| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.3 LAccepted-AOC | L1 | Accepted-AOC Allotted | |
| 2 | L2₹83.1 L+₹2.8 L (3.55%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹91.0 L+₹10.7 L (13.3%)Rejected-Finance | L3 | Rejected-Finance EMD Release | |
| 4 | L4₹91.3 L+₹11.0 L (13.7%)Rejected-Finance | L4 | Rejected-Finance EMD Release | |
| 5 | L5₹95.2 L+₹14.9 L (18.6%)Rejected-Finance | L5 | Rejected-Finance EMD Release |
Tender Value
₹89.7 L
EMD Value
₹1.8 L
Closing Date
3 May 2021, 5:00 pmClosed
EE PD1 Hisar
Rajgarh road opposite congress
Special Repair of Jakhod Khera to Migni Khera road RD 0.00 to 0.600 in Hisar Distt (Road ID 4899)
2021_HRY_169204_1
Special Repair of Jakhod Khera to Migni Khera road
Open Tender
Civil Works
Item Wise
120 days
Hisar
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹1.8 L
Yes
SE Hisar Circle Hisar
9 Jul 2021
20 Apr 2021
4 May 2021
20 Apr 2021
3 May 2021
20 Apr 2021
22 Apr 2021
Amount
Milling of distress bituminous layer upto 40mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 sqm area per Hr.) fitted with loading conveyor for loading the milled material directly on the trucks i/c hauling and stock piling the reclaimed material near the central recycling plant or reclaiming to bring to required specification to reuse with the approval of Engineer-in-Charge for safe disposal with all leads and lifts complete in all respects. Note I:- The unutilized quantity of reclaimed bituminous mix material shall be a recovery item as mention in BOQ item No. 22.
Earth work excavation in ordinary soil exclusive of compensation of earth-earth-work undressed with a combined lead upto 15 metres including breaking of clods. (HSR 6.2b) , and re-compact the same including laying , dressing, watering & rolling as per HSR 6.2 g-i, g-iii & g-v
Dismantling Brick Work, Tile Masonry or Tile Lining and Tile Terracing (HSR 8.5 (i) dry brick work.
Preparation of sub grade including trenching, rough dressing of soil, final dressing of earth, to given levels and camber, watering, rolling with road roller, and compacting the bed (HSR 24.1) Note: - In widening portion sub grade will be prepared with the use of Baby roller (HSR 24.1) or width of excavation should be made sufficient wide to accommodate road roller. Extra width required for compaction of sub grade shall not be paid and its expenditure shall be in incidental to the work.
Providing and laying 150 mm thick granular sub base consisting of drainage cum filter layer confirming to Table 400.1 Grading –III &VI of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MoRT&H specifications. Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing & laying 300mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam in layer of 75mm using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing and laying 80mm thick ISI marked interlocking paver blocks confirming to IS: 15658:2006/IRC SP 63-2004 of all shapes and colours in design mix cement M-40 over a bed of 30 mm thick fine sand complete in all respects. [HSR 10.159]
Manufacturing, supplying and laying of precast cement concrete rectangular block (0.45 M x 0.30 M x 0.15 M ) M-30 grade using minimum cement concrete 340 Kg/ per cum with digital batching plant duly compacted with table vibration including setting in position over bed prepared with 25mm thick fine sand and filling up the joints with fine sand (NS)
Earth work in excavation in foundations, trenches, etc. in all kinds of soils, not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres. (HSR 6.6)
Cement concrete 1 : 4 : 8 with stone aggregate 40 mm Nominal size in foundation and plinth.(HSR. 10.39)
Cement concrete 1:8:16 with brick ballast 40mm nominal size in foundation and plinth (HSR. 10.26)
Cement concrete 1; 2 ; 4 with stone aggregate 20 mm nominal size in foundation and plinth. (HSR. 10.41)
Cement concrete 1:1½:3 with stone aggregate 20 mm nominal size for reinforced concrete work in slabs with inclination not exceeding 25 degree with horizontal, excluding steel reinforcement, but including centering and shuttering , laid in position, complete in all respects. (HSR 10.82 + 10.95(a))
Steel reinforcement TMT bars FE-500 EQR/FE-500 D grade more for RCC work, where no included in the complete rate of RCC including straightening, bending, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. and placing in position complete in all respects for all heights/depths/storeys/basements etc. Note:- Reinforcement shall be measured in length including heoks, if any separately for different in diameters as actually used in work, excluding overlaps, wastage, overlaps, Couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other method for binding and placing shall not be measured and cost of these items shall be deemade to be included in the rates for reinforcement. (HSR 18.22)
First class brick work laid in cement sand mortar 1:4 in foundation and plinth. (HSR.11.4)
First Class brick work laid in cement sand mortar 1:5 in foundation and plinth (HSR.11.3)
Providing, lowering, cutting, jointing and testing 600mm dia RCC pipe Class NP-3 as per IS 458-2003 with Spigot and socketed joints manufactured with ISI marked Sulphate Resistance Cement as per ISI 12330 with rubber rings ISI marked , antitermite as required at site , into trenches, for all depths and laying out the same to correct alignments, gradients and levels including dressing and trimming and cutting of concrete beds and sides of trenches , if required , Jointing with rubber rings in trenches and jointing with 1:1 ½ cement sand mortar and with end dowels filled with 1:1 ½ cement sand mortar and finishing the joints at angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in (HSR item No 29.38,29.44,29.45 & 29.46) including cartage , loading and unloading complete in all respects. Note:- Contractor shall supply bill of manufacture of pipes. Pipes should bear name of manufacturer and ISI mark along with bill duly valid ISI certificate of manufacturer should be supply. Without these bills certificate no payment shall be released.
12 mm thick cement plaster 1:3 (HSR.15.4)
Striking joints in lime or cement on brick and tile walls (HSR. 15.69 (a)
Earth filling under floor with surplus soil, excavated from foundation and taken only from cutside the building plinth, in 15cm layers including ramming watering and consolidating lead upto 30 metres (HSR. 6.13 a)
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painted as per column mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect.
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- Bituminous mix material @ Rs.1402/- P.Cum.
Good Bricks @Rs. 4.50/- Each
Bricks Bats @450/- P. Cum Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price. Note :- In Case of any discrepancy in nomenclature / unit of items of BOQ depicted in the DNIT, the nomenclature / unit of MoRT&H (5th Revision) / HSR & NS Items shall be applicable as per norms
Jussu Construction Company
Kewal Krishan Chawla Contractor
Baljeet Kaswan Contractor
THE MANDI ADAMPUR GOLDEN L AND C SOCIETY LTD
Nirmal Singh contractor
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .