| 1 | L1₹6.7 LAccepted-AOC | ₹6.7 L | L1 | Accepted-AOC Less Quoted Estimate Rate |
| 2 | L2₹6.9 LRejected-AOC THIRU K RISHIKESAVAN CONTRACTOR WALAJABAD KANCHEEPURAM DISTRICT | ₹6.9 L | L2 | Rejected-AOC Above Quoted Estimate Rate |
| Sl No | Description | Qty | Unit | S.SELVAM L1 | K.RISHIJESAVAN L2 |
|---|---|---|---|---|---|
| 1.00Name of Work: Providing Cement Concrete Road to Nadu street in Athivakkam Panchayat under PMAGY 2025-2026 Est Amt 700000/- | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,. | 7.83 | Cum | 263 ₹2,059.29 | 303 ₹2,372.49 |
| 3.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 28.62 | Cum | 2,705 ₹77,417.10 | 2,745 ₹78,561.90 |
| 4.00 | Towards the labour charges for centering the C.C.Works including all other labour charges etc, complete. | 113.1 | Sqm | 547 ₹61,865.70 | 587 ₹66,389.70 |
| 5.00 | C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete. | 33.84 | Cum | 5,618 ₹1.9 L | 5,658 ₹1.9 L |
| 6.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 13.01 | Cum | 6,942 ₹90,315.42 | 6,982 ₹90,835.82 |
| 7.00 | Cement Concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 21.47 | Cum | 6,942 ₹1.5 L | 6,982 ₹1.5 L |
| 8.00 | Towards the cost and supply of 12mm thichness of Bituminous Pad etc, complete. | 4.19 | Sqm | 234 ₹980.46 | 274 ₹1,148.06 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,02,923.25 ₹1.0 L | 1,04,522.08 ₹1.0 L |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
19 Dec 2025, 3:00 pmClosed
BDO VP Walajabad
BDO VP Walajabad
Providing Cement Concrete Road to Nadu street in Athivakkam Panchayat in Walajabad Union
2025_RDTN_631208_1
5861/2025/A6 dt 10.12.25
Open Tender
Civil Works - Roads
BDO office Walajabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,000
30 Jan 2026
12 Dec 2025
19 Dec 2025
12 Dec 2025
19 Dec 2025
12 Dec 2025
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Towards the labour charges for centering the C.C.Works including all other labour charges etc, complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Cement Concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Towards the cost and supply of 12mm thichness of Bituminous Pad etc, complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_754884.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid