Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹4.9 L
EMD Value
₹9,720
Closing Date
12 Oct 2026, 6:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive engineer REW Jammu
Executive engineer REW Jammu
Construction work of Chupal sabha Dori Near Baba Mai Mal Dev Sathan, PANCHAYAT- DORI, BLOCK KHARAH BALLI UNDER THE SCHEME APDP FOR THE YEAR 2026-27.(Block Level)
2026_RDPR_327025_2
e-NIT No.679 REWJ of 2026-27 dated 03-10-2026
Open Tender
Civil Works
Percentage
Executive engineer REW Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Govt Tresurey
₹9,720
5 Oct 2026
5 Oct 2026
13 Oct 2026
5 Oct 2026
12 Oct 2026
5 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 0.51 | cum. | 2,516.85 | ₹1,283.59 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundation, drains, pipes cables etc. h and disposal of surplus excavated earth as directed with in lead 50mtrs neatly dressed in A.K.O.S. | 12.53 | cum. | 256.85 | ₹3,218.33 |
| 3 | P/L in position Cement conc. 1 cement:5fine sand: 10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 1.61 | cum. | 4,826.5 | ₹7,770.67 |
| 4 | P/L in position Cement conc. 1:1.5:3 mix for RCC Work using 20 mm N/Size Agg. For Column/Beams/Slab excluding the cost of centring & shuttering all work upto plinth level. | 2.86 | cum. | 7,788.4 | ₹22,274.82 |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.3 | cum. | 9,395.7 | ₹49,797.21 |
| 6 | Steel reinforcement for RCC work including straightening,cutting, bending and placeing in all position with complete binding. | 816.4 | KG | 123.2 | ₹1,00,580.48 |
| 7 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm for foundation excluding the cost of centring & shuttering all work upto plinth level. | 1.83 | cum. | 5,733.6 | ₹10,492.49 |
| 8 | Brickwork with common burnt clay (non modular bricks of class designation 7.5in foundation and plinth including curing in 1:6 mix mortar including extra for brickwork with common burnt clay bricks/cement conc. Bricks in super structure above plinth level upto floor five level. | 11.56 | cum. | 9,027.2 | ₹1,04,354.43 |
| 9 | Centring & shuttering including strutting, propping etc. and removal of the formwork. | 19.33 | sqm. | 286.35 | ₹5,535.15 |
| 10 | Columns, pillars, piers, abutments, posts and struts. | 7.43 | sqm. | 742.55 | ₹5,517.15 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1106075.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .