Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 CrAccepted-AOC | ₹2.5 Cr | 1 | Accepted-AOC RANK 1 |
| 2 | 2₹2.5 Cr+₹1.4 L (0.58%)Rejected-Finance | ₹2.5 Cr+₹1.4 L (0.58%) | 2 | Rejected-Finance REJECT |
| 3 | 3₹2.5 Cr+₹2.0 L (0.83%)Rejected-Finance 357 KOTKAPURA ROAD STREET NO 8 MUKTSAR PUNJAB 152026 | SRI MUKTSAR SAHIB | PUNJAB | 152026 | ₹2.5 Cr+₹2.0 L (0.83%) | 3 | Rejected-Finance REJECT |
| 4 | 4₹2.5 Cr+₹2.5 L (1.00%)Rejected-Finance HOUSE NO 40 E PARTAP NAGAR PATIALA | PATIALA | PUNJAB | 140401 | ₹2.5 Cr+₹2.5 L (1.00%) | 4 | Rejected-Finance REJECT |
| 5 | 5₹2.6 Cr+₹11.7 L (4.73%)Rejected-Finance 47 C MODEL TOWN EXTENSION LUDHIANA PB | LUDHIANA | PUNJAB | 141001 | ₹2.6 Cr+₹11.7 L (4.73%) | 5 | Rejected-Finance REJECT |
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
21 Feb 2024, 9:00 amClosed
EXECUTIVE ENGINEER LUDHIANA AND GROUND WATER DIVN
EXECUTIVE ENGINEER LUDHIANA AND GROUND WATER DIVN WRD PB LDH DUGRI P 1 NEAR DUGRA MATA MANDIR LDH
Estimate for concrete Lining of 6-R Distributary from RD 0-142700 (Reach RD 98200-124295)
2024_WR_116694_3
435/28A
Open Tender
Civil Works
Item Wise
90 days
ZIRA (FEROZEPUR)
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹4.8 L
Yes
EXECUTIVE ENGINEER LUDHIANA AND GROUND WATER DIVN
19 Mar 2024
1 Feb 2024
21 Feb 2024
1 Feb 2024
21 Feb 2024
1 Feb 2024
9 Feb 2024
Amount
Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge upto 9cum/s including boundary road :- ((a)) Discharge upto 1.5 cum/s
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m.
Dressing of earth work (6.3) Dressing of earth work ((i)) New work or remodeling work.
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads ((b)) Disposal/ carraige additional beyond 1m upto 3.49Km
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :- ((a)) 0 to 1.5 m depth
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :- ((b)) depth exceeding 1.5 ms but upto 3.0 ms.
Dressing side slopes and preparation of sub grade for lining.
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes
Filling expansion joints with special impervious hot pour 12.5mm wide.
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) - For Lining
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)- For Sleepers
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)- For Coping
Extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing including cost of rolling and watering as per specifications
Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering) including attached pilasters, buttresses etc when curved.
FILLING CONTRACTION JOINT WITH SEALING COMPONENT COMPLETE IN ALL RESPECT
Dag belling single kassi stroke complete in all respect
Providing and Laying 250 mm wide LDPE film 150 microns over sleeper
Extra bitumen painting at 0.69 Kg. per sqm
Providing & Fixing Distance Marks: C. Conc. 1:3:6 (M-10) with stone ballast using concrete mixer volume metric type
R.C. Conc. 1:2:4 (M-15) with stone ballast using concrete mixer volume metric type
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete.
Providing & Fixing Outlets Patrolling Side: Earth work involved in dismantling open flume A.P.M. or O.S.M. type outlets with 'H' more than 0.50 m but upto 0.90 m (including excavation, refilling, consolidation and dressing) .
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling with 'H' more than 0.50 m but upto 0.90 m.
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.50 m but upto 0.90 m.
PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
RCC M-20 in superstructure
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete.
Providing & Fixing Outlets Non-Patrolling Side: Earth work involved in dismantling open flume A.P.M. or O.S.M. type outlets with 'H' more than 0.50 m but upto 0.90 m (including excavation, refilling, consolidation and dressing) .
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling with 'H' more than 0.50 m but upto 0.90 m.
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.50 m but upto 0.90 m.
PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
RCC M-20 in superstructure
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete.
HEMANT KUMAR CONTRACTOR
M/S ASHOK KUMAR CONTRACTOR
NARESH KUMAR DUGGAL
MANMOHAN SINGH CONTRACTOR
PP ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .