Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-Finance | ₹3.4 L | L1 | Accepted-Finance As Per TCR |
| 2 | L2₹3.5 L+₹6,086.63 (1.79%)Rejected-Finance | ₹3.5 L+₹6,086.63 (1.79%) | L2 | Rejected-Finance As Per TCR |
| 3 | L3₹3.5 L+₹9,142.83 (2.68%)Rejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | ₹3.5 L+₹9,142.83 (2.68%) | L3 | Rejected-Finance As Per TCR |
| Sl No | Description | Qty | Unit | MAA MANASA ENTERPRISE L2 | BELU GHOSH L1 | SABIR CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00Repairing of Boom stick eye | ||||||
| 1.01 | Cost of grousing Electroded | 18 | KG | 631 ₹11,358 | 619 ₹11,142 Lowest | 637 ₹11,466 |
| 1.02 | Cost of Ferrospeed Electroded | 1,200 | Pcs. | 12 ₹14,400 Lowest | 12 ₹14,400 Lowest | 12 ₹14,400 Lowest |
| 1.03 | DA(8.9 Cum per Cyl.) | 1 | Cyl. | 2,932 ₹2,932 | 2,874.7 ₹2,874.7 Lowest | 2,960 ₹2,960 |
| 1.04 | Oxygen(7.6 Cum per Cyl.) | 3 | Cyl. | 326 ₹978 | 319.2 ₹957.6 Lowest | 329 ₹987 |
| 1.05 | Cost of hard facing duoid electrode | 20 | KG | 680 ₹13,600 | 667 ₹13,340 Lowest | 687 ₹13,740 |
| 1.06 | Cost of 660NH L&T electrode | 15 | KG | 1,748 ₹26,220 | 1,714 ₹25,710 Lowest | 1,765 ₹26,475 |
| 1.07 | Cost of new making spacer plate with 30mm plate | 2 | No. | 3,059 ₹6,118 | 3,000 ₹6,000 Lowest | 3,089 ₹6,178 |
| 1.08 | Cost of fitment of Bush with hydraulic jack | 1 | Job | 8,158 ₹8,158 | 8,000 ₹8,000 Lowest | 8,238 ₹8,238 |
| 1.09 | Cost of grinding and machining charge | 1 | Job | 6,119 ₹6,119 | 6,000 ₹6,000 Lowest | 6,179 ₹6,179 |
Tender Value
₹3.4 L
EMD Value
₹4,300
Closing Date
25 Mar 2026, 9:00 amClosed
Area Engineer (Excv.)
Office of the General Manager, Pandaveswar Area, P.O.- Pandaveswr, Dist.- Burdwan, West Bengal-713346
Repairing of Boom stick Eye and various repairing work in BE1000 hydraulic Shovel sl. No. G-10214.
2026_ECL_356595_1
GM/PND/EXCV/2025-26/62/220
Open Tender
Excavation Department Work
Item Rate
7 days
Khottadih OCP
Please refer Tender documents.
8 documents required · 8 mandatory
₹4,300
28 Apr 2026
14 Mar 2026
26 Mar 2026
14 Mar 2026
25 Mar 2026
14 Mar 2026
14 Mar 2026 - 18 Mar 2026
Repairing of Boom stick eye
Cost of grousing Electroded
Cost of Ferrospeed Electroded
DA(8.9 Cum per Cyl.)
Oxygen(7.6 Cum per Cyl.)
Cost of hard facing duoid electrode
Cost of 660NH L&T electrode
Cost of new making spacer plate with 30mm plate
Cost of fitment of Bush with hydraulic jack
Cost of grinding and machining charge
Cost of Line Boring charge
Service Charge including PF @ 12.72% & Contractor Profit (2 nos. Skilled Labour for 2 shift for 3 Days, 3 Nos. Semi-skilled Labour for 2 shift for 3 Days and 3 nos. Un-skilled labour for 2 shift for 3 Days)
Consumable Profit @10% on Consumable(For Sl. No. 1.01 to 1.06)
Various reparing of BE1000
Cost of grousing Electroded
Cost of Ferrospeed Electroded
DA(8.9 Cum per Cyl.)
Oxygen(7.6 Cum per Cyl.)
Cost of joining electrode/special electrodes (Durochrome) 4 mm
Cost of joining electrode 660 NH L&T
Cost of guard mounting bolt and washer
Cost of Grinding & machining Charge
Service Charge including PF @ 12.72% & Contractor Profit (2 nos. Skilled Labour for 2 shift for 4 Days, 4 nos. Semi-skilled Labour for 2 shift for 4 Days and 3 nos. Un-skilled labour for 2 shift for 4 Days)
Consumable Profit @10% on Consumable (For Sl. No. 2.01 to 2.07)
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.65 MB
ANNEXURE.pdf
Tender Documents • 0.83 MB
BOQ_369451.xls
BOQ • 0.33 MB
GTC.pdf
Tender Documents • 1.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .