Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.4 LAccepted-Finance | ₹9.4 L | 1 | Accepted-Finance Being L1 |
| 2 | 2₹10.8 L+₹1.5 L (15.7%)Accepted-Finance | ₹10.8 L+₹1.5 L (15.7%) | 2 | Accepted-Finance Being L2 |
| 3 | 3₹11.1 L+₹1.8 L (18.9%)Accepted-Finance | ₹11.1 L+₹1.8 L (18.9%) | 3 | Accepted-Finance Being L3 |
| 4 | 4₹11.3 L+₹1.9 L (20.3%)Accepted-Finance RANGAT MIDDLE ANDAMAN | ₹11.3 L+₹1.9 L (20.3%) | 4 | Accepted-Finance Being L4 |
| 5 | 5₹11.4 L+₹2.0 L (21.5%)Accepted-Finance | ₹11.4 L+₹2.0 L (21.5%) | 5 | Accepted-Finance Being L5 |
Tender Value
₹15.2 L
EMD Value
₹30,321
Closing Date
19 Mar 2024, 12:00 pmClosed
Executive Engineer
Executive Engineer, CD-I, APWD, Rangat
Construction of drain from new Power House to Pump House at Rangat Bay Power House.
2024_APWD_13968_1
104/DB/CD-I/RGT/2023-24
Open Tender
Civil Works - Others
Item Rate
60 days
Nimbutala
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹30,321
26 Apr 2024
12 Mar 2024
19 Mar 2024
12 Mar 2024
19 Mar 2024
12 Mar 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete.
Providing,transporting, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete in shelves, including setting in cement mortar 1:3 (lcement : 3 coarse sand), cost of required centering, shuttering and finishing with neat cement punning on exposed surfaces but , excluding the cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
12 mm cement plaster of mix :
1:4 (1 cement: 4 fine sand)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.
40 mm thick with 20 mm nominal size stone aggregate
RAMU BHOOMI
AJAY KUMAR SHUKLA
RAM CHANDRA MONDAL
M SARAVANAN
M KARIKALAN
SELVAM RAJESH
K THANKACHAN AND SONS
M/s Excel Engineers Construction
RAJESH MUKHERJEE
Parimal Mondal
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .