Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.9 LAccepted-AOC | L1 | Accepted-AOC Work awarded to techno commercially evaluated L1 bidder | |
| 2 | L2₹41.5 L+₹1.8 L (4.42%)Rejected-Finance 496665 | RAIGARH | CHHATTISGARH | 496665 | L2 | Rejected-Finance REJECTED AS L2 BIDDER | |
| 3 | L3₹54.9 L+₹15.1 L (38.0%)Rejected-Finance | L3 | Rejected-Finance REJECTED AS L3 BIDDER | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected in shortfall of Confirmatory Documents |
Tender Value
₹59.4 L
EMD Value
₹74,300
Closing Date
18 Jan 2024, 5:00 pmClosed
Staff Officer(Mining), Orient Area, MCL
Mining Department, Office of the General Manager, Orient Area, MCL, Brajrajnagar, Jharsuguda, Odisha
Recovery, Salvaging, Transportation and Installation of Drive Head, Belt structure, Pipe line, Track line and Endless Haulage at 144NL district Sec-III of Orient Colliery Mine No.1 and 2, OSA, OA, MCL.
2024_MCL_297461_1
MCL/GM/OA/SO(M)/2024/ NIT-215/003, Dtd-01.01.2024
Open Tender
Civil Works - Others
Item Rate
365 days
Orient Colliery-1 and 2 Mine, OSA, Orient Area
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹74,300
24 Feb 2024
2 Jan 2024
19 Jan 2024
3 Jan 2024
18 Jan 2024
3 Jan 2024
3 Jan 2024 - 11 Jan 2024
Amount
Carting of coal/shale/shaly coal in UG mine by manual labour including loading, unloading & stacking for lead upto 50 mt.
Excavation in Coal/shale in U/G mine by chiseling in trenches and drains for making notches in gallery including of serviceable material with a lead upto 30mtr &lift upto 1.5mtr including neat dressing of the roof floor and sides as per the instrction of the E.I.C .
Brick work 1:6 in foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the U/G mine site. (a)In foundation
(b)Transportation of materials for brick work to the working site.
a)Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing, reinforcement and carriage of materials from incline mouth to U/G mine site-All work upto plinth Level,(1:2:4).
(b)Transportation of materials for P.C.C work to the working site.
Recovery of Belt /Belt structure from 15D/138NL to 2D/138NL 136NL District.( H.R. Section – III) Transport from 144 NL Dist. ( H.R. Section – III)
Transportation of belt Conveyor From Surface to 144NL District HR Sec-III Belt Coveyor & Belt structure Length= [email protected]/Mtr. =41410.00Kg
Recovery of Rail by Cutting and Dismantling of rail in U/G Mine ( Labour Rate Only) 136NL Dist. HR Section-III
Transportation of Rail & wooden sleepers to the destination as per instruction of EIC.
Rail Wooden sleepers (including Collection)
Dismantling of pipes ( external work) including stacking of pipes eithin 50m lead above 40mm nominal bore.length – 450 x 2 = 900 Mtr.
Recovery and Transportation and Installation of Endless haulage pulley Item with it all accessories 75 HP, from 128NL/5R Section-IV to 143NL/17ND Section-III
Rcovery, installation & Transportation of drive head with all its accessories including loading, unloading from 138NL/15ND to144NL/15ND,144NL Dist. HR Sec-III the underground proposed site as per instruction of EIC(E&M).
Laying of haulage track line length of 730 Mtr Haulage Road Way From 18ND/139NL to 32NL/143NL HR Section-III Underground, with 30 Lbh Rail
Laying of Belt Conveyor 890Mtr. From 15ND/138NL to 15ND/144NL and 15ND/144NL to 33ND/144NL HR Section-III
Transport and Laying and fitting of 2” Pipe 810 x 2 = 1620Mtr Pipe line from 15ND/139NL to 32ND/143NL at 144NL Dist. HR Section-III.
Carriage of materials in U/G mine by manual including, loading, unloading and stacking of the materials lead-0-50m (Only labour Rate)1620mtr. 2” pipe
Shifting of haulage return pully from one site to another site in U/G for a distance of 120m
Shifting of Auxiliary Fan Along with starter & Air duct of 80m Length for a Distance of 40m.
Shifting of Single electrical circuit in a distence and their cables for a distance of 40m & support of cables (500m x 2 =1000m )
Recovery and Transportation of Endless haulage rope 1200mtr.from 128NL/5R to 16ND/135NL and installation from 144NL Dist. Section-III as per instruction of E.I.C. transportation of Endless haulage Rope 22mm dia, 1200mtr. as per instruction of E.I.C.
Total impact of GST for the purpose of CTC
SANTOSH KUMAR SINGH
BINOD KUMAR SAHU
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .