Loading…
Loading…
Tender Value
₹30.0 L
EMD Value
₹3.0 L
Closing Date
3 Aug 2026, 3:00 pm
chief engineer
chief engineer
Construction of RCC nala with cover from sukhija provision stor and neeraj sahni house in gopal nagar ward no. 19
2026_NNSAH_1170078_1
6119 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
₹3.0 L
19 Jul 2026
19 Jul 2026
4 Aug 2026
19 Jul 2026
3 Aug 2026
19 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of old brick work or stone work including labour T&P etc all complete | 25.05 | cum | 400 | ₹10,020 |
| 2 | Dwater wate up to deep groung level rate in all work complete | 45 | No | 2,601 | ₹1,17,045 |
| 3 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M and lead upto 30 M and including filing watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenchs or into the plinth and removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30 M from the foundation trenches SOR UP PWD S1-251A) | 873.62 | cum | 90 | ₹78,625.8 |
| 4 | Extra rate for earth work and excation in all work complete | 873.62 | Cum | 22.5 | ₹19,656.45 |
| 5 | Disposel of surplus earth malba etc. including all work complete. (anallises Rate) | 698.9 | cum | 130 | ₹90,857 |
| 6 | Supply and laying of 40 mm thick brick in all work complete | 54.45 | Cum | 800 | ₹43,560 |
| 7 | Supply and filling local send in all work complete | 72.6 | cum | 380 | ₹27,588 |
| 8 | C.C 1:6:12 with in cement and fine sand and 4 cm gauge brick ballast in all work complete. | 47.19 | cum | 2,985 | ₹1,40,862.15 |
| 9 | R.C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit all work complete | 128.97 | cum | 7,400 | ₹9,54,378 |
| 10 | Mild steel in plain such as RCC and rb in work complete | 10,124.15 | KG | 85.29 | ₹8,63,488.75 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.28 MB
BOQ_2195513.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid