Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹17.0 L
Closing Date
17 Sept 2026, 2:00 pm
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
66 days
Expenditure
Capital (WMS)
26 conditions · 15 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N crores; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited.
The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The firm only can participate in the subject tender, who has successfully executed the subject work and/or similar nature of work. The definition of similar nature of work for subject work approved by the competent authority i.e. PCEE/ER/ KKK vide letter No. EL/112/0 dated 11.07.2019 is appended below:-
"Electrical, air- conditioning & associated items of AC & Non- AC Coaches for POH: Disconnection, Stripping, Unloading, Scrapping, Cleaning & washing with recommended cleaning agent, repairing as per condition, painting, shifting & transportation and loading & fitment along with disposal of unserviceable to nominated place.."
Technical Eligibility Criteria:
The tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited, any one of the following:
Three similar works costing not less than the amount equal to 30% of advertised value of the tender, or
Two similar works costing not less than the amount equal to 40% of advertised value of the tender, or
One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Documents testifying tenderer previous experience and financial status should be produced along with the tender. Tenderer(s) who is / are not borne on the approved list of the Contractors of ________ Railway shall submit along with his / their tender:
Certificates and testimonials regarding contracting experience for the type of job for which tender is invited with list of works carried out in the past.
Audited Balance Sheet duly certified by the Chartered Accountant regarding contractual payments received in the past.
The list of personnel / organization on hand and proposed to be engaged for the tendered work. Similarly list of Plant & Machinery available on hand and proposed to be inducted and hired for the tendered work.
The Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the Railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the Railway there under.
Non-compliance with any of the conditions set forth therein above is liable to result in the tender being rejected.
106 conditions · 7 needing a document upload
Contractor must ensure that all documents as per Check list attached in Document Section has been uploaded and complied in accordance to GCC or not, if applicable and the same should be uploaded along with the Offer duly signed by the bidder.
BOOK OF REFERENCE: General Conditions of Contract, 2022, hereinafter mentionedas GCC 2022, of Indian Railways. There will be an overall binding of Indian Railways;General Conditions of Contract, 2022; hereinafter or elsewhere mentioned as GCC,2022 amended/revised/ modified/corrected from time to time, irrespective of before orafter opening of this e-tender, upon the tender or contract.
The works are required to be completed within the specified period in NIT HEADER from the date of issue of acceptance letter.
Electronic tender box will be opened after the closing time as shown in the NIT/IREPS website, as per procedure. Tenderers shall not be required to be present in the Office of Dy. Chief Electrical Engineer (W)/Liluah for any e- Tender opening process. They can obtain totally transparent Bid Tabulation Statement by logging in IREPS website after tender opening. All the participating tenderers who will submit valid e- Tender offer can view their own offer details as well as tender tabulation statement after tender opening from any location using internet access by visiting the website: www.ireps.gov.in instantly after opening of the electronic tender box, by clicking on the icon. Railways do not guarantee opening of the tender on or after the specified date and time due to reasons beyond control of the Railway Administration. Hence the e-Tender can be opened after the specified due date and time also. It will, however, be ensured that no offer is submitted after the specified date and time for the subject e-Tender. Tenderers cannot submit/modify any offer or attach any file to it after the closing date and time as stipulated in the e-Tender Notice. IREPS does not permit any alteration, modification, deletion of any entry or condition offered by the tenderer in the e- Tender, after closure of the electronic tender box.
Rights Of The Railway To Deal With Tender: The authority for the acceptance of the tender will rest with the Railway. It shall not be obligatory on the said authority to accept the lowest tender or any other tender and no tenderer(s) shall demand any explanation for the cause of rejection of his/their tender nor the Railway to assign reasons for declining to consider or reject any particular tender or tenders.
Vide Railway Board's letter No. 2018/E(LL)/AT/CNR/3 dated 24.01.2018, every contractor must abide by and ensure compliance to statutory provisions of applicable Labour Laws and various Labour Legislations, as applicable, when they are engaging workmen for execution of Works Contracts awarded by Railways. Details of the above are clearly mentioned in the said letter of Railway Board; copy of which can be seen in the Document Section of this Tender. 'Successful Bidder/tenderer' or 'Contractor' shall have to submit an Undertaking stating that they shall abide by the above instructions meticulously, to pay the Minimum Wages and others facilities as per provisions of the above Labour Legislations/Laws; and in case of any deviation/noncompliance in respect of above laws/legislations; or any complaint is received to that effect, the Contractor will be solely responsible and Railway will take up necessary punitive/penal proceedings under relevant laws against the default/accused Contractor in consultation with Labour Authorities and black list them nationally. All bidders are once again advised to take a serious note of these issues and follow the instruction laid in the said letter of Railway Board thoroughly, both in letter and spirit. Copy of the said latter of Railway Board is furnished at the Document Section.
The contractor shall make his own arrangement for the accommodations of his staff, materials; tools , uniform etc, Electricity for the purpose of the execution of work against this contract may be arranged by Railway.
Dress Code: The Tenderer must ensure that their staffs always ware uniform such as Shirt, Trouser, Light Blue Color Fluorescent Jacket, helmet, Gloves, and Industrial Boot. No contractual staff should allow to do work without this uniform. Laminated photo identity card with photo to be available with every contractual staff at all time.
The Tenderer/Contractor will have to accept and opt to take payment from Railway through a Letter of Credit (LC) arrangement, Modalities of the same will be as per Director Finance/CCA, Railway Board letter No. 2017/AC II/9/10 Pt. I dated 20.02.2018 (RBA No. 10/2018), 2017/AC II/9/10 Pt. 3 dated 09.05.2018 (RBA No. 48/2018)and 2018/CE-I/CT/9 dated 04.06.2018, ; copies of which are available in the Document Section of this Tender. However, this is subject to the required system has already been finalised and become operative by the concerned Accounts Department of Railway at any point of time. Therefore, the Tenderer has to agree in this respect and exercise his/her/their Option to this effect as per format available in the Document Section.
Tenderers Credentials: Documents testifying tenderers previous experience and financial status should be uploaded along with the tender or produced when desired by competent authority of the Railway. Tenderer(s) should submit his/their offer along with his / their credentials to establish: (i) His capacity to carry out the works satisfactorily. (ii) His financial status supported by Bank reference and other documents. (iii) Certificates duly attested and testimonials regarding contracting experience for the type of job for which tender is invited with list of works carried out in the past.
Provisions of Employees Provident Fund and Miscellaneous Provisions Act, 1952:
Contractor / tenderer shall have to be registered under EPF/ESI in terms of employees Provident fund and Miscellaneous Provision Act, 1952
Contractor/ tenderer shall have to fo llo w all the stipulations regarding applicability of the Contract Labour (Regulation & Abolition ) Act , 1970/ Rules, 1950.
Contractor / Tenderer shall have to follow all the precautionary measures for safety of the workers in terms of West Bengal Factory Rules,1958.
The tenderer shall have sound financial capability to undertake the job successfully.
Banker's certificate mentioning details of current account shall be submitted.
The tenderer shall income tax, PAN on the name of agency or the proprietor as the case may be.
There shall be an overall binding of GCC, 2022.
Tenderer must download, duly sign, scan and upload the Tender Document and all other Documents available in the Document Section except General Condition of Contract (GCC), in PDF form.
The contractor has to provide ID Cards which are to be countersigned by Competent Authority of the Jheel Siding Depot for the staffs working under them.
SAFETY MEASURES: The contractor shall take all precautionary measures in order to ensure the protection of his own personal moving about or work in the Railway premises, but shall then conform to the rules and regulations of the railways. The contractor shall abide by all Railway regulations in force for the time being and ensure that the same are followed by his representatives, agent or sub-contractor of work men. He shall give due notice to his employees and workers about the provisions of the para. The contractor shall indemnify and keep the Railway administration indemnified and harmless against all actions, suits, claims, demands, other charges or expenses arising in connection with any accident, death or injury sustained by any person (s) within the Railway premises and any loss or damage to Railway property sustained, due to the acts or omissions of the contractor, or his staff during the execution of this contract irrespective of whether such liability arising under the workmen compensation Act 1923 or any other stature in force for the time being.
Tenderer have to cautious regarding the engagement of Labour about the subject work.As per Railway Board letter NO: 2019/sec.(Int.)/51/7/2-23 New Delhi,dt: 16.08.2020 & IGCum-PCSC/RPF/ER's letter no. SC.20/43/45/Order Circular/2021 dt:23.08.2021,Contractor should not engage any Bangladeshi,Rohingyas or any other foreigner in India as a worker during the exccution of work. If any worker found during the execution of work, the contractor will solely be responsible and action will be taken as per extent rule.
Partnership Deeds, Power Of Attorney Etc. : The tenderer shall clearly specify whether the tender is submitted on his own or on behalf of a partnership concern. If the tender is submitted on behalf of a partnership concern, he should submit the certified copy of partnership deed along with the tender and authorization to sign the tender documents on behalf of partnership firm. If these documents are not enclosed along with tender documents, the tender will be treated as having been submitted by individual signing the tender documents. The Railway will not be bound by any power of attorney granted by the tenderer or by changes in the composition of the firm made subsequent to the execution of the contract. It may, however, recognize such power of attorney and changes after obtaining proper legal advice, the cost of which will be chargeable to the contractor.
It is responsibility of the tenderer that they ensure to see any corrigendum of the tender to check the corrigendum on the website from time to time.
The Tenderer will have to upload necessary authenticated and proper document in respect of the above, along with Tender Offer; to comply the respective condition of GCC, 2022 or latest to its last amendment in respect of Nature of the firm: Sole proprietorship firm, or, Partnership Firm, or Joint Venture Firm, or Company registered under Companies Act 1956, or a Society. In this regard, Railway Board letter No. 2013/CE-I/CT/O/33/SI (FTS-89623) dated 11.10.2014 may be referred to, which is furnished in the Document Section.
System of Verification of Tenderers Credential:
In all works tender documents, following para may be added in the section describing the qualification and eligibility criteria. "The tenderers shall submit a self- declaration stating that they are not liable to be disqualified and all their statements/documents submitted along with bid are true and factual. Standard format of the Self-Declaration to be submitted by the bidder is enclosed in the Document Section. Non submission of an Self-declaration by the bidder shall result in summary rejection of his/their bid. And It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self-attested by which they/he is qualifying the Qualifying Criteria mentioned in the Tender Document. It will not be obligatory on the part of Tender Committee to scrutinize beyond the submitted document of tenderer as far as his qualification for the tender is concerned." With the submission of the self- declaration as mentioned above, the practice of verification of tenderer's documents by the Railways may be dispensed with. Following clause may also be added to the Instructions to Bidders.
The Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be 25.1.1 necessary for such verification. Any such verification or lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the railway thereunder.
In case of any wrong information submitted by tenderer, the contract shall be terminated, Bid Security, Performance Guarantee (PG) and Security Deposit (SD) of contract forfeited and agency barred for doing business on entire Indian Railways for 2 (Two) years.
Eligibility: (a) Contractual staff should posses minimum qualification i.e. ITI (Fitter) and ITI (Welder) where required. (b) Contractual supervisor must be Diploma Holder (Electrical). (c) Supervisor should be deployed in the ratio of 1:18 (Minimum 01 Supervisor for 18 staff). (d) All certificate should be submitted before commencement of the work. (e) Daily feed back should be given to the concerned supervisor at the end of the work. (f) Tools & vehicles availability should be adequate.
Stripping, Shifting, Scrubbing, Dusting, Cleaning, Fitment, Painting and other allied works of Electrical Items of ICF & LHB type AC Coaches for 03 years at C & W Workshop, Eastern Railway, Liluah.
W_LLH_07_2026-27~ER
W_LLH_07_2026-27
Open
Works - General
36 Months
Howrah, West Bengal
₹0
₹17.0 L
26 Aug 2026
26 Aug 2026
3 Sept 2026
49 items across 2 schedules · ₹8,51,37,896.6 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Stripping of electrical connection of 25 KW Alternator of ICF AC coaches at Bahar line pit. (02 nos. per VU) (S= 0.00, L= 147.14) | Per Coach | 400.00 | 147.14 | 58,856 |
| 2 | Stripping and unloading of 25 KW Alternator from ICF AC Coaches at MR-Shop/L-Shop Lifting Bay and transportation of stripped Alternators from Lifting Bay to Alternator section (AC/OVH) and transportation of overhauled Alternators from Alternator section to Lifting Bay. (02 nos. per VU) (S= 0.00, L= 103.91) | Per Coach | 400.00 | 103.91 | 41,564 |
| 3 | Stripping of electrical connection of 25 KW RRU/ERRU of ICF AC coaches at Bahar line. (02 nos. per VU) | Per Coach | 400.00 | 147.14 | 58,856 |
| 4 | Stripping/unloading of 25 KW RRUs/ERRUs from ICF AC Coaches at MR-Bahar Line and transportation of stripped RRUs/ERRUs from MR-Bahar Line to Alternator section (AC/OVH) and overhauled RRUs/ERRUs from Alternator section to MR-Bahar Line. (02 nos. per VU) (S= 0.00, L= 103.91) | Per Coach | 400.00 | 103.91 | 41,564 |
| 5 | Stripping of electrical connection of both RMPU of ICF and LHB type AC coaches. (02 nos. per VU) (S= 0.00, L= 183.94) | Per Coach | 2380.00 | 183.94 | 4,37,777.2 |
| 6 | Stripping/unloading of RMPUs and existing roof cover of ICF and LHB type AC coaches and transportation of the same from Bahar Line to RMPU OVH Sections and POHed RMPUs to nominated coach at RMPU fitting point. (02 nos. per VU) (S= 0.00, L= 919.67) | Per Coach | 2380.00 | 919.67 | 21,88,814.6 |
| 7 | Disconnection and stripping/ unloading of RMPU Control Panel, from incoming ICF type AC Coaches, transportation of the same from Bahar Line to Panel Board OVH Sections and transportation of POHed Panel Boards to nominated coach including mechanical fitment (02 nos. per VU). (S= 0.00, L= 184.07) | Per Coach | 400.00 | 184.07 | 73,628 |
| 8 | Stripping of electrical connection of Fan (12 nos. per VU) & Light Fitting (28 nos. per VU) of ICF type AC Coaches. (S= 0.00, L= 441.43) | Per Coach | 400.00 | 441.43 | 1,76,572 |
| 9 | Stripping/unloading of Fan (12 nos. per VU), Light Fitting (28 nos. per VU) of ICF type AC coaches and transportation of the same from Bahar Line to respective OVH Section and transportation of POHed above equipments to nominated coach at nominated place. (S= 0.00, L= 690.27) | Per Coach | 400.00 | 690.27 | 2,76,108 |
| 10 | Mechanical fitment of Fan to nominated coach of ICF type AC coaches at nominated place. (Nut bolt and pad are in scope of Rly. Supply) (S= 0.00, L= 441.43) | Per Coach | 400.00 | 441.43 | 1,76,572 |
| 11 | Stripping/unloading of Battery Charger set / 750V, 60 KVA Transformer (1 no. per VU) of ICF and LHB type AC coaches including stripping of Electrical Connection and transportation of the same from Bahar line to respective OVH Sec. and POHed Battery/ Charger/ 750V Tr. to nominated place for fitment. (S= 0.00, L= 552.22) | Per Coach | 2380.00 | 552.22 | 13,14,283.6 |
| 12 | Stripping of Battery Box including cell lead connection from ICF type AC coaches and transportation to nominated place, scrapping, painting of the same and also transportation to nominated coach for fitment. (02 nos. per VU). Paints are the scope of Rly. supply. (S= 0.00, L= 552.22) | Per Coach | 400.00 | 552.22 | 2,20,888 |
| 13 | Stripping of Battery Box of LHB type AC coaches including cell lead connection and transportation to nominated place, scrapping, painting of the same and also transportation to nominated coach for fitment. (01 no. per VU). Paints are the scope of Rly. Supply. (S= 0.00, L= 882.88) | Per Coach | 1980.00 | 882.88 | 17,48,102.4 |
| 14 | Disconnection and stripping of IVC (04 nos. per VU) at LHB section, transportation of the same to respective overhauling section and overhauled/new above equipments to nominated coach at nominated place. (S= 0.00, L= 644.26) | Per Coach | 1980.00 | 644.26 | 12,75,634.8 |
| 15 | Fitting of overhauled/new IVC (04 nos. per VU) after taking from respective overhauling section to nominated coach (LHB/AC) at nominated place.(S=0.00,L=1181.91) | Per Coach | 1980.00 | 1,181.91 | 23,40,181.8 |
| 16 | Disconnection and stripping of Pump (02 nos. per VU) with cradle of LHB type AC coaches, transportation of the same to respective overhauling section and mechanical fit overhauled /new above equipments to nominated coach at nominated place.(S= 0.00, L= 809.31) | Per Coach | 1980.00 | 809.31 | 16,02,433.8 |
| 17 | Disconnection and stripping of Pump (02 nos. per VU) with cradle of ICF type AC coaches, transportation of the same to respective overhauling section and overhauled /new above equipments to nominated coach at nominated place for fitment.(S= 0.00, L= 644.24) | Per Coach | 400.00 | 644.24 | 2,57,696 |
| 18 | Air blowing to electrical junction boxes (04 nos. per VU) and switch board cabinet (01 no per VU) of LHB type AC coaches at nominated place and fresh air filter (04 nos. per VU) replaced. Fresh air filter is the scope of Rly. supply.(S= 0.00, L= 1103@46<41@ | Per Coach | 1980.00 | 1,103.6 | 21,85,128 |
| 19 | Disconnection and stripping of Accident Emergency Light (AEL) (04 nos. per VU) of ICF and LHB type AC coaches and transportation of the same to respective section and fitment of overhauled/new above equipments to nominated coach at nominated place. AEL are the scope of Rly. supply.(S= 0.00, L= 294.29) | Per Coach | 2380.00 | 294.29 | 7,00,410.2 |
| 20 | Stripping of under frame wiring of corrosion involved in ICF and LHB type AC Coaches and rewiring of the coaches after completion of corrosion repair by Mech. Dept. (Wiring materials are the scope of Rly. Supply) (S= 0.00, L= 575.22) | Per Coach | 1260.00 | 575.22 | 7,24,777.2 |
| 21 | Cleaning of Light fitting Diffuser (33 nos. per VU), Switch plate including Mobile Charger (35 nos. per VU) of ICF and LHB type AC Coaches. (S= 0.00, L= 184.07) | Per Coach | 2380.00 | 184.07 | 4,38,086.6 |
| 22 | Repairing of switch board cabinet door of LHB type AC coaches (01 no per VU) and local main supply box cover (02 no per VU) (S= 0.00, L=441.43) | Per Coach | 1692.00 | 441.43 | 7,46,899.56 |
| 23 | Transportation of electrical defective/scrap material to nominated place. New material from Dy.CMM store to AC/FINISHING STORE or power car store and same to nominated place/nominated coach @ 02 Ton per day for 26 days in a month. (S= 0.00, L= 882.88) | Tonne | 2808.00 | 882.88 | 24,79,127.04 |
| 24 | Checking and repairing/replacing of canvas cloth at the extension part (Between RMPU bellow to inside coach body) of supply and return air path of ICF and LHB type AC coaches. (Canvas cloth are in scope of Rly. Supply) (S= 0.00, L= 735.74) | Per Coach | 2380.00 | 735.74 | 17,51,061.2 |
| 25 | Corrosion repair of 25 KVA underslung Inverter with 200 Ampere Battery Charger of ICF AC Coaches at nominated place(03 no per VU ). (S= 0.00, L= 1013.06) | Per Coach | 400.00 | 1,013.06 | 4,05,224 |
| 26 | Corrosion repair of 25 KVA underslung Inverter with 200 Ampere Battery Charger of ICF AC Coaches at nominated place(03 no per VU ).(S= 0.00, L= 783.83) | Per Coach | 2380.00 | 783.83 | 18,65,515.4 |
| 27 | Making hole with Magnetic drill machine after surface cleaning at underframe for fitment of cable-tray, Feeder pipe clamp, Battery box, Capacitor box, Feeder Junction box, REBC and Transformer (5 KVA & 60 KVA) after corrosion work. (Hole size varies from 6 mm to 20 mm) (S= 0.00, L=3221.21) | Per Coach | 1800.00 | 3,221.21 | 57,98,178 |
| 28 | Stripping as well as fitting of Wago set fitted at din-rail along with Electrical Connection behind 04 nos. Lab wall.(S= 0.00, L= 450.97) | Per Coach | 1260.00 | 450.97 | 5,68,222.2 |
| 29 | Stripping of feeder Junction box (04 nos/VU) including Electrical connection and transport to nominated place. Fitting of same including electrical Connection after overall cleaning of box outside at nominated coach. (S= 0.00, L=563.71) | Per Coach | 1080.00 | 563.71 | 6,08,806.8 |
| 30 | Stripping of all Light fittings including mobile charging points and switch plate of LHB ac Coaches. (S= 0.00, L= 450.97) | Per Coach | 720.00 | 450.97 | 3,24,698.4 |
| 31 | Providing 415 V, 3 Ph AC External Power Supply through Pre Cooling Cable to LHB type AC Coaches at different Line position over Liluah Workshop. The Work includes both side Connection, Disconnection, Safe Handling and proper storage of External Power Supply Cable. The activities will be carried out at nominated location from 10.00 Hrs to 20.00 Hrs. Covering an average ten (10) Coaches per day, i.e. 250 coach per month. (S= 0.00, L= 383.50) | Per Coach | 9000.00 | 383.5 | 34,51,500 |
| Schedule total | ₹3,43,37,166.8 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ShramSuvidha2-0.pdf
ATTACHMENT
checklist.pdf
ATTACHMENT
AnnexureV.pdf
ATTACHMENT
BankGuaranteeBondAnnexure-VIA.pdf
ATTACHMENT
AnnexureVIB.pdf
ATTACHMENT
RBA_10_21022018.pdf
ATTACHMENT
RBA__48_09052018.pdf
ATTACHMENT
GCCApril-2022.pdf
ATTACHMENT
CommercialCompliance2022.pdf
ATTACHMENT
GeneralCompliance2022.pdf
ATTACHMENT
Undertaking2022.pdf
ATTACHMENT
TenderForm.pdf
ATTACHMENT
VerificationofContractualStaff.pdf
ATTACHMENT
OnlinePoliceVerification.pdf
ATTACHMENT
2018_CE-I_CT_9Date04_06_2018LetterofCredit.pdf
ATTACHMENT
ConservencyCharges07-09-2021.pdf
ATTACHMENT
RBE_20_18.02.2020LabourLaws.pdf
ATTACHMENT
LabourDataShramikKalyanPortal17.10.2018.pdf
ATTACHMENT
InsuranceSuretyBondDated.09.01.2025inGCC.pdf
ATTACHMENT
AdvanceCorrectionSlip1to10toGCCcombined_compressed.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111-compressed.pdf
ATTACHMENT
ScopeofWork.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].