000 gallon. 2 EACH JOB Excess(+) Full Conversion INR
65.0899999999999 Underground sump of capacity 10000 gallon. 2 EACH JOB Excess(+) Full Conversion INR
66 Material and labour for cleaning/ overhauling of squirrel cage induction motor of capacity between 30 to 60 HP by dismantling stator and rotor assembly, carryout necessary testing of windings to findout any core loss in windings, test of insulation resistance, etc. and applying of proper insulation material for strengthening of insulation, cleaning the casing and slots with wire brush, washing out dust and carbon particles with proper chemical solution, replacement of unserviceable bearing, bush, carryout re-alignment of crank shaft re-assembling stator and rotor assemblies, testing complete all as specified and as directed by Engr-in-Charge. Note: (i) Rewinding of stator and rotor if required shall be measured and paid seperately. (ii) Cost of Transportation to and from the local workshop shall be deemed to be included in the quoted rate. 1 EACH JOB Excess(+) Full Conversion INR
67 Material and labour for rewinding of stator core with proper gauge and amount of highly insulated copper wire reqd for item No 66 as above as per existing, testing complete all as specified and as directed by Engr-in-Charge. 2 EACH JOB Excess(+) Full Conversion INR
68 Material and labour for rewinding of rotor core with proper gauge and amount of highly insulated copper wire reqd for item No 66 as above as per existing, testing complete all as specified and as directed by Engr-in-Charge. 2 EACH JOB Excess(+) Full Conversion INR
69 Material and labour for disconnecting the delivery pipe line of submersible pump sets of any capacity from water mains to take out by lifting column pipe of 50mm dia alongwith submersible cable and pump set from shallow well of any depth for servicing of submersible pump sets of any capacity at site, re-assembling the column pipe and re-connection of submersible cable with pump set and lowering in the shallow/open well, testing and commissioning complete all as specified and as directed by Engr-in-Charge. Note: The cost of tools and equipments reqd for lifting/ lowering of pipes and pumps shall be deemed to be included in the quoted rate. 3 EACH JOB Excess(+) Full Conversion INR
70 Material and labour for for dismantling pump and motor of submersible pump set of capacity 12.5 HP to carry out minor repairs and replacements at local workshop, duly replacing worn out parts, applying one coat of spray painting with synthetic enamel paint of existing colour and testing complete all as specified and as directed by Engineer-in-Charge. 2 EACH JOB Excess(+) Full Conversion INR
71 Supply only GM Bush suitable for 12.5 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
72 Supply only sleeves MS key for impeller suitable for 12.5 HP motor pump as per manufacturer's design complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
73 Supply only SS coupling bearing suitable for 12.5 HP motor pump as per manufacturer's design complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
74 Supply only oil seal thrust bearing suitable for 12.5 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
75 Supply only Sand Guard suitable for 12.5 HP motor pump as per manufacturer's design complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
76 Dismantling pump and motor of submersible pump set for capacity 3 HP to 5 HP to carry out repairs and minor replacements at local workshop, duly replacing worn out parts, applying one coat of spray painting with synthetic enamel paint of existing colour and testing complete all as specified and as directed by Engineer-in-Charge. 3 EACH JOB Excess(+) Full Conversion INR
77 Supply only GM Bush suitable for 3 HP to 5 HP motor pump as per manufacturer's design complete all as specified and as directed. 3 EACH Excess(+) Full Conversion INR
78 Supply only sleeve MS key for impeller suitable for 3 HP to 5 HP motor pump as per manufacturer's design complete all as specified and as directed. 6 EACH Excess(+) Full Conversion INR
79 Supply only SS coupling bearing suitable for 3 HP to 5 HP motor pump as per manufacturer's design complete all as specified and as directed. 6 EACH Excess(+) Full Conversion INR
80 Supply only oil seal thrust bearing suitable for 3 HP to 5 HP motor pump as per manufacturer's design complete all as specified and as directed. 3 EACH Excess(+) Full Conversion INR
81 Supply only Sand Guard suitable for 3 HP to 5 HP motor pump as per manufacturer's design complete all as specified and as directed. 3 EACH Excess(+) Full Conversion INR
82 Dismantling pump and motor of submersible pump set for capacity 7.5 HP to 10 HP to carry out repairs and minor replacements at local workshop, duly replacing worn out parts, applying one coat of spray painting with synthetic enamel paint of existing colour and testing complete all as specified and as directed by Engineer-in-Charge. 4 EACH JOB Excess(+) Full Conversion INR
83 Supply only GM Bush suitable for 7.5 HP to 10 HP motor pump as per manufacturer's design complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
84 Supply only sleeve MS key for impeller suitable for 7.5 HP to 10 HP motor pump as per manufacturer's design complete all as specified and as directed. 8 EACH Excess(+) Full Conversion INR
85 Supply only SS coupling bearing suitable for 7.5 HP to 10 HP motor pump as per manufacturer's design complete all as specified and as directed. 8 EACH Excess(+) Full Conversion INR
86 Supply only oil seal thrust bearing suitable for 7.5 HP to 10 HP motor pump as per manufacturer's design complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
87 Supply only Sand Guard suitable for 7.5 HP to 10 HP motor pump as per manufacturer's design complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
87.01 Notes for item No. 70 to 87: (a) The spares shall be measured and paid seperately in the relevent items given below as supply only. (b) Cost for replacement of minor spares and transportation shall be deemed to be included in the quoted rate. (c) The pumpset shall be spared for one week for repair from the date of complaint given by AGE/ JE E/M regarding breakdown. The Contractor is responsible for making alternate arrangement of pump set in case of time required more than one week. (d) In case services affected due to delay in repair of pump set, a penalty of Rs 200 per day will be levied from the contractor. (e) Please note that this penalty is exclusively other than the condition 56 of IAFW-2249 and shall be treated as interim condition of the contract. (f) The decision of the Accepting Officer in this regard shall be final and binding.
88 Material and labour for rewinding of monoblock pump set motor of capacity 2 HP to 3 HP with same gauge of super enamelled copper winding wire after cutting the burnt windings, cleaning slots including insulating materials, PVC sleeves, insulation paper, wooden stick etc complete all as specified and as directed by Engineer-in-charge 5 EACH JOB Excess(+) Full Conversion INR
89 Material and labour for rewinding of monoblock pump set motor of capacity 4 HP to 5 HP with same gauge of super enamelled copper winding wire after cutting the burnt windings, cleaning slots including insulating materials, PVC sleeves, insulation paper, wooden stick etc complete all as specified and as directed by Engineer-in-charge 4 EACH JOB Excess(+) Full Conversion INR
90 Supply and fix in replacement of 110A/AC3, 160A/AC1, 3 pole power contactor with 2 NO + 2 NC Aux Contacts complete all as specified and as directed. 5 EACH Excess(+) Full Conversion INR
91 Supply and fix in replacement of 40A/AC3, 55A/AC1, 3 pole power contactor with 1 NO / NC Aux Contacts complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
92 Supply and fix in replacement of 25A/AC3, 45A/AC1, 3 pole power contactor with NO / NC Aux Contacts complete all as specified and as directed. 6 EACH Excess(+) Full Conversion INR
93 Supply and fix in replacement of 18A/AC3, 30A/AC1, 3 pole power contactor with NO / NC Aux Contacts complete all as specified and as directed. 6 EACH Excess(+) Full Conversion INR
94 Material and labour for scrubbing out the rust deposited on the surface of centrifugal pump set of capacity of 30 to 60 HP including its base frame and applying two coats of synthetic enamel paint over a of redoxide primer including preparation of surfaces and marking SM /MES Number complete all as specified and as directed by Engineer-in-Charge. 10 EACH JOB Excess(+) Full Conversion INR
95 Material and labour for scrubbing out the rust deposited on the surface of centrifugal pump set of capacity of 10 to 25 HP including its base frame and applying two coats of synthetic enamel paint over a of redoxide primer including preparation of surfaces and marking SM /MES Number complete all as specified and as directed by Engineer-in-Charge. 16 EACH JOB Excess(+) Full Conversion INR
96 Supply and fix in replacement of fully automatic star delta starter ML/MNX series with sheet metal enclosure suitable for 30 to 60 HP, 3 phase, 415 Volts, 50Hz complete all as specified and as directed. 3 EACH Excess(+) Full Conversion INR
97 Supply and fix in replacement of fully automatic star delta starter ML/MNX series with sheet metal enclosure suitable for 10 to 30 HP, 3 phase, 415 Volts, 50Hz complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
98 Supply and fix in replacement of Electronic overload relay (Manual reset) range 24-40 Amp suitable for direct mountimg complete all as specified and as directed. 5 EACH Excess(+) Full Conversion INR
99 Supply and fix in replacement of Electronic overload relay (Manual reset) range 45-75 Amp suitable for direct mounting complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
100 Supply and fix in replacement of Electronic overload relay (Manual reset) range 66-110 Amp suitable for direct mounting complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
101 Supply and fix in replacement of monoblock pump single phase 2/3 HP capacity 240Volts, 50 Hz, AC including fitting in given location with GI fittings and electrical connections with control wire complete all as specified and as directed. 3 EACH Excess(+) Full Conversion INR
102 Supply and fix in replacement of submersible pump horizontal single phase 2/3 HP capacity 240Volts, 50 Hz, AC including fitting in given location with GI fittings and electrical connections with control wire complete all as specified and as directed. 3 EACH Excess(+) Full Conversion INR
103 Supply and fix in replacement of submersible pump single phase 5 HP capacity 240Volts, 50 Hz, AC including fitting in given location with GI fittings and electrical connections with control wire complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
104 Development of borewell by means of high capacity compressor of capacity not less than 620 CFM at 8 Kg/cm square to its optimum yeild till clear water of potable quality free from sand/ silt is obtained including draw down performnce and yeild test of the tubewells complete all as specified and as directed. 4 PER HOUR Excess(+) Full Conversion INR
105 Supply only Bleaching Powder for water treatment, should contain 65-73% of available chlorine for effective against bacteria and viruses complete all as specifed and as directed. 250 KG Excess(+) Full Conversion INR
106 Supply and fix in replacement of Motor Guard (weather protection cover) made out of 22 gauge GI Sheet suitable for 2 to 5 HP centrifugal mono block pump set with lifting handle and provision of suction /discharge pipeline Holes complete all as specifed and as directed. 10 EACH Excess(+) Full Conversion INR
107 Material and labour for GI clamps of 32mmx5mm complete with screw 50mm long x 6mm dia with drilling the hole with drilling machine with rawl plugs / wooden gutties for fixing /clamping the GI/ PP-R/ UPVC pipes suitable for 50/ 40mm dia at a interval 01metre each complete by providing necessary scaffolding upto the height of 15m on each bldg complete all as specified and as directed. Note: Replacement of all clamps in single rising pipe in a building shall be measured as Each job 45 EACH Excess(+) Full Conversion INR
108 Supply and fix in replacement of MCCB, 4 Pole, 415V fixed thermal magnetic release type, with 200 Amps rating, breaking capacity of 36 KA, Ics= 50% Icu as per IEC 60947-II, Class -II front face with suitable for isolation and fixed overload & fixed short circuit setting type, F2 frame complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
109 Supply and fix in replacement of MCCB, 4 Pole, 415V fixed thermal magnetic release type, with 100 Amps rating, breaking capacity of 25 KA, Ics= 50% Icu as per IEC 60947-II, Class -II front face with suitable for isolation and fixed overload & fixed short circuit setting type, F1 frame complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
110 Supply and fix in replacement of MCCB, 4 Pole, 415V fixed thermal magnetic release type, with 160 Amps rating, breaking capacity of 25 KA, Ics= 50% Icu as per IEC 60947-II, Class -II front face with suitable for isolation and fixed overload & fixed short circuit setting type, F2 frame complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
111 Supply and fix in replacement of MCCB, 4 Pole, 415V fixed thermal magnetic release type, with 63 Amps rating, breaking capacity of 25 KA, Ics= 50% Icu as per IEC 60947-II, Class -II front face with suitable for isolation and fixed overload & fixed short circuit setting type, F1 frame complete all as specified and as directed. 3 EACH Excess(+) Full Conversion INR
112 Supply and fix in replacement of MCCB, 4 Pole, 415V fixed thermal magnetic release type,with 400 Amps rating, breaking capacity of 36 KA, Ics= 50% Icu as per IEC 60947-II, Class -II front face with suitable for isolation and fixed overload & fixed short circuit setting type, F4 frame complete all as specified and as directed. 3 EACH Excess(+) Full Conversion INR
113 Supply and fix in replacement of MCCB, 4 Pole, 415V fixed thermal magnetic release type, with 250 Amps rating, breaking capacity of 36 KA, Ics= 50% Icu as per IEC 60947-II, Class -II front face with suitable for isolation and fixed overload & fixed short short circuit setting type, F2 frame complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
114 Material and labour for PCC 1:2:4 type B1 using 20 mm graded aggregate as in foundation of any size of motor pump set of capacity 20 HP to 60 HP and fitting pumping set in position with base frame, painted with synthetic enamel black paint including disconnecting & dismantling of pump set from the foundation, breaking the existing defective PCC foundation in any size, shape complete all as specified and as directed. 5 EACH JOB Excess(+) Full Conversion INR
115 Supply and fix in replacement of impeller of existing material suitable for 10 to 20 HP motor complete all as specified and as directed. 5 EACH Excess(+) Full Conversion INR
116 Supply and fix in replacement of impeller of existing material suitable for 25 to 30 HP motor complete all as specified and as directed. 3 EACH Excess(+) Full Conversion INR
117 Supply and fix in replacement of impeller of existing material suitable for 40 to 60 HP motorcomplete all as specified and as directed. 3 EACH Excess(+) Full Conversion INR
118 Supply and fix in replacement of DOL starter for 1 HP to 2 HP with relay 13-22 Amp complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
119 Supply and fix in replacement of DOL starter for 3 HP to 5 HP with relay 32-63 Amp complete all as specified and as directed. 3 EACH Excess(+) Full Conversion INR
120 Supply and fix in replacement of star delta starter SS enclosed inbuilt wiring with double door with ammeter, Voltmeter, indication lamp mounted on enclosure with suitable contactor, incomer MCB and relay timer for 3 HP to 5 HP with relay 63-120 Amp complete all as specified and as directed. 3 EACH Excess(+) Full Conversion INR
121 Supply and fix in replacement of electronic timer ET, 240/415V for 12-120 Secs with mounting bracket kit complete all as specified and as directed. 6 EACH Excess(+) Full Conversion INR
122 Supply and fix in replacement of Ammeter digital type, 3 phase, 0-100 Amps range, 96x96 mm size, flush mounting complete all as specified and as directed. 5 EACH Excess(+) Full Conversion INR
123 Supply and fix in replacement of Voltmeter digital type, 3 phase, 96x96 mm size, flush mounting complete all as specified and as directed. 5 EACH Excess(+) Full Conversion INR
124 Supply and fix in replacement of dial type FM-1/ Quartz Daily Timer Switch, 110VAC-240VAC, Base/DIN mounting complete all as specified and as directed. 4 EACH Excess(+) Full Conversion INR
125 Supply and fix in replacement of CT 30/5 to 200/5, 3 phase complete all as specified and as directed. 8 EACH Excess(+) Full Conversion INR
126 Supply and fix in replacement of indicating light with bulb set of three (R,Y,B) complete all as specified and as directed. 20 EACH Excess(+) Full Conversion INR
127 Material and labour for repair /maintenance of sand filter of semi automatic drinking water filtration system capacity 50000 lit per hour, including replacing of sand & silex by opening top cover of sand filter tank, removing used sand and silex from Sand Filter Tank, washing / cleaning the tank neatly & properly, re-filling with new fine sand, coarse sand, fine silex and coarse silex in proper layers as per requirment, closing top cover of the sand filter tank properly, check all connections complete all as specified and as directed by Engineer-in-Charge. 1 EACH JOB Excess(+) Full Conversion INR
128 Material and labour for repair /maintenance of activated carbon filter of sand filter of semi automatic drinking water filtration system capacity 50000 lit per hour, including replacing of carbon by opening top cover of carbon filter tank, removing used old carbon from carbon filter tank, washing /cleaning the tank neatly & properly, re-filling with new activated carbon as per requirment, closing top cover of the carbon filter tank properly, check all connections complete all as specified and as directed by Engineer-in-Charge. 1 EACH JOB Excess(+) Full Conversion INR
129 Material and labour for replacement of signboard made out of SS frame and size of 1.5 Mtr x 1 Mtr box type with fine quality PVC sheet writing letter minimum letter size is 10" and 30 ltrs placing in side board with proper securing and fixing one 20W LED tube light with control wiring from switch point mounting on existing structure complete all as specified and as directed. 2 EACH JOB Excess(+) Full Conversion INR
130 Supply and fix in replacement of PVC copper stranded conductor cable size 1.5 Sqmm multi stranded single core 1100Volt grade complete all as specified and as directed. 30 RM Excess(+) Full Conversion INR
131 Supply and fix in replacement of PVC copper stranded conductor cable size 2.5 Sqmm multi stranded single core 1100 Volt grade complete all as specified and as directed. 60 RM Excess(+) Full Conversion INR
132 Supply and fix in replacement of PVC copper stranded conductor cable size 4 Sqmm multi stranded single core 1100 Volt grade complete all as specified and as directed. 60 RM Excess(+) Full Conversion INR
133 Supply and fix in replacement of PVC copper stranded conductor cable size 6 Sqmm multi stranded single core 1100 Volt grade complete all as specified and as directed. 80 RM Excess(+) Full Conversion INR
134 Supply and fix in replacement of PVC copper stranded conductor cable size 10 Sqmm multi stranded single core 1100 Volt grade complete all as specified and as directed. 60 RM Excess(+) Full Conversion INR
135 Supply and fix in replacement of PVC copper stranded conductor cable size 16 Sqmm multi stranded single core 1100 Volt grade complete all as specified and as directed. 50 RM Excess(+) Full Conversion INR
136 Supply and fix in replacement of PVC flat sheathed submersible cable copper conductor of size 2.5 sqmm 3 core, 1100 Volt gradecomplete all as specified and as directed. 60 RM Excess(+) Full Conversion INR
137 Supply and fix in replacement of PVC flat sheathed submersible cable copper conductor of size 4.0 sqmm 3 core, 1100 Volt grade complete all as specified and as directed. 80 RM Excess(+) Full Conversion INR
138 Supply and fix in replacement of PVC flat sheathed submersible cable copper conductor of size 6.0 sqmm 3 core, 1100 Volt grade complete all as specified and as directed. 80 RM Excess(+) Full Conversion INR
139 Supply and fix in replacement of PVC flat sheathed submersible cable copper conductor of size 10.0 sqmm 3 core, 1100 Volt grade complete all as specified and as directed. 60 RM Excess(+) Full Conversion INR
140 Supply and fixing ductile iron pressure pipes, centrifugally cast [spun], class 'K-7', 100mm bore with socket and spigot ends conforming to IS 8329-2000, latest version, in standard lengths suitable for push-on rubber gasket jointing with inside cement mortar lining and black bitumen external coating including taking down existing unserviceable pipe of any description/ size complete all as specified and as directed by Engineer-in-Charge. 60 RM Excess(+) Full Conversion INR
141 All as per Item No. 140 here-in-before, but for 150mm bore 20 RM Excess(+) Full Conversion INR
142 All as per Item No. 140 here-in-before, but for 80mm bore 12 RM Excess(+) Full Conversion INR
142.01 Note for item No 140 to 142: (a) DI fittings shall be measured and paid separately under relevent item. (b) Eathwork, excavtion, returning filling, removal of surplus soil shall be measured and paid separately under relevent items.
143 Supply and fix in replacement of DI fittings bends of any type/ radius/ angle, tapers any type (straight, bend, increasing, decreasing or double socket etc), Tee pieces, connection pieces, collars, caps and plugs complete all as specified and as directed. 200 KG Excess(+) Full Conversion INR
144 Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth and getting out in hard/dense soil complete all as specified and as directed by Engineer-in-Charge 67.5 CUM Excess(+) Full Conversion INR
145 Returning filling in including spreading, levelling, watering and well ramming in layers not exceeding 25cm complete all as specified and as directed. 57.37 CUM Excess(+) Full Conversion INR
146 Removing excavated material not exceeding 50metre and depositing where directed at a level not exceeding 1.5metre above the starting point complete all as specified and as directed. 6 CUM Excess(+) Full Conversion INR
147 Material and labour for removing of accumulated earth over water supply mains of depth up to 30 cm including cleaning/cutting the grass and removing the grass waste to outside MD land complete all as specified and as directed. Note: The unit rate quoted shall be deemed to be inclusive of following.- (a) Cutting of shrubs, vegetation, grass bush, weed, trees and sapling not exceeding 30 cm in girth, and height upto 2m. (b) Cutting the grass/ felling of trees shall be include digging out roots up to 60cm below the ground level or 14cm below the formation level, whichever is lower. All holes and hollows formed in the ground digging out of roots shall be carefully filled up with moorum/ red bajri well rammed and levelled. 1200 SQM Excess(+) Full Conversion INR
148 Attending day to day water supply service related complaints like chocking of rising main pipes of buildings, blockage in control valves/ float valves/ pipe fittings, arrest leakage in any rising main/ roof etc, applying necessary engineering efforts like dismantling of pipes and fittings to clean and remove blocking objects, descaling of pipes, re-fixing of pipes on wall, etc to restore the proper flow of water to service tanks complete all as specified and as directed by Engineer-in-Charge. 360 EACH JOB Excess(+) Full Conversion INR
148.01 Notes: (a) The contractor shall be attend above mentioned job in any location of entire domestic and Tech area of Air Force Stn Sulur. (b) The service tanks are positioned on roof top of multi storied buildings upto four storey. Contractor shall be responsible to ensure that the labour employed should be equipped with safety items like industrial helmet, safety belt, extensible ladder of 40 feet length, plumbing and cuttings tools, etc.
148.02 (c) The cost of rethreading of GI pipes of 25mm dia and adding of new GI nipple of suitable length after rethreading shall be deemed to be included in the quoted rate. (d) Due to the shortage of water in the station, the repair work and testing required under this item need to be carried out during water supply distribution hours i.e. 5:30 AM to 7:30 AM. Nothing extra shall be permitted in this regard. (e) The cost of repair to the damages of cemented surfaces/ external finishes/ metal clamps of rising pipes are also deemed to be included in the quoted rate.
148.03 (f) In case of any delay in attending the complaint more than 6 hrs after handing over routine/ urgent complaints, the contractor shall be liable to pay the penalty as described in penalty clause given here as under. (g) If the delay is more than 06 hrs period and GE has not satisfied with the reason for delay, then penalty at the rate of Rs 1000/- per job shall be deducted from the dues of the contractor. Please note that this penalty is exclusively other than the condition 56 of IAFW - 2249 and shall be treated as interim condition of the contract and will be enforce above as and when delay in individual job is noticed and no claim whatsoever on this account shall be entertained by the Deptt. (j) The decision of the Accepting Officer in this regard shall be final and binding.
149 Material and labour for 90mm outer dia of pipe 3-layer PP-R (polypropylene random copolymer) concealed pipes SDR 7.4 (PN 16 @20˚C) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded polypropylene random fittings fixed complete including taking down of existing pipe complete all as specified and as directed. 60 RM Excess(+) Full Conversion INR
150 All as per Item No. 149 here-in-before, but for 63mm outer dia. 60 RM Excess(+) Full Conversion INR
151 All as per Item No. 149 here-in-before, but for 50mm outer dia. 60 RM Excess(+) Full Conversion INR
152 All as per Item No. 149 here-in-before, but for 30 to 40mm outer dia. 60 RM Excess(+) Full Conversion INR
153 All as per Item No. 149 here-in-before, but for 25mm outer dia. 60 RM Excess(+) Full Conversion INR
154 All as per Item No. 149 here-in-before, but for 20mm outer dia. 60 RM Excess(+) Full Conversion INR
154.01 Note for item No 149 to 154: (a) Cutting of existing road, excavation, laying of any type/ bore of pipe in trenches including taking down of any description and 150mm thick PCC 1:2:4 type B2 40mm aggregate as in existing road shall be deemed to be include in the quoted rate. (b) The unit rate shall include the cost of short lengths, with necessary pipe fittings such as bends, tees, short pieces connectors, elbows, reducers, unions, sockets etc and fixing accssories such as pipe hooks, screws clamps etc (c) Wall thickness of pipes shall be all as per IS: 15801
155 Supply and fix in replacement of 90mm outer dia of pipes P-PR gate valves (brass insert) with iron wheel screwed both ends for iron pipes complete all as specified and as directed. 2 EACH Excess(+) Full Conversion INR
156 All as per Item No. 155 here-in-before, but for 63mm outer dia. 2 EACH Excess(+) Full Conversion INR
157 All as per Item No. 155 here-in-before, but for 50mm outer dia. 3 EACH Excess(+) Full Conversion INR
158 All as per Item No. 155 here-in-before, but for 40mm outer dia. 4 EACH Excess(+) Full Conversion INR
159 All as per Item No. 155 here-in-before, but for 32mm outer dia. 5 EACH Excess(+) Full Conversion INR
160 All as per Item No. 155 here-in-before, but for 25mm outer dia. 8 EACH Excess(+) Full Conversion INR
161 Supply and laying UPVC pipe of class “SCH 40”, 100mm dia, conforming to IS 13592 with all necessary fittings (specials) and fixtures including disconnecting and taking out old unserviceable pipe with all fittings complete all as specified and as directed. 60 RM Excess(+) Full Conversion INR
162 All as per Item No. 161 here-in-before, but for 75mm dia. 70 RM Excess(+) Full Conversion INR
163 All as per Item No. 161 here-in-before, but for 50mm dia. 60 RM Excess(+) Full Conversion INR
164 All as per Item No. 161 here-in-before, but for 32mm dia. 50 RM Excess(+) Full Conversion INR
165 All as per Item No. 161 here-in-before, but for 25/20mm dia. 50 RM Excess(+) Full Conversion INR
166 Material and labour for preparation of old treated surfaces by scrubbing, removing old paint making good surface, cleaning throughly and providing two coats of apex weather proof paint to the outer surface of OH tank, UG sump, pillars etc with specified colours, including marking of cleaning record as directed in painting for the following OH tanks, UG sumps etc complete all as specified and as directed. Note: Required tools and plants, ladder scaffold and other equipments shall be inclusive in the quoted rate.
166.01 Semi underground sump of capacity 200000 gallon. 8 EACH JOB Excess(+) Full Conversion INR
166.02 Semi underground sump of capacity 150000 gallon. 8 EACH JOB Excess(+) Full Conversion INR
166.03 Semi underground sump of capacity 80000 gallon. 4 EACH JOB Excess(+) Full Conversion INR
166.04 Semi underground sump of capacity 50000 gallon. 4 EACH JOB Excess(+) Full Conversion INR
166.05 Semi underground sump of capacity 20000 gallon. 12 EACH JOB Excess(+) Full Conversion INR
166.06 Semi underground sump of capacity 15000 gallon. 2 EACH JOB Excess(+) Full Conversion INR
166.07 Underground sump of capacity 10000 gallon. 2 EACH JOB Excess(+) Full Conversion INR
166.08 Over head tanks 50000 gallon capacity 68 ft height. 2 EACH JOB Excess(+) Full Conversion INR
166.09 Over head tanks 50000 gallon capacity 50 ft height. 6 EACH JOB Excess(+) Full Conversion INR
166.1 Over head tanks 40000 gallon capacity 50 ft height. 4 EACH JOB Excess(+) Full Conversion INR
166.11 Over head tanks 30000 gallon capacity 59 ft height. 4 EACH JOB Excess(+) Full Conversion INR
166.12 Over head tanks 30000 gallon capacity 50 ft height. 6 EACH JOB Excess(+) Full Conversion INR
166.13 Over head tanks 25000 gallon capacity 50 ft height. 2 EACH JOB Excess(+) Full Conversion INR
166.14 Over head tanks 15000 gallon capacity 50 ft height. 2 EACH JOB Excess(+) Full Conversion INR
167 Material and labour for applying one coat of anti corrossive bituminous paint on existing ladder and railing of OH tank of any capacity upto 15m height including preparation of old surfaces complete all as specified and as directed. 10 EACH JOB Excess(+) Full Conversion INR
168 Supply of calcium based high strength chlorination chemical for water in granular form chlorine concentration level having 65%-70% Chlorine content packed in 45 Kg capacity in factory sealed HDPE Container superior quality suitable for treatment of drinking water complete all as specified and as directed 30 PER DRUM Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.33 MB
COMMON_PAGES_8902.pdf
Tender Documents • 0.57 MB
PS_8902.pdf
Additional Documents • 0.48 MB
BOQ_873430.xls
BOQ • 9.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].