Tender Value
Refer Docs
EMD Value
₹47.4 L
Closing Date
28 Jul 2026, 5:00 pm
SE ETDC
10th Floor, Shakti Bhawan Extension, 14 Ashok Marg, Lucknow 226 001
Design Engineering Manufacturing Testing Supply Stringing Installation Testing Commissioning etc for Construction of 132 KV and 220 KV Transmission lines on ACSR Panther and Zebra conductor (approx 94.86 route Kms) of UPPTCL on Turn-key
2026_PTRCL_1166298_1
TD-537/26
Open Tender
Electrical Works
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Dy. GMHeadQuarterPaymentUnitUPPTCL
₹47.4 L
Yes
4 Jul 2026
4 Jul 2026
29 Jul 2026
4 Jul 2026
28 Jul 2026
4 Jul 2026
Schedule-3 Summary
Tender Inviting Authority: Superintending Engineer, Electricity Transmission Design Circle, 10th Floor, Shakti Bhawan Extension, 14-Ashok Marg, Lucknow-226001
Name of Work: Design, Engineering, Manufacturing, Testing, Supply, Stringing, Installation, Testing & Commissioning etc. for Construction of various 132 KV and 220 KV Transmission lines (approx. 94.86 route Km) of UPPTCL, on Turn-key basis
Tender No: TD-537/26
Bidder Name & Address :
SCHEDULE OF QUANTITIES AND PRICES
1 Total Price for Supply [Schedule S-1 ]
2 Total Price for Work [Schedule S-2 ]
3 Total Price [S-1+S-2]
Total Bid Price including GST [3+4]
Date: Signature
Name & Address of Company
SCHEDULE S-1 : (SUPPLY OF MATERIAL)
Tender Specification No.: TD-537/26 Name of Firm:
S N Item Unit QTY Ex-Work per unit rate (Rs.) Freight (Rs.) P&F (Rs.) INS (Rs.) Unit FOR Destination rate (5+6+7+8)(Rs) Total Amt (Exclusive of GST) (Rs.)
a Fabrication, galvanizing, Inspection and supply of DC towers including stubs, extension and stub-setting templates, gantry structures as per drawings & BOM
(i) Mild steel MT 0.799
(ii) High Tensile Steel MT 63.82
b Hot dip galvanized, Hexagon round hexagon head transmission tower Bolts Nuts and washers for above structures as per BOM MT 0.599
2 TOWER ACCESSORIES
(a) Number Plate Nos. 358
(b) Danger Plate Nos. 358
(c) Phase Plate in sets of red, blue and yellow for Tension towers Nos. 567
(d) Bird Guard for towers Nos. 632
(e) Pipe type earthing material for towers Nos. 488
3 (i) Porcelain Disc Insulators
(a) 70 KN Nos. 3655
3 (ii) Polymer Insulators/Composite silicon rubber insulator string
(a) 70 KN suitable for 132 KV suspension fitting per string 100
(b) 70 KN suitable for 220 KV suspension fitting per string 276
(c) 120 KN suitable for 132 KV suspension fitting per string 460
(d) 160 KN suitable for 220 KV suspension fitting per string 348
4(i) HARDWARES SUITABLE FOR ACSR PANTHER
(a) Single suspension fittings Nos. 361
(b) Single Tension fittings Nos. 1284
(c) Double suspension fittings Nos. 46
(d) Double Tension fittings Nos. 128
4(ii) HARDWARES SUITABLE FOR ACSR Zebra
(a) Single suspension fittings Nos. 255
(b) Single Tension fittings Nos. 327
(c) Double suspension fittings Nos. 18
(d) Double Tension fittings Nos. 42
5(i) CONDUCTOR ACCESSORIES SUITABLE FOR ACSR PANTHER
(a) Vibration Dampers Nos. 2615
(b) Mid Span compression Joint Nos. 354
(c) Repair sleeves Nos. 245
(d) Performed Armour Rod Nos. 424
5(ii) CONDUCTOR ACCESSORIES SUITABLE FOR ACSR Zebra
(a) Vibration Dampers Nos. 848
(b) Mid Span compression Joint Nos. 103
(c) Repair sleeves Nos. 30
(d) Performed Armour Rod Nos. 267
(a) 48 Fibre (DWSM) OPGW Fibre Optic Cable route km 0.799
(b) Supply & Installation of Hardware set for 48 Fibre (DWSM) OPGW* route km 100.06
(c) Joint box (48 Fibre) Nos. 47
(d) FODP 96F Nos. 9
(e) Fibre Optic Approach Cable for 48 F OPGW route km 8
(f) Supply & Installation of hardware set for 48 Fibre(DWSM, G.652D) Fibre Optic Approach Cable* route km 8
7 Maintenance equipment (Laptop with all necessary Software (Dell/HP) Nos. 3
GST@18%(mailto:GST@18%25塹ᴻ䡿ⲯ嶂藄挧ꮥ)
* GST shall be paid extra (applicable at the time of supply/work) on total of Ex-Works, Packing and Forwarding, Transportation and Insurance Charges. Present rate of GST on work contract is 18%.
Date: Bidder Name:
Name & Address of Company
* One set of installation hardware set shall contain all installation hardware fittings& accessories as may be required for 1 km of OPGW/Fibre Optic Approach Cable
* GST shall be paid extra (applicable at the time of supply/work) on total of Ex-Works, Packing and Forwarding, Transportation and Insurance Charges. Present rate of GST on work contract is 18%.
Date: Bidder Name:
Name & Address of Company
SCHEDULE-S-2 (Erection work)
Tender Specification No.: TD-537/26 Name of Bidder(Firm):
SN DESCRIPTION UNIT Qty Unit Rate Amount Ecxclusive of GST (Rs.)
1(i) Survey including preparation of schedule of materials, marking of locations (Route length),GPS Survey of line with co-ordinates of each tower(The length of line shall be authenticated by GPS Survey) Km 94.863
1(ii) Check survey Km 94.863
1(iii) Soil testing Locs. 284
2(i) Cost of excavation of 132 KV tower foundation pits including all earth work,backfilling, levelling etc. Cu.m. 38305.347
2(ii) Cost of excavation of 132 KV tower foundation pits in hard rock including all earthwork, backfilling,levelling etc Cu.m. 479.61
2(iii) Cost of excavation of 220 KV tower foundation pits including all earth work,backfilling, levelling etc. Cu.m. 12723.95
3 Design of 132 KV DC CT Tower with extension, nuts bolt and ladders etc on ACSR Panther conductor and its foundation Job 1
4 Cost of complete foundation work for 132KV DC CT tower including cost of cement coarse, sand , stone grid,dewatering,shoring and shuttering, forming,curing but excluding cost of reinforcement bars Job 1
5 Setting of stubs including all foundation work but excluding the cost of concerting and excavation (Rate per location) for following towers :
i 132 KV DA Nos. 86
ii 132 KV DB Nos. 79
iii 132 KV DC/DE Nos. 101
iv 132 KV NBDC Nos. 1
v 220 KV DA Nos. 40
vi 220 KV DB Nos. 13
vii 220 KV DC/DE Nos. 13
viii RC Tower Nos. 2
6 Cost of concreting for all types of tower foundation including cost of cement,dewatering,shoring and shuttering,forming,curing but excluding cost of reinforcement bars
i 1:2:4 concreting Cu .m. 9955.199
(ii) 1:1.5:3 concreting Cu .m. 544.78
7(i) Erection of Superstructure of 132KV Towers and Anchor tower and their extensions wherever required including all work above ground level excluding hoisting of insulators, hardware & accessories, but including fitting of danger number, phase plates, bird guard and fixing & punching for 132KV SC/DC lines MT 1658.3029999999999
7(ii) Erection of Superstructure of 220KV Towers , RC Towers, Anchor tower and their extensions wherever required including all work above ground level excluding hoisting of insulators, hardware & accessories, but including fitting of danger number, phase plates, bird guard and fixing & punching for 220KV SC/DC lines MT 594.97
8 Tack welding of all the bolts up to the height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 1200seperatiion of minimum 10 mm thickness with 10mm/12 mm electrode & application of Zinc rich Aluminium paint on the affected surface including cost of all material including tack welding of River Crossing tower & Anchor towers. per bolt 151202
9(i) Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Panther’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all Six phases of 132 KV DC lines per route Km 25.02
9(ii) Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Panther’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on TWO phases of 132 KV SC lines per route Km 37.007
9(iii) Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Panther’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all Three phases of 132 KV SC lines per route Km 10.511
9(iv) Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Zebra’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all Six phases of 220 KV DC lines per route Km 20.7
9(v) Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Zebra’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all Six phases from anchor to anchor span using 220 KV River crossing towers per route Km 1.16
10 Laying, stringing, tensioning, clamping, jointing,including fittings of all necessary Hardware and accessories of OPGW & OFAC,installation of FODP, termaination at S/s, end to end connectivity & testing etc on 132KV & 220 KV lines per route Km 97.887
11 (a) Grounding work including earth work etc for pipe type grounding including cost of coke & salt. Nos 379
(b) Grounding work including earthwork etc for counterpoise grounding materials including cost of all material Nos 5
12 Installation of steel reinforcement bars in R.C.C. foundation including cost of steel reinforcement bars with cutting, bending, placing, binding etc. MT 95.503
13 Dismantiling of old existing earthwire with all accessories including re-rolling of dismantled earthwire on empty drums for reuse and shifting of all material from site to store. per route Km 3.5
14 Dismantling of old existing All 3 Phases of ACSR Panther Conductor with all accessories including re-rolling of dismantled conductor on empty drums for reuse and shifting of all material from site to store. per route Km 3.5
15 Dismantling of old existing 132kV Tower with all accessories including shifting of all material from site to store. MT 50
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
sbdTD-537.pdf
Tender Documents • 6.07 MB
boq final.xls
Additional Documents • 0.10 MB
Download all tender documents and submit your bid