Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC CONGRESS NAGAR PATHAKHERA DISTRIC BETUL MADHYA PRADESH PIN 460449 | PATHAKHERA | BETUL | MADHYA PRADESH | 460449 | L1 | Accepted-AOC The work is awarded to Pradeep Kumar sinha being the lowest bidder | |
| 2 | L2₹16.0 L+₹8,837.26 (0.56%)Rejected-Finance ARAZI NO 1144 LOT NO 48D DAHELI SUJANPUR BHAWANI NAGAR DAHELI SUJANPUR BHAWANI NAGAR KANPUR KANPUR NAGAR UTTAR PRADESH 208013 | KANPUR NAGAR | UTTAR PRADESH | 208013 | L2 | Rejected-Finance Bidder quoted bid is higher than L1 | |
| 3 | L3₹16.2 L+₹32,894.25 (2.07%)Rejected-Finance WARD NO 36 MAHAVIR WARD BAGDONA DIST BETUL M P 460 449 | BAGDONA | BETUL | MADHYA PRADESH | 460449 | L3 | Rejected-Finance Bidder quoted bid is higher than L1 | |
| 4 | L4₹16.7 L+₹79,780.82 (5.03%)Rejected-Finance CAMP CIVIL LINE NOWROZABAD DISTT UMARIA MADHYA PRADESH 484555 | NOWROZABAD | UMARIA | MADHYA PRADESH | 484555 | L4 | Rejected-Finance Bidder quoted bid is higher than L1 | |
| 5 | L5₹16.9 L+₹1.1 L (6.73%)Rejected-Finance HN 32 SATPURA NAGAR MAIN ROAD BAGDONA PATHAKHERA DISTT BETUL MADHYA PRADESH 460449 | BETUL | MADHYA PRADESH | 460449 | L5 | Rejected-Finance Bidder quoted bid is higher than L1 |
Tender Value
₹24.5 L
EMD Value
₹30,700
Closing Date
10 Aug 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (Civil)
Staff Officer (Civil), G.M. Office, WCL Pathakhera Area, P.O. Pathakhera, District Betul, Madhya Pradesh, PIN 460449
Construction of Primary school/Anganwadi in Hirapala village of Bhogaikhapa Panchayat
2026_WCL_362820_4
PK3550-CIV-E-08-2026-27
Open Tender
Civil Works - Others
Percentage
150 days
Pathakhera Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹30,700
5 Oct 2026
31 Jul 2026
11 Aug 2026
31 Jul 2026
10 Aug 2026
31 Jul 2026
31 Jul 2026 - 7 Aug 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Item Code 15.2.2
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) | 7.5 | Cum | 842.1 | ₹6,315.75 |
| - | Item Code 15.7.4
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge In cement mortar. | 18 | Cum | 1,153.7 | ₹20,766.6 |
| - | Item Code 15.12.1
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc.complete and stacking within 50 metres lead :Of area 3 sq. metres and below | 6 | Each | 211.65 | ₹1,269.9 |
| - | Item Code 15.3
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable
material within 50 metres lead as per direction of Engineer - in- charge. | 5.35 | Cum | 1,990.7 | ₹10,650.24 |
| - | Item Code 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 60.5 | Cum | 188.5 | ₹11,404.25 |
| - | Item Code 4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources | 15.15 | Cum | 5,052.05 | ₹76,538.56 |
| - | (Item Code 5.1.2)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering,finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 12.5 | Cum | 7,154.05 | ₹89,425.63 |
| - | (Item Code 5.2.2)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6 | Cum | 8,200.9 | ₹49,205.4 |
| - | (Item Code 5.3)
Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 31.6 | Cum | 8,540.45 | ₹2,69,878.22 |
| - | (Item Code 5.9.1)
Centering and shuttering including strutting, propping etc. andremoval of form for Foundations, footings, bases of columns, etc. for mass concrete. | 25 | Sqm | 260.1 | ₹6,502.5 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_375751.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .