Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.4 LAdmitted-Finance | -45.98% | ₹5.4 L | L1 | Admitted-Finance |
| 2 | L2₹5.8 LAdmitted-Finance | -42.00% | ₹5.8 L | L2 | Admitted-Finance |
| 3 | L3₹6.3 LAdmitted-Finance | -37.20% | ₹6.3 L | L3 | Admitted-Finance |
| 4 | L4₹6.4 LAdmitted-Finance | -36.37% | ₹6.4 L | L4 | Admitted-Finance |
| 5 | L5₹6.4 LAdmitted-Finance | -36.00% | ₹6.4 L | L5 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
13 Feb 2026, 6:00 pmClosed
XEN PWD RAMNAGAR
XEN PWD RAMNAGAR
PLEASE REFER TO BOQ
2026_PWDJK_302512_15
e-NIT No. 47 of 2025-26 Dated- 06-02-2026
Open Tender
Civil Works
30 days
RAMNAGAR
PLEASE REFER TO NIT
2 documents required · 2 mandatory
₹600
XEN PWD RAMNAGAR
₹20,000
2 Mar 2026
7 Feb 2026
14 Feb 2026
7 Feb 2026
13 Feb 2026
7 Feb 2026
Earth work in excavation by mechanical means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Dumping stone Including cost of stones. in Horizontal on level
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with.1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)with 20% Plum.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) with 20% Plum.
Dry random rubble masonry with hard stone in foundation and plinth: without bond stone
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc.
slip clearance In ordinary soils disposal lead upto 50 m and lift upto 1.5 m
12mm Cement plaster of mix 1 : 6 ( 1 cement : 6 coarse sand)
Carriage of sand an avg. distance 85.0 km.
Carriage of stone agg below 40mm avg distance 20 km.
Carriage of stone agg above 40mm avg distance 20km.
Carriage of stone an avg lead 5 km
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_981836.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid