Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-Finance | L1 | Accepted-Finance Lowest Rate |
Tender Value
₹9.2 L
EMD Value
₹92,300
Closing Date
6 Jul 2026, 1:00 pmClosed
Executive Officer
NPP MAU
WARD NO 12 NIZAMUDDIN PURA ME SRIRAM BHAWAN KE SAAMNE SE RAMESH GUPTA KE MAKAN TAK INTERLOCKING ROAD WA NALI NIRMAN KARYA.
2026_DOLBU_1126045_3
65-11
Open Tender
Civil Works
Percentage
120 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,040
Executive Officer
₹92,300
25 Jul 2026
29 Jun 2026
6 Jul 2026
29 Jun 2026
6 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clerance including labour and matrials
and including grass cutting /Dressing and
carrage of matrials by Head load | 1 | JOB | 10,000 | ₹10,000 |
| 2 | Dismenteling of old Damaged
interlocking tiles with all comp.NSI | 45 | SQM | 8.6 | ₹387 |
| 3 | Dismenteling of Brick Work including
Stacking of materials as directed by the
Engineer-in-Charge with the distance of
60.00m. Work SI No. 692 | 13.49 | CUM | 435 | ₹5,868.15 |
| 4 | E/W in Excavation in ordenery soil in
foudation including labour and matrials
and T/P with all com. Work SI No. 251 | 62.82 | CUM | 115 | ₹7,224.3 |
| 5 | C.C. Work in 1:6:12 in cement, fine sand
and 40 mm Gauge Brick Ballast including
labour and matrials , T/P with all com.
Work SI No. 273 | 10.92 | CUM | 3,250 | ₹35,490 |
| 6 | M-150 B/W in 1:4 in cement and coar sand
mortar including labour and matrials , T/P
with all com. Work SI No.305
DEDUCTED TO OLD BRICKS & BATS RS. 17911.00 | 19.45 | CUM | 4,980 | ₹96,878 |
| 7 | 12mm thick Plaster work in 1:3 in cement
and fine sand mortar including labour and
matrials, T/P with all com. Work SI No.583 | 90.6 | SQM | 189 | ₹17,123.4 |
| 8 | R.C.C. Work in 1:1.5:3 in cement coarse
sand and 20mm gauge including labour
and matrials, T/P with all com. Work SI
No.285 | 1.64 | CUM | 9,430 | ₹15,465.2 |
| 9 | MS work in R.C.C. work including
labour and matrials , T/P with all com.
Work SI No.504 | 1.29 | QTL | 5,650 | ₹7,288.5 |
| 10 | E/W filling in embankment with cartage soil
up to 8.00 km distances etc com. | 115.76 | CUM | 301 | ₹34,843.76 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
tech6502.pdf
Tender Documents • 1.71 MB
BOQ_2183780.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .