Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14,700Accepted-Finance | 1 | Accepted-Finance The bidder has fulfilled the prerequisite formalities and stands qualified for the work. Hence the TOC (Tender Opening Committee) has unanimously decided to accept the price bid of the bidder | |
| 2 | 2₹15,000+₹300 (2.04%)Accepted-Finance | 2 | Accepted-Finance The bidder has fulfilled the prerequisite formalities and stands qualified for the work. Hence the TOC (Tender Opening Committee) has unanimously decided to accept the price bid of the bidder | |
| 3 | 3₹15,700+₹1,000 (6.80%)Accepted-Finance | 3 | Accepted-Finance The bidder has fulfilled the prerequisite formalities and stands qualified for the work. Hence the TOC (Tender Opening Committee) has unanimously decided to accept the price bid of the bidder |
Tender Value
Refer Docs
Closing Date
13 Aug 2021, 4:00 pmClosed
Executive Engineer PHE Mech. Div. South Awantipora
Executive Engineer PHE Mech. Div. South Awantipora
Rewinding of 17.50 HP Submersible Motor at water supply scheme Lajoora
2021_PHE_132945_6
JSD/PHE/MDSA/ e-NIT No. 17 of 2021-22
Open Tender
Repair and Maintenance Works
Item Rate
5 days
Lajoora
Please refer Tender documents.
2 documents required · 2 mandatory
₹50
Executive Engineer PHE Mech. Div. South Awantipora
Exempted
28 Aug 2021
4 Aug 2021
14 Aug 2021
4 Aug 2021
13 Aug 2021
4 Aug 2021
Amount
Repairs to 17.50 HP submersible motor by way of decoupling of damaged 17.50 HP 3-phase submersible motor from the pump motor assembly at site. Shifting the decoupled motor from site to the workshop in a private load carrier to be arranged by the firm. At workshop the motor shall be dismantled by way of opening all nuts, bolts, cover plates etc. and the damaged/burnt out windings shall be extracted from all stator slots by special tools & tackles, skilled manpower. After extraction of the windings from the stator the same shall be rewound by using PVC insulated Cu-wire of proper gauge and specification and as per actual pitch and turns. The job includes insulation of the windings by proper insulating material, tape etc. and assembling back of rotor, stator, cover plates, all nuts and bolts of the motor. The repaired motor shall be shifted back to site from workshop in a pvt. load carrier to be arranged by the firm and at site the motor shall be recoupled with the pump. All power connections shall be reconnected with the motor and pump motor assembly shall be lowered back into the bore well by refitting each of the column pipe one by one, tightening all the nuts and bolts & inserting the new RI cloth in between the flanges wherever required. After complete lowering the unit shall be tested on full load. The old copper shall be retained by the firm & shall quote the rates with rebate on account of old copper scrap
Providing/Fitting of LT bush rods for 50 KVA Voltage Stabilizer
M/S SUPREME ENTERPRISES
NATIONAL TRADING AND CONSTRUCTION COMPANY
tech_eval.pdf
fin_eval.pdf
finance_264718.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .