| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 CrAdmitted-Finance K 4 FIVE STAR INDUSTRIAL AREA MIDC BUTIBORI NAGPUR 441 122 | NAGPUR | NAGPUR | MAHARASHTRA | 441122 | ₹24.1 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Uploaded Order copies not fulfilling the PQR Clause 6b and firm not uploaded turnover certificate issued by chartered accountant containing UDIN. Moreover, Firm has not uploaded copy of Valid class A Electrical License. |
| 3 | Rejected-Technical | - | - | Rejected-Technical Uploaded Order copies not fulfilling the PQR Clause 6b, firm not uploaded turnover certificate, Firm taken exemption on Tender fee against UDYAM registration certificate of Andra Pradesh and GST certificate not uploaded. |
| Sl No | Description | Qty | Unit | EM Services (I) Pvt. Ltd. L1 |
|---|---|---|---|---|
| 1.00SSTPP, KHANDWA | ||||
| 1.10 | Routine/Preventive/Scheduled/Minor outage Maintenance of following areas of 2x600 MW, PH-I SSTPP, Dongalia:
Boiler Pressure Part, Boiler Non Pressure Part, O&M of MRHS
Main Turbine - TG and its Auxillaries, TG BOP (Offsite), O&M of HVAC System &
Electrical - Motor/Control/Switchyard and
C&I System , Testing & Communication
(The above works to be carried out through Minimum Manpower defined in the schedule)
As per annexure - 1 | 51,63,935.28 | 24 Months | 63,19,624 ₹17,89,71,751.68 |
| 2.00Preventive / Breakdown and other Maintenance works of following areas of 2x600 MW, PH-I SSTPP, Dongalia: Boiler Pressure Part, Boiler Non Pressure Part, Main Turbine - TG and its Auxillaries, TG BOP (Offsite), HVAC System & Electrical - Motor/Control/Switchyard and C&I System , Testing & Communication (The above works to be carried out on per Job basis with separate Manpower/resources) As per annexure - 2 | ||||
| 2.01BOILER PRESSURE PARTS | ||||
| 2.01SECTION-A | ||||
| 2.02CLEANING OF BOILER | ||||
| 2.02 | Complete External Cleaning of Boiler from Top to Bottom | 4 | LS | 61,092.49 ₹2,88,356.56 |
| 2.02 | Cleaning of Ash in Dead Chamber, Penthouse, Cat House | 4 | JOB | 43,637.49 ₹2,05,968.96 |
| 2.03PREPARATION OF SCAFFOLDING | ||||
| 2.03 | Preparation of Scaffolding in Boiler Horizontal Pass (Including GoosneckPart, Screen Tubes , TT Coil , Reheater Coils) | 16 | JOB | 21,818.75 ₹4,11,938.08 |
Tender Value
₹24.3 Cr
EMD Value
₹24.3 L
Closing Date
6 Apr 2026, 3:30 pmClosed
SE(Works)
O/o Addl.C.E.(PnW)
Comprehensive Maintenance Contract for BTG of 2X600 MW units SSTPP MPPGCL Dongalia for a period of two years
2026_MPPGC_478034_1
WT-2949
Open Tender
Miscellaneous Works
730 days
SSTPP, Dongalia
as per NIT
22 documents required · 22 mandatory
₹5,000
Yes
₹24.3 L
Yes
13 Jul 2026
17 Feb 2026
8 Apr 2026
17 Feb 2026
6 Apr 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SSTPP, KHANDWA | |||||
| 0.000 | Routine/Preventive/Scheduled/Minor outage Maintenance of following areas of 2x600 MW, PH-I SSTPP, Dongalia:
Boiler Pressure Part, Boiler Non Pressure Part, O&M of MRHS
Main Turbine - TG and its Auxillaries, TG BOP (Offsite), O&M of HVAC System &
Electrical - Motor/Control/Switchyard and
C&I System , Testing & Communication
(The above works to be carried out through Minimum Manpower defined in the schedule)
As per annexure - 1 | 51,63,935.28 | 24 Months | - | - |
| 0.000 | Preventive / Breakdown and other Maintenance works of following areas of 2x600 MW, PH-I SSTPP, Dongalia:
Boiler Pressure Part, Boiler Non Pressure Part,
Main Turbine - TG and its Auxillaries, TG BOP (Offsite), HVAC System &
Electrical - Motor/Control/Switchyard and
C&I System , Testing & Communication
(The above works to be carried out on per Job basis with separate Manpower/resources)
As per annexure - 2 | - | - | - | - |
| 0.999 | BOILER PRESSURE PARTS | - | - | - | - |
| 0.000 | SECTION-A | - | - | - | - |
| 0.000 | CLEANING OF BOILER | - | - | - | - |
| 0.999 | Complete External Cleaning of Boiler from Top to Bottom | 4 | LS | - | - |
| 0.999 | Cleaning of Ash in Dead Chamber, Penthouse, Cat House | 4 | JOB | - | - |
| 0.999 | PREPARATION OF SCAFFOLDING | - | - | - | - |
| 0.000 | Preparation of Scaffolding in Boiler Horizontal Pass (Including GoosneckPart, Screen Tubes , TT Coil , Reheater Coils) | 16 | JOB | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.14 MB
Tendernotice_2.pdf
PDF • 0.23 MB
BOQ_565636.xls
BOQ • 0.67 MB
ShortNIT478034.pdf
Tender Documents • 0.12 MB
DetailedNIT478034.pdf
Tender Documents • 0.22 MB
TenderSchedule478034.pdf
Tender Documents • 3.51 MB
AnnexuresP478034.pdf
Tender Documents • 1.76 MB
Credentials478034.xls
Additional Documents • 0.09 MB
NEWSBDworkservices478034.pdf
Tender Documents • 30.17 MB
TechnicalBiD-478034.xls
Additional Documents • 0.32 MB
11217.pdf
PDF • 0.37 MB
10994.pdf
PDF • 0.36 MB
10779.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid